The Viability Analysis of Ubungo II Gas Power Plant Efficiency Improvement Using Co-Generation System in Tanzania

A peer-reviewed article of this preprint also exists.

Submitted:

06 August 2022

Posted:

08 August 2022

You are already at the latest version

Abstract
The power utility, Tanzania Electric Supply Company Limited (TANESCO) is faced with challenges of supplying adequate power to the ever-increasing demand. To this end, this paper explores the installed Ubungo Gas Power Plant (UGP II) located in Dar es Salaam to find means of utilizing it in co-generation method. The study embarked on detailed modelling of the system and run simulations which indicated that the co-generation can result to power generation efficiency increase between 10.42 to 50.92%. It is recommended to change the UGP II to exploit this co-generation method. Further, the study could be improved by including more parameters of the gas and steam plant and verify them experimentally.
Keywords: 
;  ;  ;  
Copyright: This open access article is published under a Creative Commons CC BY 4.0 license, which permit the free download, distribution, and reuse, provided that the author and preprint are cited in any reuse.
Prerpints.org logo

Preprints.org is a free preprint server supported by MDPI in Basel, Switzerland.

Subscribe

Disclaimer

Terms of Use

Privacy Policy

Privacy Settings

© 2025 MDPI (Basel, Switzerland) unless otherwise stated