Abstract
Keywords:
1. Introduction
2. Materials and Methods
2.1. Intraday Electricity Market
2.2. The Intraday Electricity Market and the Loss of a Significant Production Volume in the Power System
3. Results
Case study
- Calculation of the system imbalance and activation of Ancillary services took place in 60-minute granularity.
- Trading on the intraday electricity market (IDM) took place with 60-minute products, with the deadline for cross-border trading (ID GCT) being 60 minutes before the start of the delivery hour.
-
15 min_ID GCT 15 min
- Calculation of the system imbalance and activation of AnS would take place in 15-minute granularity,
- Trading on the intraday electricity market took place with 15-minute products, with the deadline for cross-border trading (ID GCT) being 15 minutes before the start of the delivery hour.
-
15 min_ID GCT 60 min
- Calculation of the system imbalance and activation of AnS would take place in 15-minute granularity,
- Trading on the intraday electricity market took place with 15-minute products, with the deadline for cross-border trading (ID GCT) being 60 minutes before the start of the delivery hour.
- This status is assumed to be active within the transmission system from 1 July 2024 [21].
-
15 min_ID GCT 30 min
- Calculation of the system imbalance and activation of AnS would take place in 15-minute granularity,
- Trading on the intraday electricity market took place with 15-minute products, with the deadline for cross-border trading (ID GCT) being 30 minutes before the start of the delivery hour.
- This status is expected to be active within the transmission system from 1.1.2026 at the latest [22].
15 min_ID GCT 15 min
- Calculation of system imbalance and activation of AnS would take place in 15-minute granularity,
- Trading on the intraday electricity market took place with 15-minute products, with the deadline for cross-border trading (ID GCT) being 15 minutes before the start of the delivery hour.
- The trading deadline for all contracts on IDM is 5 minutes before the delivery interval, however, the local market is not as liquid as the connected European market, moreover, if an outage occurs on the side of a major producer in the BZ, the liquidity will decrease even more.
15 min_ID GCT 60 min
- Calculation of system imbalance and activation of AnS would take place in 15-minute granularity,
- Trading on the intraday electricity market took place with 15-minute products, with the deadline for cross-border trading (ID GCT) being 60 minutes before the start of the delivery hour.
15 min_ID GCT 30 min
- Calculation of system imbalance and activation of AnS would take place in 15-minute granularity,
- Trading on the intraday electricity market took place with 15-minute products, with the deadline for cross-border trading (ID GCT) being 30 minutes before the start of the delivery hour.
4. Conclusions


Acknowledgments
Conflict of Interest
Use of AI tools declaration
References
- Scharff, R., & Amelin, M. (2016). Trading behaviour on the continuous intraday market Elbas. Energy Policy, 88, 544–557. [CrossRef]
- Zalzar, S., Bompard, E., Purvins, A., & Masera, M. (2020). The impacts of an integrated European adjustment market for electricity under high share of renewables. Energy Policy, 136, 111055. [CrossRef]
- Chemišinec I. et al.: Obchod s elektřinou, Conte, 2010 .
- Clò, S., & Fumagalli, E. (2019). The effect of price regulation on energy imbalances: A Difference in Differences design. Energy Economics, 81, 754–764. [CrossRef]
- Jackson. R, Onar. O, Kirkham. H, Fisher. E, Burkes. K, Starke. M, Mohammed. O, Weeks. G; Opportunities for Energy Efficiency Improvements in the U.S. Electricity Transmission and Distribution System , ORNL/TM-2015/5.
- https://www.ote-cr.cz/en/short-term-markets/electricity/day-ahead-market. (Accessed on 25 April 2024).
- Naval, N., & Yusta, J. M. (2021). Virtual power plant models and electricity markets - A review. Renewable and Sustainable Energy Reviews, 149, 111393. [CrossRef]
- T: autorů, 2016; 8. Kolektiv autorů: Trh s elektřinou, Asociace energetických manažerů, 2016.
- https://www.europex.org/press-releases/cep-eu-electricity-market-design-press-release.( Accessed on 2 May 2024).
- Glantz, M., & Kissell, R. (2014). Equity Derivatives. Multi-Asset Risk Modeling, 189–215. [CrossRef]
- Gasparella, A., Koolen, D. and Zucker, A., The Merit Order and Price-Setting Dynamics in European Electricity Markets, European Commission, Petten, 2023, JRC134300 .
- International Bank for Reconstruction and Development / The World Bank, Wholesale Electricity Market Design, Washington, DC., 2022.
- Balardy, C. Auction and Continuous Market for Power: Organization and Microstructure. Ph.D. Thesis, Université Paris-Dauphine, Paris, France, 2021.
- MCSC. MESC—Market Europe Stakeholder Committee. 2022. Available online: https://eepublicdownloads.azureedge.net/clean-documents/Network%20codes%20documents/MESC/2022%20MESC%20documents/220914_MESC_3.4_Update%20on%20MCSC.pdf (Accessed on 3 June 2024).
- CNMC; ERSE. Request for Amendments of the Spanish and Portuguese Regulatory Authorities on Common Spanish and Portuguese TSOs and NEMO Proposal for Complementary Intraday Regional Auctions in Accordance with Article 63 of Commission Regulation (EU) 2015/1222 of 24 July 2015 Establishing a Guideline on Capacity Allocation and Congestion Management. 2017. Available online: https://www.cnmc.es/sites/default/files/Request%20For%20Amendments.pdf (Accessed on 17 June 2024).
- https://www.epexspot.com/en/marketcoupling. (Accessed on 9 June 2024).
- https://www.iea.org/articles/czech-republic-electricity-security-policy. (Accessed on 18 June 2024).
- Stojanović, B.; Kostić, Z. Convergence of Economic Performance in the European Union. In Researching Economic Development and Entrepreneurship in Transitional Economies; Ateljević, J., Trivić, J., Eds.; KarlFranzens-Universität Graz: Graz, Austria, 2015; pp. 55–66.
- Alberizzi, Andrea & Grisi, Paolo & Zani, Alessandro. (2021). Analysis of the SIDC market on relationship between auctions and continuous trading. 1-5. [CrossRef]
- https://www.ote-cr.cz/cs/statistika/odchylky-elektrina?version=2&date=2024-04-29. (Accessed on 29 April 2024).
- relevant legislative requirements (Regulation of the European Parliament and of the Council (EU) 2019/943 and Decree No. 408/2015 Coll. on Electricity Market Rules).
- REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL amending Regulations (EU) 2019/943 and (EU) 2019/942 as well as Directives (EU) 2018/2001 and (EU) 2019/944 to improve the Union’s electricity market design(= ‘‘EMDR‘‘), 19 December 2023 .
- https://www.ceps.cz/cs/data#AktivaceSVRvCR (Accessed on 12 May 2024).
- Cross-zonal capacities and the 70% margin available for cross-zonal electricity trade (MACZT) 2023 Market Monitoring Report, ACER.







Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |