Abstract
Keywords:
1. Introduction
2. Literature Review
3. Development Methodology
3.1. Phase 1- Data Collection and Integration
3.2. Phase 2 – Creation of BIM 3D Model
3.3. Phase 3 – Energy Analysis, LCA and Simulation
3.4. Phase 4 – LCCA Integration
4. Model Testing and Results
5. Discussion, Limitations and Future Works
6. Conclusion
References
- Akbarnezhad, A., & Nadoushani, Z. S. M. (2014). Estimating the Costs, Energy Use and Carbon Emissions of Concrete Recycling Using Building Information Modelling. ISARC Proceedings, 385–392.
- Akbarnezhad, A. , & Xiao, J. (2017). Estimation and minimization of embodied carbon of buildings: A review. Buildings, 7(1), 5–5.
- Altaf, M. , Alaloul, W. S., Musarat, M. A., Bukhari, H., Saad, S., & Ammad, S. (2020). BIM Implication of Life Cycle Cost Analysis in Construction Project: A Systematic Review. 2020 Second International Sustainability and Resilience Conference: Technology and Innovation in Building Designs (51154),1–7. [CrossRef]
- Ansah, M. K. , Chen, X., Yang, H., Lu, L., & Lam, P. T. I. (2020). An integrated life cycle assessment of different façade systems for a typical residential building in Ghana. Sustainable Cities and Society, 53, 101974. [CrossRef]
- Anton, L. _A., Díaz, J., (2014). Integration of life cycle assessment in a BIM environment. Procedia Engineering 85, 26e32. [CrossRef]
- Dixit, M. K. , Fernández-Solís, J. L., Lavy, S., & Culp, C. H. (2012). Need for an embodied energy measurement protocol for buildings: A review paper. Renewable and Sustainable Energy Reviews, 16(6), 3730–3743. [CrossRef]
- Elnabawi, M. H. (2020). Building Information Modeling-Based Building Energy Modeling: Investigation of Interoperability and Simulation Results. Frontiers in Built Environment, 6. [CrossRef]
- Government of Canada. (2024). Carbon Tax. Retrieved from British Colombia Government website: https://www2.gov.bc.ca/gov/content/environment/climate-change/clean-economy/carbon-tax. Retrieved on April, 23, 2024.
- Guo, F. , Gregory, J., Kirchain, R., Probabilistic (2019), life-cycle cost analysis of pavements based on simulation optimization, Transp. Res. Rec. 2673, 389–396. https:// doi.org/10.1177/0361198119838984.
- Huang, L. , Liu, Y., Krigsvoll, G., Johansen, F., (2018), Life cycle assessment and life cycle cost of university dormitories in the southeast China: case study of the university town of Fuzhou, J. Clean. Prod. [CrossRef]
- Jalaei, F., Jrade, A., Nassiri, M., (2015). Integrating decision support system (DSS) and building information modeling (BIM) to optimize the selection of sustainable building components, J. Inform. Technol. Construct. 20 (2015) 399–420. https: //www.itcon.org/paper/2015/25.
- Jermyn, D., (2022) “Do you want to age in place? This is what renovations could cost,” THE GLOBE AND MAIL, October 2022.
- Juan, Yi-Kai & Hsing, Nai-Pin. (2017). BIM-Based Approach to Simulate Building Adaptive Performance and Life Cycle Costs for an Open Building Design. Applied Sciences (Switzerland). 7. 10.3390/app7080837.
- Kehily, D. , Woods, T., & McDonnell, F. (2013). Linking Effective Whole Life Cycle Cost Data Requirements to Parametric Building Information Models Using BIM Technologies. International Journal of 3-D Information Modeling (IJ3DIM), 2(4), 1–11. [CrossRef]
- Kneifel, J., (2010). Life-cycle carbon and cost analysis of energy efficiency measures in new commercial buildings, Energy Buildi. 42, 333–340. [CrossRef]
- Koeppel, K., (2022), “What Is Aging in Place and How Is It Beneficial?,” November 2022. [Online]. Available: https://aging.com/best-mobility-scooters/what-is-aging-in-place-and-how-is-it-beneficial/. [Accessed 05 07 2023].
- Kovacic, I., Zoller, V., (2015). Building life cycle optimization tools for early design phases, Energy 92 (2015) 409–419. [CrossRef]
- Langston, C. , Chan, E. H. W., & Yung, E. H. K. (2018). Hybrid Input-Output Analysis of Embodied Carbon and Construction Cost Differences between New-Build and Refurbished Projects. Sustainability, 10(9), Article 9. [CrossRef]
- Le, H. T. T. , Likhitruangsilp V., and N. Yabuki, (2020). “A BIM-Integrated Relational Database Management System for Evaluating Building Life-Cycle Costs”, Eng. J., vol. 24, no. 2, pp. 75-86, Mar. 2020.
- Lee, Jaewook & Yang, Hyuncheul & Lim, Jinkang & Hong, Taehoon & Kim, Jimin & Jeong, Kwangbok. (2020). BIM-based preliminary estimation method considering the life cycle cost for decision-making in the early design phase. Journal of Asian Architecture and Building Engineering. 19. 1-16. 10.1080/13467581.2020.1748635.
