1. Introduction
As urbanization and industrialization accelerate across China, the nation’s demand for electricity continues to rise sharply. This increasing demand necessitates more efficient and reliable power transmission systems, driving advancements in electrical grid components. In recent decades, guyed transmission towers have become a prominent choice in China due to their strength, ease of installation, aesthetic appeal, and affordability. Among these innovations, V-shaped guyed towers represent a significant development in the structural design of guyed towers. However, a critical concern with V-shaped guyed towers is their heavy reliance on guy wires for support and stability. During installation, it is essential to ensure the appropriate tension of the guy wires, as any imbalance in tension reduces the reliability and safety of the tower, especially under challenging environmental conditions such as strong winds, ice, heavy snowfall, and extreme temperatures.
In response to China’s ongoing expansion of its energy infrastructure, numerous scholars have conducted studies to evaluate the performance and safety of guyed transmission towers under various loading conditions using either the finite element method or comprehensive evaluation methods. For instance, Jiang Lan et al. applied both the Bayesian Network (BN) method and Fault Tree (FT) method, offering valuable insights for the safety assessment and maintenance of transmission line guyed towers[
1]. Wang Jinyu et al., utilizing the matter-element extension theory, assessed the impact of meteorological factors on the safety of fundamental structures such as insulators, conductors, and lightning arresters within transmission line systems[
2]. Tan Rong et al. investigated the design safety of ultra-high tower structures using the Transmission Tower Analysis (TTA) program[
3]. Zhao and Wang conducted strength tests on 500kV guyed transmission towers under static wind loads, revealing that the original design may not adequately meet operational requirements. They proposed feasible reinforcement solutions to enhance the safety and stability of these structures[
4]. Zhu et al. performed a fragility analysis and evaluated the wind directionality-based failure probability of transmission towers under strong winds. They developed a method to calculate the damage and collapse probabilities of towers, taking into account wind directionality, thereby providing valuable insights for the design and maintenance of transmission towers[
5]. Liu and Xia developed a comprehensive safety assessment method for concrete poles in transmission lines, focusing on the degradation of concrete and steel components due to environmental factors[
6]. Jiang et al. studied the safety performance of transmission tower-line systems under uneven settlement conditions, highlighting the importance of considering the impact of foundation displacement on tower stability and cable stress[
7]. Additionally, Fu and Li conducted an uncertainty analysis of the strength capacity and failure paths of transmission towers under wind loads. They used a Latin Hypercube Sampling technique to generate random samples of material properties and section dimensions, and their findings indicated that material properties have a stronger influence on the failure modes compared to section dimensions[
8].Despite this extensive body of research, limited research has focused on the comparative impact of tension variability across guy wires in v-shaped tower designs.
In this study, two V-shaped guyed towers from a 500kV transmission line, which have been in service for few decades in the northern suburbs of Hubei Province, were selected and analyzed. We employed on-site measurements to gather actual tension force data from the guy wires and used the finite element method to simulate the performance of the guy wires under the designed ice and strong wind loads. The primary aim of this research is to compare the current condition of the guy wires with the original design specifications, evaluating whether, after years of service, the guy wires still meet their design specifications under the designed ice and wind loads.
2. Tension Force and Material Properties of Guy Wires
2.1. Tension Force Test
This paper conducted on-site measurements of the tension forces in the guy wires of two V-shaped guyed towers (see
Figure 1). Each tower is equipped with four sets of symmetrically arranged guy wires, with two wires per set. The SGSS-200kN tension meter was employed to measure the tension in each wire, with each measurement repeated twice. The measured tension values for each wire are recorded in
Table 1. Additionally, the diameter of each wire was measured three times, and the average value was taken to calculate the cross-sectional area, used to determine the stress in the guy wire, which is also listed in
Table 1. In the table,
N0 and
N0,av represent the measured tension force and its average value, respectively;
D0 and
D0,av denote the measured diameter and its average value. The average tensile stress in the guy wires, represented as σG0,t , is calculated as follows:
The identification of the guy wires for the guyed tower is illustrated in
Figure 2. The guy wires are arranged in a clockwise sequence and are designated as G1, G2, G3, and G4, with G1 representing the guy wire on the left side of the tower‘s front elevation. In
Figure 2, each position in the same direction has two guy wires, distinguished as A and B, which also identified in
Table 1.
According to the specifications outlined in the original design drawings for the selected guyed tower, the initial stress in the V-shaped guy wires is set at 120-160MPa. A comparison between the measured stress data of the guy wires and the specified design value (taken here as 140MPa) reveals that the stress levels of the majority of the guy wires range between 30% to 50% of the design value, with the maximum stress level reaching only 54% of the design state and the minimum stress level dropping to 22% of the design state. Consequently, the actual stress state of both towers exhibits significant reductions when compared to the design conditions.
2.2. Material Properties Testing of Guy Wire
Based on Chinese standard GB/T 228.1-2021[
9], the used guy wires removed from the actual tower site and new guy wires of the same material standard were split into single strand guy wires to make tensile test specimens. Material properties testing was conducted using an MTS universal testing machine, resulting in the stress-strain curves shown in
Figure 3. In
Figure 3, the label “old 1” and “old 2” denote the used guy wires, and the label “new 1” and “new 2” denote the new guy wires.
From
Figure 3, it can be observed that during the initial stage of the tensile test, the guy wire is not fully taut, resulting in rapid displacement changes and, consequently, rapid strain increase. Once the guy wire became completely tensioned, it entered the elastic phase, where the curve slope significantly increased compared to the previous phase. As the test load continued to increase, the guy wire material reached its elastic limit and then yielded. The stress-strain curve indicates that the yield strength of a single strand guy wire is approximately 1100MPa, with an ultimate strength of around 1300MPa. According to the Chinese standard GB 50545-2010[
10], the ultimate stress of the 19 stranded galvanized steel wire used in actual use is about 720MPa, and the yield stress is about 600MPa.The yield strength and ultimate strength of the used guy wires show no significant difference from those of the unused guy wires. Therefore, in subsequent model creation, these values will be used as the basic material properties of the guy wires.
3. Finite Element Model for the Guyed Tower
Based on the relevant design drawings, the guyed tower is constructed of steel and uses bolts to connect the angles and plates. During the model creation, the tower body is modeled entirely using beam elements, while the guy wires are modeled using truss elements. The connections between members are rigidly connected beam elements. The entire transmission tower is divided into five parts as shown in
Figure 2, and individual component models are created before being assembled into the final guyed tower model. The connections between Parts 1, 2, 3, and 4 are tied, while the connection between Part 5 (the guy wires) and Parts 1 and 2 is coupled. The mesh size for the tower members is 0.2 meters, and each of the four guy wires is a single mesh element. It should be noted that the two wires A and B which are set in the same position and direction mentioned above, are simplified as single wire with same cross-sectional area as total of these two wires.
Boundary conditions for the finite element model are established based on the transmission tower drawings and its actual operational state. At the base of the four guy wires, hinges are implemented, constraining all three axial degrees of freedom (U1=U2=U3=0) and allowing only rotations. A reference point is positioned at the center of each of the two tower bases, coupled to the bottom of each member, and these reference points are set as pinned (U1=U2=U3=0). In actual engineering, metal components at the bottom of the tower are prone to rusting. The bottom of many guyed towers are wrapped with cement for preventing further rusting of the metal components. The rotation at the bottom of the tower is restricted. The analysis also considers this type of boundary condition, with the base of the tower foot set to fixed constraints (U1=U2=U3=0, UR1=UR2=UR3=0).
According to the special loading conditions specified in the design, as shown in
Figure 2, reference points RP1, RP2, RP3, RP4, and RP5 are created at five positions on the top of the model tower. These reference points are coupled with the tower members, and corresponding concentrated loads are applied to each reference point. These reference points correspond to the three transmission wire joints and two ground wire joints of the transmission tower. Two loading conditions including the ice loading and the high wind loading are selected for simulation analysis. Under the ice loading, the lateral load is relatively small, while the vertical load is larger. Under the high wind conditions, the lateral load is larger, while the vertical load is smaller, making the comparison between the two conditions quite distinct. Among them, the lateral load under the ice loading conditions is 5.9
kN for RP1~RP3, 1.2
kN for RP4 and RP5, and the vertical load is 49
kN for RP1~RP3, 8.35
kN for RP4 and RP5, respectively; Under the high wind loading conditions, the lateral load is 18.8
kN for RP1~RP3, 2.9
kN for RP4 and RP5, and the vertical load is 27.7
kN for RP1~RP3, and 4.25
kN for RP4 and RP5, respectively. Noting that the measured internal forces in the guy wires of towers show that the stresses in the guy wires G3 and G4 are lower than those in the guy wires G1 and G2, the lateral load is applied to be along the
x-positive direction in the
xoz plane, which towards the guy wires G3 and G4, to simulate the most unfavorable loading conditions of the guyed tower. Additionally, a gravitational acceleration of 9.8 m/s² is applied in the vertical direction to account for the self-weight of the structure.
As previously mentioned, truss elements are utilized to simulate the guy wires of the transmission tower, and a cooling method is employed to apply prestress, effectively achieving stress loading in the guy wires. The linear thermal expansion coefficient is defined by the following formula:
where
ΔL represents the change in length of the object,
L denotes the original length of the object, and
ΔT indicates the change in temperature. In the truss element, the ratio of
ΔL to
L corresponds to the normal strain ε. The normal stress
σ can be derived using the using the following formula:
Herein,
σ represents the normal stress, and
E denotes the elastic modulus. In the simulation, the prestress settings will be divided into three scenarios: In the first scenario, the prestress values of all guy wires are set to be the same as the measured stress values of the guy wires of Tower 1; in the second scenario, the prestress values of all guy wires are set to be the same as the measured stress values of the guy wires of Tower 2;in the third scenario, the prestress of all guy wires is set to the initial prestress value of 140MPa as given in the design drawings, and this model is referred to as Tower 3. When creating the model, the guy wire section was simplified by replacing the actual double guy wires with a single equivalent guy wire, and the input guy wire stress value should be the measured average stress value of guy wires A and B. The initial stress values
σG0 input for each guy wire of each tower are shown in
Table 2. In the model analysis, various types of steel used are assumed to follow an idealized elastoplastic model, with a Young‘s modulus of 206GPa and a Poisson’s ratio of 0.3; the Young’s modulus of guy wires is 110GPa, and Poisson’s ratio is 0.25. The yield strength of the guy wires is taken from the aforementioned test values, and the yield strength of the steel material is 345MPa.
4. Simulation Results
Simulations were conducted for Tower 1, Tower 2 and Tower 3 under two loading conditions: the ice loading and the high wind loading, considering both fixed and pinned boundary conditions at the tower base. This analysis yielded the stress states and displacement conditions for the guyed towers under various scenario. Representative stress contour plots and displacement contour plots are shown in
Figure 4. The stress in the guy wires (
σG) under the ice loading and the high wind loading, as well as the maximum displacement (
Umax) of the tower, were extracted and recorded in
Table 3 and
Table 4, respectively. In these tables,
σF represents the maximum Mises stress at the tower base;
β denotes the inclination angle of the tower. This angle was calculated based on the relationship between the lateral and vertical displacements at the tower top center point and the design tower height (
H=33m), specifically,
, where
U1 is the horizontal displacement in the
x-direction, and
U3 is the vertical displacement in the
z-direction. The parameters
δU and
δβ represent the reduction ratios in maximum displacement and tower inclination angle, respectively, comparing the fixed condition to the pinned condition for each tower.
Table 3 reveals that under both the pinned and fixed conditions at the tower base, the maximum stress in the tower body is concentrated near RP1 and the base of the tower, with the stresses in the left guy wires G1 and G2 significantly exceeding those in G3 and G4:
(1) Under the ice loading condition, when Towers 1 and 2 are configured with pinned bases, the maximum stresses of the tower body are 79.18MPa and 84.96MPa, respectively. When the base is fixed, the maximum stresses of the tower body are 146.2MPa and 150.80MPa. This indicates that the differences in internal forces of the guy lines have a relatively minor impact on the maximum stress of the tower body under ice loading conditions. Given that the current internal forces in the guy wires differ significantly from the original design conditions, whether the base is pinned or fixed, the maximum stress in the tower body shows notable variations, with Towers 1 and 2 exhibiting approximately a 20% reduction in maximum stress compared to Tower 3.
(2) Under the ice loading condition, analysis of the maximum stress at the tower base indicates significant variations between the pinned and fixed conditions. Compared to the pinned base condition, the maximum stresses for Towers 1, 2, and 3 increase by 85%, 77%, and 63%, respectively, when the bases are fixed. When the initial stress in the guy wires is relatively high, the magnitude of the maximum stress increase tends to decrease. This is attributed to the greater initial stress enhancing the guy wires’ capacity to resist lateral loads, thereby reducing the bending moments experienced at the fixed base and narrowing the difference in maximum stress compared to the pinned condition.
(3) Under the ice loading condition, it was observed that for Towers 1, 2, and 3, the final stresses of the four groups of guy wires in the pinned configuration are similar to those in the fixed configuration, indicating that the final stress levels are largely independent of the boundary conditions at the tower base. A comparison of stresses among the guy lines of Towers 1, 2, and 3 reveals that Tower 3 exhibits the highest final stresses, followed by Tower 2, with Tower 1 showing the lowest. This suggests a direct proportional relationship between guy wire stress and initial stress under the ice loading conditions. Notably, under the ice loading condition, the stresses in guy wires G3 and G4 of Tower 3 are zero, indicating that these wires are in a completely relaxed state, while the stress in Tower 2 is only 20MPa. Thus, if the current tension in the guy wires is too low, they may be in a fully relaxed state or experiencing excessively low stress under the ice loading.
(4) Analysis of maximum displacement and the inclination angle of the tower body shows that, compared to the pinned condition, the maximum displacements and inclination angles are relatively smaller when the towers are fixed. Given the relatively low initial stress, the reduction in maximum displacement and inclination angle for Tower 1 when transitioning from pinned to fixed conditions is significant. A comparison of the maximum displacements and inclination angles of Towers 1, 2, and 3 indicates that they decrease with increase in the initial stress . When compared to Tower 3, the displacements for Tower 1 increase by 28.6% and 20.6% under pinned and fixed conditions, respectively, while maximum displacements of Tower 2 increase by 16.9% and 15.5%. Therefore, the increase in tower body displacement, compared to the design state, is related to the initial stress in the guy lines.
(1) Similar to the ice accretion load scenario, under both pinned and fixed base conditions, the maximum stress in the tower structure is minimally influenced by the initial tensile stress of the guy wires. However, within the same tower, the maximum stress in the fixed model significantly exceeds that of the pinned model. Specifically, when compared to the pinned configuration, the maximum stresses in Towers 1, 2, and 3 under the fixed conditions increase by 275%, 206%, and 135%, respectively. This indicates that under the influence of strong lateral wind loads, converting the tower base from a pinned to a fixed configuration significantly amplifies the maximum stress at the base. Furthermore, when the initial tensile stress is relatively low, the local stress after fixing reaches the yield stress.
(2) Under the high wind load conditions, when in pinned configuration, the stress in the tension wires G1 and G2 of Tower 1, 2, and 3 is equivalent to that of the fixed connection, exceeding 200MPa. Conversely, the stresses in guy wires G3 and G4 are minimal, with both G3 and G4 for Towers 1 and 2 registering as 0. This indicates that under significant lateral wind loading, the ultimate stress levels in the guy wires are largely independent of the connection configuration at the base of the towers, and are more closely related to the initial stress in the guy wires and the direction of the wind. Consequently, if the current tension in the guy wires is insufficient, they may reach a state of complete slackness under the high wind loads, which poses a risk to structural safety.
(3) The analysis of maximum displacements and tower inclination angles reveals that changing the base connection from pinned to fixed has a minimal impact on the maximum displacements and angular changes of each tower. Unlike scenarios involving ice accumulation, the maximum displacements and tower inclination angles in this case exhibit a significant increase. This is primarily due to the lateral load component of the wind forces. As the initial tensile stress in the guy wires increases, the maximum displacement and tower inclination angle decrease; furthermore, the changes observed when transitioning from pinned to fixed connections are also less pronounced. Specifically, in comparison to Tower 3, Tower 1 experiences increases in maximum displacement of 101% and 98% under the pinned and fixed conditions, respectively. Tower 2 shows increases of 45% and 44% under the same conditions. Consequently, under the high wind load conditions, a reduction in the initial tensile stress of the guy wires significantly compromises the structural safety of the towers.
Furthermore, comparing the relationship between guy wire stress and initial stress under the ice load and the high wind load conditions reveals that, under lower horizontal load scenarios, the initial tensile stress more significantly affects the final stress state of the guy wires. Specifically, as the initial tensile stress increases, the final guy wire stress also increases. In contrast, under conditions of the higher horizontal load, influence of the initial tensile stress on the final stress state of the guy wires becomes less pronounced; thus, the final guy wire stress is not entirely dependent on the initial tensile stress. Regarding the parameters of maximum displacement and inclination angle of the tower, their values are entirely contingent on the level of the initial tensile stress. Higher initial tensile stress results in reduced maximum displacement and inclination angle of the tower under the identical loading conditions.
5. Discussions
As observed in
Table 3 and
Table 4, under the effects of ice accretion loads and high wind loads, the models with lower initial tension in the guy wires exhibit cases where the final tension in guys G3 and G4 reaches zero. This phenomenon occurs in instances such as Tower 1 under the ice accretion load and Towers 1 and 2 under the high wind load, where complete slackening of the guy wires is noted regardless of whether the tower base is fixed or pinned. Through a detailed analysis of the simulation process, the load conditions at which the tension in guys G3 and G4 first becomes zero, along with the corresponding percentage ratio of the applied load to the total load under each operating condition, are summarized in
Table 4.
Table 4-1.
Guy Wire Slackening Time.
Table 4-1.
Guy Wire Slackening Time.
| Tower |
Load |
Boundary Condition |
△L(%) |
| Tower 1 |
ice accretion |
Pinned |
80 |
| Tower 1 |
ice accretion |
Fixed |
80 |
| Tower 1 |
Strong wind |
Pinned |
40 |
| Tower 1 |
Strong wind |
Fixed |
40 |
| Tower 2 |
Strong wind |
Pinned |
55 |
| Tower 2 |
Strong wind |
Fixed |
55 |
Under the ice accretion loads, guys G3 and G4 in Tower 1 experience complete slackening when the applied load reaches approximately 80% of the design load level. In the case of high wind loads, guys G3 and G4 in Towers 1 and 2 fully slacken at around 40% and 55% of the design load level, respectively. However, even when guys G3 and G4 are completely slack, the maximum stress observed in guys G1 and G2 across these conditions reaches only 261.30MPa, which is less than 50% of the yield stress of 600MPa. This indicates that, from a structural loading perspective, there is no immediate risk to the tower body. However, the absence of tension in G3 and G4 compromises the stabilizing effect of these guys, creating potential stability concerns for the overall structure.
Table 3 and
Table 4 further reveal that, when the base constraint of the tower changes from a pinned to a fixed connection, the Mises stress at the tower base increases significantly, indicating that the stress state at the base is critical for overall structural safety. According to the data, only Tower 1, under high wind load with a fixed base, reaches the yield stress of 345MPa at the base. In all other scenarios, the stress levels remain within safe limits. Simulation analysis of Tower 1 under high wind and fixed base conditions shows that the maximum stress at the base reaches the yield stress when 95% of the design load is applied. Thus, for guyed towers like Tower 1, where the initial tension in the guys is relatively low, it is inadvisable to alter the base constraint to a fixed support, as this could lead to yield in the steel structure at the base, posing a substantial risk to structural safety.
6. Conclusions
Based on actual in-situ measurements of guy wire tension and material property tests, this study established a finite element model for analyzing the structural response of guyed towers. Comparative analyses were conducted to assess the structural behavior of the tower under the ice accretion and high wind loads at the current guy tension levels. The main conclusions are as follows:
When the tower base is either pinned or fixed, the difference in actual guy tension levels between Towers 1 and 2 under the ice and wind loads has a minimal impact on the maximum stress in the tower body. However, it significantly influences the maximum displacement and inclination angle of the tower body.
The type of base constraint (pinned or fixed) results in notable differences in maximum stress in the tower body under both load conditions. The lower the existing guy tension level, the more pronounced this difference becomes. Specifically, under high wind load conditions with a fixed base, the maximum base stress in Tower 1 is 275% greater than when the base is pinned.
The initial tension level of the guy wires has a substantial effect on guy wire tension under both the ice and wind loads. Some guy wires in Towers 1 and 2 may fully slacken under relatively low ice or wind load conditions, which can threat to the structural stability of the guyed tower.
Additionally, with a fixed base connection, local yield failure at the base of Tower 1 may occur when subjected to 95% of the design wind load level.
Author Contributions
All authors of this paper have made objective contributions within the scope of their respective job responsibilities, as detailed below: Conceptualization, H.C.; methodology, H.C. and A.Z.; Software, H.W.; Validation, H.C., Y.W., H.Y. and L.X.; Formal Analysis, H.W. and M.P.K.; Investigation, M.P.K. and H.W.; Writing – Original Draft Preparation, H.W. and M.P.K.; Writing – Review & Editing, A.Z. and H.C.; Supervision, H.C., Y.W. and H.Y.; Project Administration, L.X.
Data Availability Statement
The data presented in this study are available on request from the corresponding author.
Conflicts of Interest
We have no known competing financial interests or personal relationships that could have appeared to influence the work reported in this paper.
References
- Jiang, L.; Cao, Z.; Tang, B.; Chen, B. Safety Evaluation Method of Guyed Tower Based on Bayesian Network. Spec. Structures. 2024, 41, 18–24. [Google Scholar]
- Wang, J.; Li, Z.; Liang, Y.; Meng, G. Safety evaluation of transmission lines considering meteorological factors. J. Electr. Power Sci. Technol. 2023, 38, 210–217. [Google Scholar] [CrossRef]
- Tan, R.; Sun, J.H.; Dang, K.N.; Yue, X. Research on Design Safety of Extra-High Transmission Tower Structure. Power Syst. Clean Energy. 2013, 29, 93–97. [Google Scholar]
- Zhao, Q.; Wang, D. The design and calculation on strength tests of 500kV guyed transmission tower under static wind load. International Conference on Multimedia Technology, Hangzhou, China. 2011: 1796-1799.
- Zhu, C.; Yang, Q.; Huang, G.; Zhang, X.; Wang, D. Fragility analysis and wind directionality-based failure probability evaluation of transmission tower under strong winds. J. wind. Eng. Ind. Aerod. 2024, 246, 105668. [Google Scholar] [CrossRef]
- Liu, S.Y.; Xia, K.Q. Evaluation Method for Concrete Pole Safety of Overhead Transmission Line. Electr. Power. 2013, 46, 65–68. [Google Scholar]
- Jiang, T.; Zhang, Y.; Wang, Y.; Yu, B.; Zhang, Y.; Ge, Y. Research on the Safety of Transmission Tower Line System Under Uneven Settlement. Constr. Technol. 2018, 47, 132–136. [Google Scholar]
- Fu, X.; Li, H.N. Uncertainty analysis of the strength capacity and failure path for a transmission tower under a wind load. J. wind. Eng. Ind. Aerod. 2018, 173, 147–155. [Google Scholar] [CrossRef]
-
GB/T 228.1-2021; China National Standardization Administration, Metallic materials- Tensile testing- Part 1: Method of test at room temperature. National Standards of the People’s Republic of China: Beijing, China, 2021.
-
GB 50545-2010; China National Standardization Administration, Code for Designing of 110~750kV Overhead Transmission Line. National Standards of the People’s Republic of China: Beijing, China, 2010.
|
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |