Abstract
Keywords:
1. Introduction
2. Literature Review
3. Research Objectives
- To examine the extent to which Quantity Surveyors are involved in Alternative Dispute Resolution (ADR) processes within Sri Lankan green building construction projects.
- To identify the roles and human skills required for Quantity Surveyors in effective dispute resolution in Sri Lankan green building construction projects.
- To evaluate the degree to which construction companies have adopted ADR methods In Sri Lankan green building construction projects.
- To assess the impact of Quantity Surveyors’ involvement in ADR on the organizational performance of construction companies in Sri Lankan green building construction.
4. Methodology
5. The Analyiss of Data
| CONSTRUCTION PARTY | PROFESSION | QTY |
| Client | Senior Quantity Surveyors | 10 |
| Quantity Surveyors | 5 | |
| Assistant Quantity Surveyors | 5 | |
| Contractor | Senior Quantity Surveyors | 10 |
| Quantity Surveyors | 5 | |
| Assistant Quantity Surveyors | 5 | |
| 40 |
6. Reliability Test
| Reliability Statistics | ||
| Cronbach's Alpha | Cronbach's Alpha Based on Standardized Items | N of Items |
| .718 | .723 | 14 |
7. Characteristic Analysis
| Gender | Total | |||
| Male | Female | |||
| Amount of D occurrence | Rare | 0 | 9 | 9 |
| Occasionally | 17 | 3 | 20 | |
| Always | 11 | 0 | 11 | |
| Total | 28 | 12 | 40 | |
| Value | df | Asymptotic Significance (2-sided) | |
| Pearson Chi-Square | 27.857a | 2 | <.001 |
| Likelihood Ratio | 31.961 | 2 | <.001 |
| Linear-by-Linear Association | 21.502 | 1 | <.001 |
| N of Valid Cases | 40 | ||
| a. 2 cells (33.3%) have expected count less than 5. The minimum expected count is 2.70. | |||


| Total | ||||
| less than 5 years | 5 years and 5+ years | |||
| Amount of D occurrence |
Rare | 9 | 0 | 9 |
| Occasionally | 8 | 12 | 20 | |
| Always | 2 | 9 | 11 | |
| Total | 19 | 21 | 40 | |
| Value | df | Asymptotic Significance (2-sided) | |
| Pearson Chi-Square | 14.190a | 2 | <.001 |
| Likelihood Ratio | 18.000 | 2 | <.001 |
| Linear-by-Linear Association | 12.417 | 1 | <.001 |
| N of Valid Cases | 40 | ||
| a. 2 cells (33.3%) have expected count less than 5. The minimum expected count is 4.27. | |||
7.1. Objective 1: The Involvement of Quantity Surveyors in Alternative Dispute Resolution (ADR) Processes Within Sri Lankan Green Building Construction Projects
| Frequency | Percent | Valid Percent | Cumulative Percent | ||
| Valid | Rare | 9 | 22.5 | 22.5 | 22.5 |
| Occasionally | 20 | 50.0 | 50.0 | 72.5 | |
| Always | 11 | 27.5 | 27.5 | 100.0 | |
| Total | 40 | 100.0 | 100.0 | ||
| Frequency | Percent | Valid Percent | Cumulative Percent | ||
| Valid | Never | 1 | 2.5 | 2.5 | 2.5 |
| Rare | 9 | 22.5 | 22.5 | 25.0 | |
| Occasionally | 23 | 57.5 | 57.5 | 82.5 | |
| Always | 7 | 17.5 | 17.5 | 100.0 | |
| Total | 40 | 100.0 | 100.0 | ||

7.2. Objective 2: The Roles and Human Skills Required of Quantity Surveyors for Effective Dispute Resolution in Sri Lankan Green Building Construction

7.3. Objective 3: The Extent to Which Construction Companies Have Adopted ADR Methods In Sri Lankan Green Building Construction Projects
| Factor | SD % |
D % |
N % |
A % |
SA % |
Mean | Mode | SD | Skew -ness |
| The degree of which Standard Bidding Documents (SBD) governs and follows adjudication and arbitration for dispute resolution. | 0 | 2.5 | 20 | 62.5 | 15 | 3.90 | 4.00 | 0.67 | -41 |
| Recruitment of professionals such as Negotiators/ Mediators/ Conciliators in dispute resolution. | 0 | 7.5 | 20 | 57 | 15 | 3.80 | 4.00 | 0.79 | -.60 |
| Dispute resolution via negotiation, mediation, and conciliation during the last 5 years. | 2.5 | 2.5 | 32.5 | 45 | 17.5 | 3.70 | 4.00 | 0.87 | -.62 |
| The degree of which negotiation, mediation, and conciliation were prioritized rather than arbitration and adjudication. | 0 | 2.5 | 15 | 65 | 17.5 | 3.97 | 4.00 | 0.66 | -.53 |
7.4. Objective 4: The Impact of Quantity Surveyors’ Involvement in ADR On the Organizational Performance of Construction Companies in Sri Lankan Green Building Construction
| Factor | SD % |
D % |
N % |
A % |
SA % |
Mean | Mode | SD | Skew -ness |
| The QSs contribution in project delivery (including time, cost and quality management). | 0 | 0 | 17.5 | 52.5 | 30 | 4.12 | 4.00 | 0.68 | -.16 |
| The QSs contribution in the coordination of business relationships. | 0 | 5 | 20 | 60 | 15 | 3.85 | 4.00 | 0.74 | -.56 |
| ANOVAa | ||||||
| Model | Sum of Squares | df | Mean Square | F | Sig. | |
| 1 | Regression | 3.317 | 1 | 3.317 | 30.229 | .000b |
| Residual | 4.169 | 38 | .110 | |||
| Total | 7.486 | 39 | ||||
| Coefficientsa | ||||||
| Model | Unstandardized Coefficients | Standardized Coefficients | t | Sig. | ||
| B | Std. Error | Beta | ||||
| 1 | (Constant) | 1.617 | .444 | 3.639 | .001 | |
| Alternative Dispute Resolution methods | .630 | .115 | .666 | 5.498 | .000 | |
8. Conclusions
9. Limitations and Further Study Directions
References
- Abenayake, M. and Weddikara, C., 2013. Special features and experiences of the full-term dispute adjudication board as an alternative dispute resolution method in the construction industry of Sri Lanka. Sri Lanka: University of Moratuwa.
- Adnan, H., Shamsuddin, S.M., Supardi, A. and Ahmad, N., 2012. Conflict prevention in partnering projects. Procedia-Social and Behavioral Sciences, 35, pp.772-781.
- Agapiou, A. and Chen, Z (2017), September. Collaborative business relationships: a means to an end of construction disputes or fuel for the fire?. In International Research Conference 2017: Shaping Tomorrow's Built Environment-Conference Proceedings (pp. 707-718).
- Agresti, A., 2013. Categorical data analysis. John Wiley & Sons.
- Ahn, C., Lee, S. H., Pena-Mora, F., & Abourizk, S. (2013). Consideration of the Environmental Cost in Construction Contracting for Public Works: A+C and A+B+C Bidding Methods. Journal of Management in Engineering, 29(1), 34–41.
- Altobelli, T. (2004). The Cost Benefits of Alternative Dispute Resolution Revisited. IAMA 2004 National Conference, New Directions In ADR, Sydney, 22 May 2004.
- Amaratunga, D., Baldry, D., Sarshar, M. and Newton, R., 2002. Quantitative and qualitative research in the built environment: application of “mixed” research approach. Work study, 51(1), pp.17-31.
- Ayarkwa, J., Opoku, D.G.J., Antwi-Afari, P. and Li, R.Y.M., 2022. Sustainable building processes’ challenges and strategies: The relative important index approach. Cleaner Engineering and Technology, 7, p.100455.
- Bishop, P.A. and Herron, R.L., 2015. Use and misuse of the Likert item responses and other ordinal measures. International journal of exercise science, 8(3), p.297.
- Cakmak, P. & Cakmak, E., 2013. An analysis of causes of disputes in the construction industry using analytical hierarchy process. ASCE 2013 , pp. 93-103.
- Chen, C.K. and John Jr, H., 2004. Using Ordinal Regression Model to Analyze Student Satisfaction Questionnaires. IR Applications, Volume 1, May 26, 2004. Association for Institutional Research (NJ1).
- Cochran, W.G., 1954. Some methods for strengthening the common χ 2 tests. Biometrics, 10(4), pp.417-451.
- Edirisinghe, V., Marsh, D., Borthwick, F. and Cotgrave, A., 2020. An Investigation into the Significant Causes of Disputes in the Sri Lankan Construction Industry. EPiC Series in Built Environment, 1, pp.347-355.
