How to cite: Gronwald, F.; Chang, S. Using Optimization to Solve the Dilemma of a Municipal Solid Waste landfill in Delaware Running out of Capacity Faster than Predicted. Preprints 2018, 2018120270. https://doi.org/10.20944/preprints201812.0270.v1 Gronwald, F.; Chang, S. Using Optimization to Solve the Dilemma of a Municipal Solid Waste landfill in Delaware Running out of Capacity Faster than Predicted. Preprints 2018, 2018120270. https://doi.org/10.20944/preprints201812.0270.v1

Abstract

Municipal landfills play a vital role in disposing of the solid waste from a community. One of the biggest challenges landfill management face is when the available storage space is being reduced faster than the rate that was planned for. This shortening of the landfill lifecycle impacted the city of Wilmington, Delaware when it was found that their landfill had lost 11 years of its projected lifespan and would reach fully capacity within the next decade. In order to remedy the situation six alternative solutions were devised, with each having different costs (capital, operating, and transport) and varying lengths of landfill extension. This research used the principle of optimization via a LINDO program to determine which solution would achieve the longest landfill extension for the minimum total cost. Other constraints placed on the program include reducing the waste being sent to the landfill and to achieve a minimum of 25 additional years for the landfill. The calculated solution produced a cost reduction of $232.64 million dollars and 3.2 additional years of operation from the option that was eventually chosen by the landfill authority.

Keywords

optimization; LINDO; landfill; Delaware; recycling; municipal solid waste (MSW)

Subject

Engineering, Civil Engineering

Comments (0)

We encourage comments and feedback from a broad range of readers. See criteria for comments and our Diversity statement.

Leave a public comment
Send a private comment to the author(s)
* All users must log in before leaving a comment
Views 0
Downloads 0
Comments 0
Metrics 0


×
Alerts
Notify me about updates to this article or when a peer-reviewed version is published.
We use cookies on our website to ensure you get the best experience.
Read more about our cookies here.