Preprint
Article

This version is not peer-reviewed.

Battery and Charging Infrastructure Sizing Method Applied to the Norwegian Coastal Express

Submitted:

04 March 2026

Posted:

04 March 2026

You are already at the latest version

Abstract
We present a parametrised charging infrastructure model developed to support the design of a hybrid-electric zero-emission vessel with corresponding charging infrastructure for operation along the Norwegian Coastal Express route. The charging model includes functionalities to analyse the required battery storage capacity and power ratings and locations of charging facilities for achieving battery-electric operation. We demonstrate the use of the charging model to analyse different zero-emission scenarios for the Norwegian Coastal Express route. In the presented example scenarios, the model takes as input the estimated energy demand for a new zero-emission vessel design for the Coastal Express in different weather conditions, and includes functionality to consider realistic port stays based on existing timetables and historical data of delays. The analyses show minimal required battery and illustrate a trade-off between charging power and battery capacity, as well as exemplifying the impact of different timetables as well as historic deviations on charging and energy delivered from the battery. The charging model presented is general and can be used for other routes than the Norwegian Coastal Express, as a tool for decision-makers to optimize for battery-electric operation whilst keeping the need for onboard storage capacity and charging infrastructure installations at a minimum.
Keywords: 
;  ;  ;  ;  ;  
Copyright: This open access article is published under a Creative Commons CC BY 4.0 license, which permit the free download, distribution, and reuse, provided that the author and preprint are cited in any reuse.
Prerpints.org logo

Preprints.org is a free preprint server supported by MDPI in Basel, Switzerland.

Subscribe

Disclaimer

Terms of Use

Privacy Policy

Privacy Settings

© 2026 MDPI (Basel, Switzerland) unless otherwise stated