- Edirisinghe, V.R.D., 2023. Framework for improved alternatives dispute resolution practice in the Sri Lankan constructions industry (Doctoral dissertation, Liverpool John Moores University (United Kingdom)).
- Ekanayaka, E.M.P.K. and Bandara, G.P.M.C.M., 2021. Study of Quantity Surveying Roles and Skills Requirement under Green Building Development in Sri Lanka.
- Gamage, A. N. K. K., & Kumar, S. (2024). Review of Alternative Dispute Resolution Methods in Construction. Saudi Journal of Engineering and Technology, 9(2), 75–87.
- Global Alliance for Buildings and Construction (GlobalABC), 2022. Sri Lanka Sustainable Housing and Construction Roadmap 2020–2050. [online] Available at: https://globalabc.org/sites/default/files/2022-11/Sri%20Lanka%20Sustainable%20Housing%20and%20Construction%20Roadmap%202020%20%E2%80%93%202050.pdf.
- Harpe, S.E., 2015. How to analyze Likert and other rating scale data. Currents in pharmacy teaching and learning, 7(6), pp.836-850.
- Hasanzadeh, S., Esmaeili, B., Nasrollahi, S., Gad, G.M. and Gransberg, D.D., 2018. Impact of owners’ early decisions on project performance and dispute occurrence in public highway projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10(2), p.04518004.
- Hietanen-Kunwald, P. and Haapio, H., 2021. Effective dispute prevention and resolution through proactive contract design. Journal of Strategic Contracting and Negotiation, 5(1-2), pp.3-23.
- Janda, L.A. and Endresen, A., 2017. Five statistical models for Likert-type experimental data on acceptability judgments. Journal of Research Design and Statistics in Linguistics and Communication Science, 3(2), pp.217-250.
- Jayasena, H.S. and Kavinda, Y.H., 2012. Most appropriate dispute resolution strategy for Sri Lankan construction industry. In Proc., World Construction Conf. on (pp. 180-187).
- Jayasinghe, H. & Ramachandra, T., 2016. Adjudication Practice and Its Enforceability in the Sri Lankan Construction Industry. J. Leg. Aff. Dispute Resolut. Eng. Construction, 8(1), pp. 20-28.
- Julious, S.A., 2005. Sample size of 12 per group rule of thumb for a pilot study. Pharmaceutical Statistics, 4(4), pp.287–291. [CrossRef]
- Ofori, G., 2018. Construction in Developing Countries: Need for New Concepts. Journal of Construction in Developing Countries, 23(2), pp. 1-6.
- Perera, B.A.K.S., Ekanayake, B.J., Jayalath, C. and Jayathilaka, G.R.H. (2019). A study on variation-specific disputes that arise in road projects in Sri Lanka: a qualitative approach. International Journal of Construction Management, 21(6), pp.571-581.
- Rathnayake, G.C., Bandara, K.P.S.P.K. and Withanage, K.T., 2022, June. The role of quantity surveyors for the success of small-scale construction projects in Sri Lanka. In Proceedings The 10th World Construction Symposium| June (p. 922).
- Sahu, P. et al. (2024). Analyzing the Impact of Construction Delays on Disputes in India: A Statistical and Machine Learning Approach.
- Saunders, M., Lewis, P. and Thornhill, A., 2019. Research methods for business students. 8th ed. Harlow: Pearson Education Limited.
- Senaratne, S. & Udawatta, N., 2013. Managing intragroup conflicts in construction project teams: case studies in Sri Lanka. Architectural Engineering and Design Management, 9(3), pp. 158-175.
- Shayan, S., Kim, K.P., Ma, T., Freda, R. and Liu, Z., 2019. Emerging challenges and roles for quantity surveyors in the construction industry. Management Review: An International Journal, 14(1), pp.82-96.
- Simpeh, E. K., & Smallwood, J. J., 2015. Obstacles to Green Building Project Financing. In Proceedings of the 31st Annual ARCOM Conference (pp. 1107–1116).
- Thusharika, A.P.J.N. and Abeynayake, M., 2016. Framework for mitigating contractual disputes in the Sri Lankan construction industry. Proceedings of the Ceylon Institute of Builders, pp.1-10.
- Wijesinghe, D.K.G.G., 2021. Investigate the common factors to the conflicts in the construction industry Sri Lanka [Master’s thesis, University of Moratuwa]. University of Moratuwa Institutional Repository. http://dl.lib.uom.lk/handle/123/20079.

Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |