1. Introduction
With the growing global challenges posed by climate change, reducing greenhouse gas emissions has become a critical priority for nations worldwide [
1]. In line with the international commitments, China officially introduced the “Dual Carbon Objectives” in 2020, setting goals to reach carbon peak by 2030 and carbon neutrality by 2060 [
2]. Within this framework, the construction sector, a major contributor to global energy-related emissions, faces significant pressure to transition to low-carbon practices [
3]. Accurate carbon accounting mechanisms in construction projects serve three essential functions: (1) providing empirical support for climate policy development, (2) driving industry-wide decarbonization through standardized measurement protocols, and (3) enabling organizations to assess their emission profiles, implement targeted carbon emission mitigation strategies, and enhance sustainability-driven competitiveness. These multifaceted benefits highlight the methodological and practical importance of establishing robust carbon quantification systems to meet climate targets while promoting green economic growth [
4].
Life-cycle assessment (LCA) is a systematic environmental evaluation tool that plays a crucial role in quantifying carbon emission in construction projects [
5,
6,
7,
8,
9]. This method is capable of evaluating environmental impacts throughout the entire life -cycle of products, processes, and services—from raw material extraction to final disposal—enabling the identification of carbon emission sources at distinct life-cycle stages and supporting targeted mitigation strategies [
10,
11,
12]. Previous studies have demonstrated the effectiveness of LCA applications, for example, Warrier et al. [
13] classified the sources of uncertainty in building LCA based on a review of 48 global case studies, while Trabucco et al. [
6] conducted a comparative LCA analysis of steel and mass timber building structures, revealing that timber-based solutions result in a 25% lower global warming potential compared to steel or hybrid alternatives. Although the construction stage is often relatively short compared to the full life-cycle, it exhibits disproportionately high carbon emission intensity (per unit length), even with moderate cumulative emissions. This paradox highlights the urgent need to optimize emission reduction strategies during this critical stage. However, currently the construction industry lacks a standardized low-carbon construction technology system, with three key research gaps: (1) insufficient research on carbon emission sources and carbon accounting methods specific to the construction stage of construction projects, (2) lack of standardized measurement protocols for on-site emissions, and (3) limited empirical data to inform evidence-based emission control policies [
14]. These challenges impede the accurate quantification and effective management of construction-stage carbon emissions, hindering progress toward our decarbonization targets.
The reliability of carbon accounting results is intrinsically linked to the quality of emission factor databases [
15]. While internationally recognized resources such as the
Inventory of Carbon and Energy (ICE) [
16,
17], the
European Environment Agency's Emission Factor Database (EU-EFDB) [
18,
19], and the
Intergovernmental Panel on Climate Change Emission Factor Database (IPCC-EFDB) [
20,
21] have become mainstream references, their application in Chinese construction sector exposes two key limitations. First, current databases suffer from temporal fragmentation, typically focusing on operational stages while overlooking embodied emissions from material production, which represent a significant portion of total building emissions, as indicated in various life-cycle assessment studies [
22]. Second, the absence of standardized life-cycle boundaries compromises cross-project comparability, particularly in the context of China's widely-used prefabrication techniques, which alter traditional emission distribution patterns [
23]. These gaps highlight the need for localized life-cycle assessment frameworks that incorporate China-specific construction practices and material supply chain characteristics [
4].
The evolution of carbon accounting software reveals distinct developmental trajectories between Chinese and international markets. As part of global decarbonization efforts, these tools have become crucial for accurate emission quantification. International solutions, benefiting from earlier research developments, exhibit advanced functionalities, as shown in
Table 1. For example, SimaPro platform integrates complex operational workflows from multiple industries through advanced algorithmic architecture, facilitating comprehensive evaluations of carbon emissions across various environmental impact categories [
24]. Similarly, Umberto software supports comprehensive life-cycle assessments (LCA) by evaluating the environmental impact of different product systems, enabling comparisons of various options based on multiple impact categories, and providing insights into sustainability improvements for system optimization [
25]. These capabilities contrast with Chinese domestic solutions, which remain in earlier stages of development, highlighting some technological gaps in China's current carbon management infrastructure.
Although China's carbon accounting sector emerged later than its international counterparts, it has made significant strides through localized research frameworks. A notable example is SinoCarbon's Carbon e-Management, which offers cost-effective Software as a Service (SaaS) solutions for small and medium-sized enterprises. This platform has been shown to significantly reduce carbon management implementation costs compared to traditional methods [
26]. While these advancements highlight recent technological innovations, there are still persistent gaps in the integration of life-cycle data, which pose challenges for their broader application in real-world construction engineering.
As summarized in
Table 1, the comparison of carbon accounting software highlights their respective strengths. SimaPro, a leading tool in life-cycle assessment (LCA), facilitates multi-impact category carbon assessments and supports detailed environmental decision-making [
24]. Umberto, primarily used for comprehensive product system evaluations, focuses on identifying sustainability improvements to optimize system performance [
25]. Gabi offers precise LCA calculations and a comprehensive database for efficient data retrieval [
27]. Within China, Sinocarbon's cloud-based model reduces implementation costs for small and medium-sized enterprises (SMEs) [
26]. However, the construction stage database remains incomplete, and further research is needed to systematically integrate carbon accounting with specific construction steps.
Despite the widespread use of various methods and tools for carbon emission calculation in construction projects, significant deficiencies persist. A major issue with existing carbon accounting methods is their failure to effectively integrate construction cost quota data, which undermines both their accuracy and applicability. Additionally, many carbon accounting databases are limited to specific fields or project types and lack cross-project data support, which restricts their broader application. Furthermore, the majority of carbon accounting software available is standalone, missing key functionalities such as online collaboration and real-time updates, which are essential for more dynamic and accurate emissions tracking. To overcome these limitations, this study builds upon life-cycle assessment (LCA) methods and previous research on carbon emission reduction. The proposed framework focuses on a systematic life-cycle carbon accounting method that follows the principles of life-cycle assessment (LCA) in accordance with ISO 14040 standard [
28], while also incorporating carbon accounting analysis during the construction stage using the Standard for quantity calculation of housing construction and decoration projects
Standard for Quantity Calculation of Housing Construction and Decoration Projects (GB/T 50854-2024) [
29] and
Quotations for Highway Engineering Budgeting (JTG/T 3832-2018) [
30]. The methodology integrates three localized emission databases, derived from international references such as the
Inventory of Carbon and Energy (ICE) [
16,
17], the
European Union Emission Factor Database (EU-EFDB) [
18,
19], and the
Intergovernmental Panel on Climate Change (IPCC-EFDB) [
20,
21], as well as Chinese national standards like the
Building Carbon Emission Calculation Standard (GB/T 51366-2019) [
31], collectively covering a wide range of China-specific construction materials. In addition, a web-based software for the Construction Project Carbon Accounting System (CPCAS) has been developed, by utilizing PHP 8.1 and Node JS 18, which addresses the limitations of traditional standalone systems by enabling multi-user online collaboration, data sharing, and real-time updates. This framework was later applied to three representative real-world construction projects in China, which included National Highway 320 project, Hangzhou-Shaoxing-Ningbo Expressway project, and National Highway G25 project, to assess the results of automated carbon emission calculations and the feasibility of the proposed carbon accounting system in real-world construction projects.
By conducting carbon emission calculations and comparative analyses for the three real-world construction projects, and comparing the three different carbon emission factor databases, the feasibility and effectiveness of the proposed methods, tools, and databases are validated. The results indicate that the carbon accounting method developed in this study is both applicable and stable, capable of calculating life-cycle carbon emissions for construction projects. This study is expected to provide more useful insights into the development of carbon emission calculation methods, carbon emission factor databases, and carbon accounting software for the real-world construction projects.
Figure 1 summarizes the structure of the current paper, which is organized into five sections.
Section 1 introduces the development of carbon accounting methods and related software.
Section 2 details the creation of a web-based carbon accounting system.
Section 3 covers the construction of three emission databases, integrating international references and Chinese domestic standards.
Section 4 applies the developed carbon accounting system to three real-world construction projects, including National Highway 320 project
, Hangzhou-Shaoxing-Ningbo Expressway project, and National Highway G25 project
, and analyze their life-cycle carbon emissions.
Section 5 presents a comparative analysis of the carbon emission results and offers practical recommendations for possible future applications. The standards and guidelines referenced in this study include several Chinese standards and databases, such as the
Standard for Building Carbon Emission Calculation(GB/T 51366-2019) [
31] and the
China's Important Conference Paper Database (CPCD) [
32].
3.Use stage snalysis
The use stage of a construction project consists of seven processes: operation, maintenance, repair, replacement, renovation, operational electricity consumption, and operational water consumption. Since data for the remaining processes are difficult to obtain, this study uses “replacement” to represent the first five processes. The calculation formula is as follows:
where
represents carbon emissions generated during the material replacement of a construction project;
represents carbon emissions generated in the operational stage of a construction project due to electricity consumption;
represents carbon emissions generated in the operational stage of a construction project due to water consumption.
The carbon accounting formula for the replacement stage is as follows:
where
represents the expected lifespan of material i, which is 60 years for building projects and 120 years for infrastructure;
represents default service life of material i, rounded up to the next integer.
The carbon accounting formula for electricity consumption in the operational stage of the construction project is as follows:
where
represents the proportion of clean energy used;
is measured via smart meter data in kilowatt-hours (kWh);
represents the carbon emission factor associated with electric consumption in the region where the i-th part of the building project is located.
The carbon accounting formula for water consumption in the operational stage of the construction project is as follows:
where
represents the water usage of the i-th part of the construction project;
represents the carbon emission factor associated with water consumption in the region where the i-th part of the building project is located.
3. Development of Carbon Accounting Tool for Construction Project
3.1. Software Design Framework
The establishment of the carbon accounting tool aims to enable users to conduct whole-life-cycle carbon accounting for one or more scenarios of actual construction projects, including both operational and embodied carbon, and to perform comparative studies to identify corresponding carbon reduction measures. Given the widespread use of construction cost estimation and budget software in construction projects, this software is designed with user convenience in mind. It incorporates a feature for directly importing bill of quantities, addressing practical needs. Therefore, as illustrated in
Figure 7, the system is structured around the following six core functional modules,
Importing basic project information: This module allows users to input essential project details, including project name, type, location, and timeline (start and end dates).
Building the LCA model: This module enables users to create one or more life-cycle assessment (LCA) models based on the project details and scenarios.
Selecting the LCA database: This module provides users with the option to choose from different LCA databases based on the specific needs of the project scenario: the customized ICE, the customized EU-EFDB, and the customized IPCC-EFDB.
Whole-life-cycle carbon accounting for the construction project: This module enables users to conduct whole-life-cycle carbon accounting for multiple processes and stages of the construction project, including the production stage, construction stage, use stage, end-of-life stage, and supplementary stage.
Data validation: This module highlights any errors in the data within the model to improve the accuracy of the LCA model.
LCA carbon footprint results overview: This module clearly presents the results of the LCA carbon accounting, including carbon emissions for each life-cycle stage, construction-stage statistics, bar and pie charts depicting emissions and their respective proportions across stages, and allows for comparison of multiple carbon accounting scenarios to identify potential carbon reduction measures.
3.2. Graphic User Interface (GUI) Design
The Graphical User Interface (GUI) is one of the visible components of the software. This software was developed using the LayUI interface library, leveraging the Windows 11 22H2 operating system and coding tools such as Sublime Text and Visual Studio Code.
In the design of the panel menu, the software utilizes the LayUI interface library to create both the frontend and backend systems. The frontend system includes project management and member management, aiming to provide a platform for carbon accounting and carbon reduction in construction projects. The backend system includes project management, user customization, database management, and system management, aiming to provide a unified platform for editing and managing projects, models, and members. For example, in project management, when the “Project List” option is clicked on, data is asynchronously requested from the backend server (operating on CentOS 8.2.2004) using Asynchronous JavaScript and eXtensible Markup Language (AJAX) technology, and is displayed on the frontend as a dynamic table, facilitating easy viewing by the user. Additionally, the “Project Addition” feature uses LayUI’s form components, along with jQuery (JavaScript Library) for data validation, ensuring that the input data adheres to the system’s requirements.
The software operates on the CentOS (Community ENTerprise Operating System) 8.2 2004 platform, with Nginx (Engine X) 1.18 acting as the web server responsible for processing client Hypertext Transfer Protocol (HTTP) requests and forwarding them to the PHP (Hypertext Preprocessor) 7.3 engine. PHP-7.3, in conjunction with MySQL (My Structured Query Language) 5.6, collaborates to provide data support for the panel menu operations.
For permission management, the software uses LayUI’s event mechanism and Cookie technology. When the frontend sends a request, it includes user authentication information, which is validated by the backend using PHP session management mechanisms. For example, in the planEdit operation, the backend performs a detailed check on the user’s request based on their assigned permissions. Only users with the corresponding permissions are allowed to complete the operation, ensuring the security of the system and the integrity of the data.
As shown in
Figure 8, the software’s user interface is depicted, highlighting its structure and GUI design in use.
3.3. Frontend-Backend System Integration
In the carbon accounting software, the frontend and backend systems work closely together to ensure the smooth operation of the software. After logging in, the user can select a model to build, choose the appropriate database, and specify the life-cycle accounting stages. The user then determines the data input method for the construction phase and clicks on the carbon accounting function to display the carbon accounting results for the selected model. If the user exits before completing the process, the data is automatically saved to the backend to prevent data loss.
The backend runs on CentOS (Community ENTerprise Operating System) 8.2 2004, with Nginx (Engine X) 1.18 serving as the web server. The PHP (Hypertext Preprocessor) 7.3 engine and MySQL (My Structured Query Language) 5.6 database handle the business logic. The frontend accepts user commands and inputs, transmitting the data to the backend through an Application Programming Interface (API). For example, after the user selects the database and accounting stages, the frontend sends a request, which is received by the backend PHP code. Using the MySQLi (MySQL Improved) extension, the backend processes the data by filtering it based on the selected stages and returns the results to the frontend for display. The seamless coordination between the frontend and backend ensures smooth operation of the software, aiming to provide users with a more efficient carbon accounting service.
As shown in
Figure 9, the software’s frontend-backend workflow chart is illustrated, highlighting the interaction and data transfer between layers and data flow.
4. Engineering Case Studies
4.1. Project Overview
To assess the computational capabilities of the proposed carbon accounting system for construction projects, and analyze life-cycle carbon emission patterns for better mitigation strategies, this study applies the developed software system to three real-world infrastructure construction projects, including (1) the Yuhang Huawu-Fuyang Gaoqiao section of National Highway 320 (NH320), (2) the Hangzhou-Shaoxing segment of the Hangzhou-Ningbo National Expressway (HSY Expressway), and (3)
Section 3 of the Changchun-Shenzhen Expressway (G25) expansion project in Hangzhou (National Highway G25), as shown in
Figure 10. These three projects, all located within Zhejiang Province, China, offer a unique opportunity to compare life-cycle carbon emissions in the same region, providing valuable insights into regional carbon management practices. The representativeness of these projects lies in their diversity and scale, covering a range of infrastructure types, including highways, expressways, and large-scale expressway expansions. For example, the Yuhang Huawu to Fuyang Gaoqiao section of NH320 handles over 100,000 vehicles daily, the HSY Expressway spans 4.560 km and enhances regional connectivity, and the 35.418 km expansion of the G25 Changchun-Shenzhen Expressway involves complex components like bridges and tunnels. These projects represent a diverse range of infrastructure, from highways to expressways, with varying scales and complexities, providing a diverse dataset for validating the proposed carbon accounting method. The comparison is essential for refining carbon emission factors and improving the accuracy of carbon accounting in large-scale infrastructure construction projects. The three key infrastructure projects within Zhejiang Province, China are detailed as follows,
1. National Highway 320 (NH320), Yuhang Huawu to Fuyang Gaoqiao Section
The Yuhang Huawu to Fuyang Gaoqiao section of National Highway 320 (NH320) is an 8.673 km long road project designed as a dual six-lane, first-class highway. Located between Yuhang District and Fuyang District in Zhejiang Province, this section plays a pivotal role in enhancing the connectivity of Zhejiang’s urban centers. The construction of this road will significantly reduce travel time between major cities and boost the economic development of the surrounding areas.
2. Hangzhou-Shaoxing-Ningbo Expressway (HSY Expressway)
The Hangzhou-Shaoxing-Ningbo Expressway (HSY Expressway), connecting Hangzhou, Shaoxing, and Ningbo, covers a segment of 4.560 km and is a vital transportation artery for the Yangtze River Delta metropolitan area. This project, located along the southern coast of Hangzhou Bay, is designed to improve regional connectivity and support economic growth in one of China's most developed regions. The expressway’s construction will contribute to alleviating traffic congestion, promoting regional commerce, and facilitating the implementation of national economic strategies of China.
3.Changchun-Shenzhen Expressway (G25), Expansion Project in Hangzhou
The expansion of
Section 3 of the Changchun-Shenzhen Expressway (G25) in Hangzhou covers a length of 35.418 km. This large-scale infrastructure project involves the construction of subgrades, bridges, tunnels, interchanges, and other critical components. The G25 expansion is an essential project that will enhance the transportation network between Hangzhou and other major cities, thereby improving logistics and supporting urban development. With its focus on modernizing infrastructure, this project also helps demonstrate the application of advanced technologies in road construction.
The geographical locations and construction site layouts of these projects are illustrated in
Figure 10, with key project specifications summarized in
Table 6, and related statistics of life-cycle data listed in
Table 7. In the production stage, the types and quantities of materials are determined based on the materials required during the preparation stage, just before the project begins. In the construction stage, due to the large volume of data, the direct importation of the bill of quantities is employed to ensure the accuracy of the calculations. In the use stage, the maintenance lists are established based on the “
Technical Specifications of Maintenance for Highway (JTG H10-2009)” [
41] and “
Technical Specifications for Maintenance of Highway Asphalt Pavement (JTG 5142-2019)” [
42]. In combination with a 25-year project operation period [
43], the lists for replacement processes, electricity consumption, and water consumption are determined . The end-of-life stage is assessed by onsite surveys, information provided by the project team, and demolition data from the engineering department, which help establish the lists for waste transportation methods and distances. In the supplementary stage, data is collected through field research, project team information, and actual project conditions to determine the number of plants, the spacing between them, the types and quantities of reusable materials, and the amount of wood products used.
To ensure consistency in carbon accounting results across all projects, the customized
ICE was used for analysis. During the construction stage, data integration was achieved directly through the bill of quantities, while other stages (production, use, end-of-life, and supplementary) may rely on manual data entry. Due to space constraints, the paper only covers a selective subset of visuals for demonstration of software interface, where
Figure 11 displays the carbon accounting interface for the construction stage of National Highway G25, while
Figure 12 shows the aggregated results across all stages.
4.2. Carbon Accounting Results and Comparative Analysis
With the developed software, the life-cycle carbon emission in real-world construction engineering projects can be estimated by systematically integrating construction engineering cost data into the online carbon accounting platform, and utilizing the customized
ICE for carbon emission factors. As shown in
Figure 13, the bar and pie charts illustrate total emissions and the distribution of emissions across different stages, respectively. The small-scale National Highway 320 project emitted 4.25×10⁴ kgCO₂e, with stage-wise contributions of 46% for production stage, 30% for construction stage, 17% for use stage and 7% for end-of-life stage. The contribution from use stage is based on the assumption of a 25-year service life, incorporating carbon emissions from the use of alternative materials, electricity consumption, and water usage during the operational stage, all of which are integrated into the platform’s calculations. The medium-scale Hangzhou-Shaoxing-Ningbo Expressway project emitted 2.13×10⁸ kgCO₂e, with corresponding contributions of 46% (production), 30% (construction), 18% (use), and 6% (end-of-life). Similarly, the large-scale National Highway G25 project recorded 8.34×10⁹ kgCO₂e, with the following contributions: 45% (production), 30% (construction), 18% (use), and 7% (end-of-life). Cross-project analysis reveals a consistent distributional pattern for carbon emission in the construction projects: the production stage consistently dominated emissions (≈45%), followed by construction (≈30%), use (≈18%), and end-of-life stages (≈7%). The supplementary stage is the carbon reduction stage. The more materials reused, the higher the content of wood products, and the more greenery planted in the project, the greater the carbon reduction will be. In all three projects, the proportion of carbon sequestration through greening in the supplementary stage is the highest, reaching 80.1%, 79.8%, and 84.3%, respectively. In the future, the amount of green vegetation can be increased, or the material reuse rate and the proportion of wood products in materials can be increased, to achieve the goal of carbon neutrality.
The building material-level analysis (
Figure 14) reveals the dominance of cement across all projects, accounting for 51.0-53.6% of emissions in the production stage. Secondary materials vary by project: crushed stone (18.1%) and steel reinforcement (10.0%) in National Highway 320 project; steel reinforcement (18.8%) and stone (9.8%) in the Hangzhou-Shaoxing-Ningbo Expressway project; insulation materials (17.9%) and crushed stone (10.1%) in National Highway G25 project. Notably, the top five materials collectively contribute 82.0-84.6% of emissions, with cement alone contributing over 51% in each project. This pattern suggests that optimizing cement production and exploring alternative low-carbon adhesives could yield significant emissions reductions.
In this work, particular attention is paid to the construction stage, due to its complexity in carbon quantification, substantial human activity, and significant mitigation potential. The existing research gaps in construction-stage emissions measurement also require further investigation. Our model leverages construction cost quota to enable more accurate quantitative analysis of this stage, as shown in
Figure 15, the carbon emissions of the top three sub-projects in each of the three projects are significantly higher than those of the remaining sub-projects. From the fourth sub-project, there is a significant decline in carbon emissions. Therefore, a focused analysis is conducted on the top three sub-projects for each project as follows.
For National Highway 320 project, the carbon emissions in the construction stage are approximately 1.32×10⁴ kgCO₂e. The top sub-projects account for 67.24% of the total emissions, with the top three sub-projects contributing 51.01% of the emissions. For the Hangzhou-Shaoxing-Ningbo Expressway project, the carbon emissions in the construction stage are about 6.63×10⁷ kgCO₂e. The top eight sub-projects contribute 67.53% of the total emissions, and the top three sub-projects account for 51.05%. For National Highway G25 project, the carbon emissions in the construction stage are approximately 2.61×10⁹ kgCO₂e. The top eight sub-projects contribute 66.35% of the total emissions, with the top three sub-projects contributing 44.76%.
These results indicate that the top three sub-projects in each project contribute over 44% of the total carbon emissions in the construction stage, highlighting substantial carbon reduction potential. Therefore, to achieve more effective carbon mitigation, it is crucial to focus on the emissions from material transport, construction installation, and machinery usage for the top three carbon-emitting sub-projects in the construction stage of the above projects.
5. Comparison of Carbon Emission Estimation Based on Different Databases
5.1. Similarities in Carbon Emission Estimated by the Three Customized Databases
To assess the consistency and accuracy of carbon accounting results across different databases, a comparison was conducted based on data from three real-world construction projects. By analyzing the carbon emissions calculated through three distinct databases, we can better understand the variations and potential causes behind these differences.
Table 8 shows the total carbon emissions for the three projects calculated using the three databases, while
Figure 16,
Figure 17,
Figure 18,
Figure 19,
Figure 20 and
Figure 21 present life-cycle carbon accounting results for National Highway 320, Hangzhou-Shaoxing-Ningbo Expressway, and National Highway G25 using the customized
EU-EFDB and
IPCC-EFDB. These results, in conjunction with
Figure 13,
Figure 14 and
Figure 15 (representing carbon emission accounting results with the customized ICE), reveal both differences and similarities.
Although the carbon accounting results from the three databases exhibit differences in specific values, they show a high degree of consistency in overall trends. For instance, in the case of the entire life-cycle carbon emissions of the National Highway 320 project, the proportion of carbon emissions across different stages exhibits similar trends across all three databases. In the production stage (as shown in
Figure 13,
Figure 16 and
Figure 19), the carbon accounting proportion is 45.61% for the customized
ICE, 45.72% for the customized
EU-EFDB, and 46.52% for the customized
IPCC-EFDB. The values are close, with deviations of less than 1%, demonstrating that the use stage is the primary source of carbon emissions in the LCA results for this project, a trend that remains consistent across all three databases. Additionally, the order of materials in terms of carbon emissions is also consistent across the three databases. For the National Highway G25 project (as shown in
Figure 14,
Figure 17 and
Figure 20), cement, insulation materials, gravel, steel reinforcement, and plastic are consistently the top five materials contributing to carbon emissions in the production stage, with only minor differences in the specific proportions, but the ranking remains the same.
Furthermore, in the carbon emissions proportion of sub-projects, the results from the three databases also show a high degree of similarity. For example, in the Hangzhou-Shaoxing-Ningbo Expressway project (as shown in
Figure 15,
Figure 18 and
Figure 21), whether considering carbon accounting values or carbon emissions intensity, the top five sub-projects by proportion of emissions are consistently subgrade soil, excavation works, pavement surface layers, special subgrade treatment works, protective works, and tunnel works. The carbon emissions proportion error is within 3%, also indicating a high level of consistency.
5.2. Differences in Carbon Emission Estimated by the Three Customized Databases
Upon analyzing the carbon accounting results for the National Highway 320, Hangzhou-Shaoxing-Ningbo Expressway, and National Highway G25 projects, some differences were also observed in the results from the different databases. Specifically, the carbon accounting result for the National Highway 320 project was highest in the customized EU-EFDB, with a total carbon emission of 1.29×105 kgCO₂e, followed by 4.25×104 kgCO₂e in the customized ICE and 3.50×104 kgCO₂e in the customized IPCC-EFDB. The EU-EFDB result was 206.03% higher than that of ICE and 262.50% higher than that of IPCC-EFDB.
For the Hangzhou-Shaoxing-Ningbo Expressway project, the highest carbon accounting value was found in the customized IPCC-EFDB, with a total carbon emission of 6.54×108 kgCO₂e. This was followed by 5.99×108 kgCO₂e in the customized EU-EFDB and 2.13×108 kgCO₂e in the customized ICE. The IPCC-EFDB value was 8.54% higher than EU-EFDB and 25.94% higher than ICE.
In the case of the National Highway G25 project, the carbon accounting result was highest in the customized ICE, with a total carbon emission of 8.39×109 kgCO₂e. This was followed by 3.35×109 kgCO₂e in the customized IPCC-EFDB and 3.29×109 kgCO₂e in the customized EU-EFDB. The ICE value was 112.14% higher than IPCC-EFDB and 111.11% higher than EU-EFDB.
These discrepancies arise from differences in carbon emission factors, calculation methods, and the estimation techniques used for different materials and construction phases across the databases. A more detailed analysis of the causes for these differences, broken down by stage, is provided as follows,
National Highway 320 (EU-EFDB > ICE > IPCC-EFDB)
In the production stage, cement accounted for 51.4% of carbon emissions, and the carbon emission factor in the customized EU-EFDB (0.88 kgCO₂e/kg) was 60.00% higher than the customized ICE (0.55 kgCO₂e/kg) and 66.04% higher than the customized IPCC-EFDB (0.53 kgCO₂e/kg). In the construction stage, the extensive use of cement concrete mixing stations in the road surface, cast-in-place concrete, and reinforced concrete led to the customized EU-EFDB having the highest carbon emission factor (63.96 kgCO₂e/h), which was 11.20% higher than the customized ICE (57.51 kgCO₂e/h) and 15.99% higher than the customized IPCC-EFDB (55.14 kgCO₂e/h). In the use stage, the higher electricity consumption of the project facilities along the route caused the customized EU-EFDB to have the highest carbon accounting value. In the end-of-life stage, the project primarily used road transportation for waste disposal, and the carbon emission factor for this phase was highest in the customized EU-EFDB, at 1.12×10-4 kgCO₂e/(kg·km), which was higher than the customized ICE (1.10×10-4 kgCO₂e/(kg·km)) and the customized IPCC-EFDB (1.09×10-4 kgCO₂e/(kg·km)).
Hangzhou-Shaoxing-Ningbo Expressway (IPCC-EFDB > EU-EFDB > ICE)
In the production stage, steel accounted for 18.80% of carbon emissions, and the carbon emission factor for steel in the customized IPCC-EFDB (2.67 kgCO₂e/kg) was 8.54% higher than the customized EU-EFDB (2.46 kgCO₂e/kg) and 25.94% higher than the customized ICE (2.12 kgCO₂e/kg). In the construction stage, the heavy use of double steel wheel vibratory rollers for subgrade soil and excavation works led to a carbon emission factor of 76.46 kgCO₂e/h in the customized IPCC-EFDB, which was 11.22% higher than the customized EU-EFDB (68.75 kgCO₂e/h) and 15.82% higher than the customized ICE (66.02 kgCO₂e/h). In the operational stage, the high replacement of steel resulted in the highest carbon accounting value in the customized IPCC-EFDB. In the end-of-life stage, since waste was mainly reused on-site, the customized IPCC-EFDB had the highest carbon emission factor at 5.0×10-3 kgCO₂e/kg, which was higher than the customized EU-EFDB (4.5×10-3 kgCO₂e/kg) and the customized ICE (4.3×10-3 kgCO₂e/kg).
National Highway G25 (ICE > IPCC-EFDB > EU-EFDB)
In the production stage, the use of materials like rock wool boards for tunnel construction led to a higher carbon emission factor in the customized ICE (1.99 kgCO₂e/kg) compared to the customized IPCC-EFDB (1.54 kgCO₂e/kg), a difference of 29.22%, and compared to the customized EU-EFDB (1.49 kgCO₂e/kg), a difference of 33.56%. In the construction stage, electrical equipment such as axial flow fans led to higher carbon emissions, and the customized ICE showed the highest carbon emission factor at 1.37 kgCO₂e/h, which was 29.47% higher than the customized IPCC-EFDB (1.06 kgCO₂e/h) and 34.90% higher than the customized EU-EFDB (1.01 kgCO₂e/h). In the use stage, the project’s high water consumption caused the carbon emission factor to be highest in the customized ICE (1.41 kgCO₂e/m³), which was 16.53% higher than the customized IPCC-EFDB (1.21 kgCO₂e/m³) and 38.24% higher than the customized EU-EFDB (1.02 kgCO₂e/m³). In the end-of-life stage, the project primarily used landfill disposal for waste, and the customized ICE had the highest carbon emission factor at 0.012 kgCO₂e/kg, which was 9.09% higher than the customized IPCC-EFDB (0.011 kgCO₂e/m³) and 33.33% higher than the customized EU-EFDB (0.009 kgCO₂e/m³).
5.3. Discussions
When conducting life-cycle assessment (LCA) carbon accounting for construction projects using three different databases, the following two comments may be considered to help ensure the effective and rational use of the databases,
1. Weighed average of carbon emission databases
By integrating the characteristics of each database, a weighted method of 1:1:1 can be employed for carbon accounting, giving equal weight to the three databases. For example, when calculating the weighted carbon accounting value for a specific stage, if the carbon accounting value from the customized
ICE is denoted as A, the value from the customized
EU-EFDB is B, and the value from the customized
IPCC-EFDB is C, the final weighted carbon accounting value for this stage is calculated as (A×1 + B×1 + C×1) ÷ (1 + 1 + 1) = (A + B + C) ÷ 3. Using this method, the carbon emissions for the product stage of National Highway 320 would be 3.25×10
4 kgCO2e. This equal-weighted integration approach combines the advantages of each database, minimizing the limitations of relying on a single database.
Table 9 presents the carbon emission accounting results after applying the 1:1:1 weighting of the three databases to the three different projects.
2. Focus on the progress of carbon monitoring technologies and industry standards in construction
Currently, carbon monitoring technologies are still under development, and the construction industry has yet to establish unified, mature carbon emission monitoring standards. As a result, the accuracy of carbon accounting continues to face significant uncertainty. However, with gradual technological advancements, the precision of carbon accounting methods is expected to improve substantially in the future. Emerging technologies, such as a novel blockchain-based carbon auditing tool designed to support the life-cycle assessment of photovoltaic systems [
44], are gradually being adopted within the construction sector. The maturation and widespread implementation of these technologies will significantly enhance the timeliness and accuracy of carbon emission data. Concurrently, as industry standards within construction continue to be established and refined, the regulatory framework and consistency of carbon accounting will steadily improve [
45]. Therefore, the future accuracy of carbon accounting will rely heavily on these technological innovations and the advancement of construction industry standards.
6. Final Remarks
This study establishes a comprehensive framework of carbon emission accounting for real-world construction projects, covering method development, database customization, and the implementation of web-based accounting software. Validation across three infrastructure construction projects—National Highway 320, Hangzhou-Shaoxing-Ningbo Expressway, and National Highway G25—has led to several key findings and recommendations, while also identifying challenges that may be pertinent to carbon accounting in the context of China’s construction industry.
The developed web-based platform, grounded in life-cycle assessment (LCA) principles, has demonstrated practical feasibility through its application in various construction projects. These case calculations have validated the platform’s ability to perform complex carbon accounting tasks for construction projects, especially in the construction stage, where the software can directly import the bill of quantities data to calculate carbon emissions based on construction cost quotas. However, the validation of calculation precision may rely on future advancements in carbon monitoring technologies.
A cross-project analysis revealed consistent emission patterns, with the proportion of emissions across stages following a ratio of approximately 45:30:18:7:3 (production: construction: use: end-of-life: supplementary). The results show that the production stage consistently dominates the emissions profile, contributing between 45.3% and 45.6% of the total emissions, with the top three materials responsible for over 79.1% of the emissions. Additionally, a high concentration of emissions is found in the construction stage, with the top five sub-projects accounting for 67.47% of emissions. Notably, the selection of the database significantly influences the emission results, with a variance of 14% to 33% in stage-specific emissions, emphasizing the need for context-sensitive database selection.
Differences observed between the customized ICE, EU-EFDB, and IPCC-EFDB primarily come from the interaction between the projects and the databases. The EU-EFDB excels in locally material-intensive projects such as National Highway 320, where cement contributes 51.4% of emissions. The IPCC-EFDB provides high precision for steel-reliant designs, as seen in the Hangzhou-Shaoxing-Ningbo Expressway, where steel accounts for 18.8% of emissions. The ICE is more suited for specialized constructions like the National Highway G25, where tunnel emissions account for 47.52%. To mitigate database biases, a weighted composite method has been proposed, which can be useful in reducing individual database biases.
The possible challenges identified for further applications in construction industry are, (1) the customization of carbon accounting methods to better reflect China’s regional construction practices, (2) the need for strengthened updates to carbon emission factors to reflect technology progresses, and (3) the enhancement of database compatibility to domestic software platforms. This research framework provides a practical methodological approach while emphasizing the need for standardized protocols and ongoing improvements in the databases.
In conclusion, this research aims to contribute to the development of carbon accounting methods and tools, with the hope of providing more insights for carbon reduction in the China’s construction industry. The findings and the proposed framework are also expected to serve as a valuable reference for future studies and practical applications in carbon management and decarbonization efforts in other sectors.
Figure 1.
Summary and organization of the current work.
Figure 1.
Summary and organization of the current work.
Figure 2.
System boundaries for carbon emission in construction projects.
Figure 2.
System boundaries for carbon emission in construction projects.
Figure 3.
Integration of construction cost quota data and bill of quantities for calculating construction-stage carbon emission.
Figure 3.
Integration of construction cost quota data and bill of quantities for calculating construction-stage carbon emission.
Figure 4.
Hierarchical calculation of carbon emission in the construction stage, exemplified by the National Highway 320 project.
Figure 4.
Hierarchical calculation of carbon emission in the construction stage, exemplified by the National Highway 320 project.
Figure 5.
Workflow for compiling the customized carbon emission factor databases for specific construction projects.
Figure 5.
Workflow for compiling the customized carbon emission factor databases for specific construction projects.
Figure 6.
Enhanced E-R diagram of the customized carbon emission factor databases.
Figure 6.
Enhanced E-R diagram of the customized carbon emission factor databases.
Figure 7.
Design framework for the web-based carbon emission accounting tool.
Figure 7.
Design framework for the web-based carbon emission accounting tool.
Figure 8.
Graphical User Interface for the carbon emission accounting tool.
Figure 8.
Graphical User Interface for the carbon emission accounting tool.
Figure 9.
Front-end/Back-end workflow chart for the carbon emission accounting tool.
Figure 9.
Front-end/Back-end workflow chart for the carbon emission accounting tool.
Figure 13.
Life-cycle emission analysis using the customized ICE: (a, c, e) Bar charts representing the total emissions for NH320/HSY/NHG25 project, respectively; (b, d, f) Pie charts representing the relative contribution of carbon emission for each carbon emission stage, respectively.
Figure 13.
Life-cycle emission analysis using the customized ICE: (a, c, e) Bar charts representing the total emissions for NH320/HSY/NHG25 project, respectively; (b, d, f) Pie charts representing the relative contribution of carbon emission for each carbon emission stage, respectively.
Figure 14.
Production stage carbon emission analysis using ICE: (a,b) NH320 material breakdown & percentage, (c,d) HSY material breakdown & percentage, (e,f) NHG25 material breakdown & percentage.
Figure 14.
Production stage carbon emission analysis using ICE: (a,b) NH320 material breakdown & percentage, (c,d) HSY material breakdown & percentage, (e,f) NHG25 material breakdown & percentage.
Figure 15.
Construction stage sub-projects analysis with ICE: (a,c,e) Pareto charts: Top 8 emission sources(b,d,f) Radar charts: emission intensity vs. total emissions.
Figure 15.
Construction stage sub-projects analysis with ICE: (a,c,e) Pareto charts: Top 8 emission sources(b,d,f) Radar charts: emission intensity vs. total emissions.
Figure 10.
Geographic location map and construction sites: (a) National Highway 320 (NH320), (b) Hangzhou-Shaoxing-Ningbo Expressway (HSY Expressway), (c) National Highway G25 (NHG25).
Figure 10.
Geographic location map and construction sites: (a) National Highway 320 (NH320), (b) Hangzhou-Shaoxing-Ningbo Expressway (HSY Expressway), (c) National Highway G25 (NHG25).
Figure 11.
Construction stage data interface for National Highway G25 with the customized ICE.
Figure 11.
Construction stage data interface for National Highway G25 with the customized ICE.
Figure 12.
User interface showing the total carbon accounting results for National Highway G25, including itemized carbon emission amount, bar chart and pie chart for different stages.
Figure 12.
User interface showing the total carbon accounting results for National Highway G25, including itemized carbon emission amount, bar chart and pie chart for different stages.
Figure 16.
Life-cycle emission analysis using customized EU-EFDB: (a,c,e) Bar charts: total emissions for NH320, HSY, and NHG25 (b,d,f) Pie charts: stage contributions (excluding supplementary stage).
Figure 16.
Life-cycle emission analysis using customized EU-EFDB: (a,c,e) Bar charts: total emissions for NH320, HSY, and NHG25 (b,d,f) Pie charts: stage contributions (excluding supplementary stage).
Figure 17.
Production stage material analysis using customized EU-EFDB : (a, b) Material breakdown and percentages for NH320 (c, d) Material breakdown and percentages for HSY (e, f) Material breakdown and percentages for NHG25.
Figure 17.
Production stage material analysis using customized EU-EFDB : (a, b) Material breakdown and percentages for NH320 (c, d) Material breakdown and percentages for HSY (e, f) Material breakdown and percentages for NHG25.
Figure 18.
Construction stage sub-projects analysis using revided EU-EFDB: (a, c, e) Pareto charts of Top 8 emission sources (b, d, f) Radar charts of emission intensity vs. total emissions.
Figure 18.
Construction stage sub-projects analysis using revided EU-EFDB: (a, c, e) Pareto charts of Top 8 emission sources (b, d, f) Radar charts of emission intensity vs. total emissions.
Figure 19.
Life-cycle emission analysis using the customized IPCC-EFDB: (a,c,e) Bar charts: total emissions for NH320, HSY, and NHG25 (b,d,f) Pie charts: stage contributions (excluding supplementary stage).
Figure 19.
Life-cycle emission analysis using the customized IPCC-EFDB: (a,c,e) Bar charts: total emissions for NH320, HSY, and NHG25 (b,d,f) Pie charts: stage contributions (excluding supplementary stage).
Figure 20.
Production stage material analysis using customized IPCC-EFDB: (a, b) Material breakdown and percentages for NH320 (c, d) Material breakdown and percentages for HSY (e, f) Material breakdown and percentages for NHG25.
Figure 20.
Production stage material analysis using customized IPCC-EFDB: (a, b) Material breakdown and percentages for NH320 (c, d) Material breakdown and percentages for HSY (e, f) Material breakdown and percentages for NHG25.
Figure 21.
Construction stage sub-projects analysis using customized IPCC-EFDB: (a, c, e) Pareto charts of top 8 emission sources (b, d, f) Radar charts of carbon emission intensity vs. total emissions.
Figure 21.
Construction stage sub-projects analysis using customized IPCC-EFDB: (a, c, e) Pareto charts of top 8 emission sources (b, d, f) Radar charts of carbon emission intensity vs. total emissions.
Table 1.
Comparison of carbon accounting software.
Table 1.
Comparison of carbon accounting software.
| Software Name |
Country |
Functionalities |
References |
| SimaPro |
Netherlands |
Facilitate multi-impact category carbon assessments. Support detailed life-cycle analysis for environmental decision-making. |
Starostka-Patyk et al. [24] |
| Umberto |
Germany |
Focuse on comprehensive product system life-cycle evaluations. Identify sustainability improvements for optimized system performance. |
Orr et al. [25] |
| Gabi |
Germany |
1. LCA calculations with granular process breakdown. 2. Comprehensive database with efficient data retrieval. |
Tam et al. [27] |
| Carbon e-Management |
China |
1. Cloud-based SaaS model with low implementation cost. 2. One-stop solution for Small and Medium Enterprises (SME) carbon management. |
Tang et al. [26] |
Table 2.
Life-cycle stages in the proposed model.
Table 2.
Life-cycle stages in the proposed model.
| No. |
Stages |
Content |
Category |
| 1 |
Production |
Carbon emissions during material extraction, processing, and manufacturing of construction components |
Traditional Life-cycle Stages |
| 2 |
Construction |
Carbon emissions during the transportation of construction materials to the site, the installation of components, and the use of machinery |
| 3 |
Use |
Carbon emissions generated through building usage, maintenance, repair, renovation, and operational electricity/water consumption |
| 4 |
End-of-life |
Carbon emissions from building demolition, deconstruction, waste material transportation, and waste disposal |
| 5 |
Supplementary |
Carbon benefits from material recycling (e.g., scrap steel substitution), reuse, and biogenic carbon sequestration through greening initiatives |
Additional Life-cycle Stage |
Table 3.
Carbon emission types across life-cycle stages.
Table 3.
Carbon emission types across life-cycle stages.
| No. |
Emission Type |
Production Stage |
Construction Stage |
Use Stage |
End-of-life Stage |
Supplementary Stage |
| 1 |
Material Production |
✓ |
|
|
|
|
| 2 |
Transportation |
✓ |
✓ |
|
✓ |
|
| 3 |
Construction Installation |
|
✓ |
|
|
|
| 4 |
Machinery Equipment |
|
✓ |
|
|
|
| 5 |
Material Replacement |
|
|
✓ |
|
|
| 6 |
Structural Demolition |
|
|
|
✓ |
|
| 7 |
Waste Management |
|
|
|
✓ |
|
| 8 |
Operational Energy Use |
|
|
✓ |
|
|
| 9 |
Reuse Sequestration |
|
|
|
|
✓ |
| 10 |
Biogenic Carbon Sequestration |
|
|
|
|
✓ |
| 11 |
Afforestation Sequestration |
|
|
|
|
✓ |
Table 4.
Introduction to original and customized ICE, EU-EFDB, and IPCC-EFDB.
Table 4.
Introduction to original and customized ICE, EU-EFDB, and IPCC-EFDB.
| Database |
Country/Region |
Content |
Features |
Modification Methods |
Customized CEF Entries |
| ICE |
UK |
Building materials Construction processes Transportation Waste management Building energy consumption |
Specialized in construction sector, rich historical data, authoritative sources. Limited coverage outside construction, slow update cycle. |
1. Unit conversion using Standard for Building Carbon Emission Calculation(GB/T 51366-2019) [31] and Guidelines for Corporate Greenhouse Gas Emission Accounting and Reporting (2013) [38] 2. Enhanced construction-stage calculation methods using Standard for Quantity Calculation of Housing Construction and Decoration Projects (GB/T 50854-2024) [29] and Quotations for Highway Engineering Budgeting (JTG/T 3832-2018) [30]. 3. Supplementary stage factors added from carbon reduction studies |
1,574 |
| EU-EFDB |
Europe |
Building materials Transportation Agriculture Waste management Building energy consumption |
Pollutant data integration, real-time updates, broad sector coverage. Limited data in industrial production and land-use changes. |
Same |
1,605 |
| IPCC-EFDB |
Global |
Building materials Transportation Industrial production Land-use changes Waste management Building energy consumption |
Global policy benchmarks, standardized methodologies, widely recognized references. Infrequent updates, may lack recent trends (e.g., building energy consumption). |
Same |
1,548 |
Table 5.
Some typical CEFs for customized ICE,EU-EFDB, and IPCC-EFDB.
Table 5.
Some typical CEFs for customized ICE,EU-EFDB, and IPCC-EFDB.
| LCA Stage |
Category |
Type/ Item |
Specification/Region |
Customized ICE
|
Customized EU-EFDB
|
Customized IPCC-EFDB |
| Production Stage |
Raw Material Supply |
Cement (32.5 grade) kgCO₂e/kg |
- |
0.55 |
0.88 |
0.53 |
| Steel (section steel)/kgCO₂e/kg |
- |
2.12 |
2.46 |
2.67 |
Rock Wool Board kgCO₂e/kg |
120-160 kg/m³ |
1.99 |
1.49 |
1.54 |
Construction Stage (Manual Input) |
Freight Transport |
Road Transport kgCO₂e/(kg·km) |
Fully Loaded |
1.10×10⁻⁴ |
1.12×10⁻⁴ |
1.09×10⁻⁴ |
| Construction Installation |
Concrete Mixing Plant/kgCO₂e/h |
≤60 m³/h |
57.51 |
63.96 |
55.14 |
| Double Drum Vibratory Roller/kgCO₂e/h |
≤15 t |
66.02 |
68.75 |
76.46 |
| |
Axial Flow Fan kgCO₂e/h |
≤100 kW |
1.37 |
1.01 |
1.06 |
| Construction Stage (Quota-based) |
Subgrade Works |
Rockwork kgCO₂e/quota |
Code 1-1-1 |
71.660 |
75.13 |
69.12 |
| Code 1-1-2 |
41.775 |
45.11 |
46.23 |
| Code 1-1-3 |
74.145 |
68.12 |
77.91 |
| Use Stage |
Replacement |
Cement (grade 32.5) kgCOe/kg |
- |
0.55 |
0.88 |
0.53 |
| Electricity Consumption |
North China Region kgCO₂e/kWh |
Beijing, Tianjin, Hebei |
0.884 |
0.901 |
0.841 |
Northeast Region kgCO₂e/kWh |
Liaoning, Jilin, Heilongjiang |
0.777 |
0.801 |
0.745 |
East China Region kgCO₂e/kWh |
Shanghai, Jiangsu, Zhejiang |
0.704 |
0.791 |
0.688 |
| Water Consumption |
Water (Tap Water) kgCOe/t |
- |
0.168 |
0.168 |
0.168 |
| End-of-life Stage |
De-construction |
Wall (Inner Surface Area) kgCO₂e/m² |
- |
3.40 |
3.47 |
3.45 |
| Transport to waste processing or disposal |
Site Common Transport Vehicles kgCO₂e/(kg·km) |
Distant Transport |
1.10 × 10⁻⁴ |
1.12 × 10⁻⁴ |
1.09 × 10⁻⁴ |
| Disposal of waste |
On-site Reuse kgCO₂e/kg |
Local Reuse |
4.3 × 10⁻³ |
4.5 × 10⁻³ |
5.0 × 10⁻³ |
| Landfill |
0.012 |
0.009 |
0.011 |
| Supplementary Stage |
Reuse |
Concrete (Cast-in-place) kgCO₂e/m³ |
- |
-1.23 × 10⁻³ |
-1.23 |
-1.23 |
| Biocarbon |
Timber kgCO₂e/kg |
National |
-0.166 |
-0.66 |
-0.66 |
| Greening for carbon sequestration |
Camphor Tree kgCO₂e/(m²·year) |
-0.978 |
-0.978 |
-0.978 |
Chinese Fir kgCO₂e/(m²·year) |
-0.811 |
-0.811 |
-0.811 |
Table 6.
Project profiles and key specifications.
Table 6.
Project profiles and key specifications.
| Project Title |
National Highway 320 |
Hangzhou-Shaoxing-Ningbo Expressway |
National Highway G25 |
| Contractor |
Zhejiang Communications Construction Group Co., Ltd. |
| Site Location |
Yuhang Huawu to Fuyang Gaoqiao |
Hangzhou to Ningbo |
Lin’an District to Yuhang District |
| Chainage Limits |
K9+600 to K18+273.141 |
K0+000 to K4+560.3 |
K74+40 to K83+000~K60+000 to K83+000 |
| Length |
8.673 km |
4.560 km |
35.418 km |
| Project Type |
Road & Bridge & Tunnel |
| Project Overview |
The 8.673-km Yuhang Huawu-Fuyang Gaoqiao section of National Highway 320 features a dual six-lane, first-class highway standard, incorporating surface roads and multiple bridges. This typical first-class highway project serves as a reference for carbon accounting in similar engineering contexts. |
Located along the southern coast of Hangzhou Bay, the Hangzhou-Shaoxing-Ningbo Expressway (parallel to route G92N of regional ring highway G92) is a key infrastructure project in the Yangtze River Delta metropolitan cluster. Connecting Hangzhou, Shaoxing, and Ningbo, it enhances regional connectivity and supports socioeconomic development. |
The 62.715-km expansion of the Changchun-Shenzhen Expressway (G25) in Hangzhou involves complex engineering components, including subgrades, bridges, tunnels, interchanges, and extra-large bridges. This project provides rigorous validation scenarios for carbon accounting software in processing large-scale engineering data. |
Table 7.
Some key real-world sengineering data related with carbon emission.
Table 7.
Some key real-world sengineering data related with carbon emission.
| Stage |
Metric |
National Highway 320 |
Hangzhou-Shaoxing-Ningbo Expressway |
National Highway G25 |
| Production |
Material types involved |
49 types |
101 types |
117 types |
| Most consumed material & quantity |
32.5 Cement (5,398.42 t) |
32.5 Cement (24,589.23 t) |
C25 Cast-in-place Concrete (26,578.12 m³) |
| Construction |
Sub-project |
9 |
153 |
285 |
| Item project |
11 |
216 |
314 |
| Use |
Most frequent replacement material & quantity |
Petroleum Asphalt (16.78 kg) |
Rubble (89.11 m³) |
Gravel (97.46 m³) |
| Electricity consumption |
1.99×10⁷ kWh |
1.09×10¹¹ kWh |
4.84×10¹¹ kWh |
| Water consumption |
4.67×10⁶ m³ |
9.79×10⁷ m³ |
8.97×10⁸ m³ |
| End-of-life |
Predominant waste transport & distance |
Road Transport (87 km) |
Road Transport (169 km) |
Rail Transport (187 km) |
| Supplementary |
Primary carbon-sequestration plants & spacing |
Camphor Tree (3-5 m) |
London Planetree (2-4 m) |
Huanshan Katsura Tree (5-6 m) |
Table 8.
Life-cycle carbon emissions estimated using three databases.
Table 8.
Life-cycle carbon emissions estimated using three databases.
| Project |
Customized ICE (kgCO₂e) |
Customized EU-EFDB (kgCO₂e) |
Customized IPCC-EFDB (kgCO₂e) |
| National Highway 320 |
4.25×10⁴ |
1.29×10⁵ |
3.50×10⁴ |
| Hangzhou-Shaoxing-Ningbo Expressway |
2.13×10⁸ |
5.99×10⁸ |
6.54×10⁸ |
| National Highway G25 |
8.39×10⁹ |
3.29×10⁹ |
3.35×10⁹ |
Table 9.
Carbon emissions values for different construction projects using 1:1:1 weighting of the three databases.
Table 9.
Carbon emissions values for different construction projects using 1:1:1 weighting of the three databases.
| Project Name |
Weighted Carbon Emission Value (kgCO₂e) |
| National Highway 320 |
6.88×104 |
| Hangzhou-Shaoxing-Ningbo Expressway |
2.71×108 |
| National Highway G25 |
5.01×109 |