- Llatas, C. , Soust-Verdaguer, B., and Passer, A. (2020). Implementing Life Cycle Sustainability Assessment during design stages in Building Information Modelling: From systematic literature review to a methodological approach, Building and Environment, Vol. [CrossRef]
- Muller, M.F. , Esmanioto, F., Huber, N., Loures, E.R., Canciglieri, O., (2019). A systematic literature review of interoperability in the green Building Information Modeling lifecycle, J. Clean. Prod. [CrossRef]
- NIA, (2022), “Ageing in the Place: Supporting Older Canadians to Live Where They Want,” National Institute on Ageing, Toronto, 2022. Retrieved from https://www.niageing.ca/airp. Access date: December 2023.
- NIA, (2020), “Pandemic Perspectives on Ageing in Canada in Light of COVID-19: Findings from a National Institute on Ageing/TELUS Health National Survey,”.
- Nwodo, M. , and Anumba, C., (2019), “A review of life cycle assessment of buildings using a systematic approach, Building and Environment, Vol. [CrossRef]
- Rad, M. A. H. , Jalaei, F., Golpour, A., Varzande, S. S. H., & Guest, G. (2021). BIM-based approach to conduct Life Cycle Cost Analysis of resilient buildings at the conceptual stage. Automation in Construction, 123, 103480. [CrossRef]
- Rashed, Yussra & Nosair, Ibrahim & Nassar, Khaled & Mashaly, Islam & Ghanem, Meshary. (2019). A BIM-based Life Cycle Cost (LCC) Method to Reduce the Operation Energy Costs in Buildings. 151-158. 10.26868/25222708.2019.210616.
- Robati, M. , Oldfield, P., Akbar Nezhad, A., Carmichael, D., & Kuru, A. (2021). Carbon value engineering: A framework for integrating embodied carbon and cost reduction strategies in building design. Building and Environment, 192, 107620. [CrossRef]
- Rostamiasl, V. and Jrade, A., (2022), “Integrating Universal Design Standards and Building Information Modeling at the Conceptual Design Stage of Buildings,” Open Journal of Civil Engineering, vol. 12, no. 4, pp. 492–523.
- Santos, R. , Costa, A. A., Silvestre, J. D., Vandenbergh, T., & Pyl, L. (2020). BIM-based life cycle assessment and life cycle costing of an office building in Western Europe. Building and Environment, 169, 106568. [CrossRef]
- Schmidt, M. , Crawford, R. H., & Warren-Myers, G. (2020). Integrating life-cycle GHG emissions into a building’s economic evaluation (1). 1(1), 361-378, Article 1. [CrossRef]
- Shin, Y., and Cho, K. (2015). BIM Application to Select Appropriate Design Alternative with Consideration of LCA and LCCA. Mathematical Problems in Engineering Volume 2015. [CrossRef]
- Sun, H. , & Park, Y. (2020). CO(2) Emission Calculation Method during Construction Process for Developing BIM-Based Performance Evaluation System. APPLIED SCIENCES-BASEL, 10(16). [CrossRef]
- Trout, J. and Smith, J., “The Cost of Aging in Place Remodeling,” (2023). [Online]. Available: https://www.retirementliving.com/the-cost-of-aging-in-place-remodeling. [Accessed 07 2023].
- Valinejadshoubi, Mojtaba & Moselhi, Osama & Iordanova, I. & Valdivieso, Fernando & Bagchi, Ashutosh. (2024). Automated system for high-accuracy quantity takeoff using BIM. Automation in Construction. 157. 105155. 10.1016/j.autcon.2023.105155.
- Viscuso, S. , Monticelli, C., Ahmadnia, A., & Zanelli, A. (2022). Integration of life cycle assessment and life cycle costing within a BIM-based environment. Frontiers in Sustainability, 3. [CrossRef]
- Wu, Wei, and Emily Handziuk. (2013) “Use of Building Information Modeling in Aging-in-Place Projects: A Proof of Concept.” Computing in Civil Engineering, 2013, pp. 443–50. [CrossRef]
- Yang, X. , Mingming Hu, Jiangbo Wu, Bin Zhao, (2018) “Building-information-modeling enabled life cycle assessment, a case study on carbon footprint accounting for a residential building in China,” Journal of Cleaner Production, Vol. 183, pp. [CrossRef]
- Younis, A. , Ebead, U., and Judd, S., (2018), Life cycle cost analysis of structural concrete using seawater, recycled concrete aggregate, and GFRP reinforcement, Constr. Build. Mater. [CrossRef]
- Zoghi, M. , & Kim, S. (2020). Dynamic Modeling for Life Cycle Cost Analysis of BIM-Based Construction Waste Management. In Sustainability (Vol. 12, Issue 6). [CrossRef]















| Number of Panes | 1st Pane Glass type | 2nd Pane Glass Type | Window Gas type | Glazing | Window Frame | Frame Width |
|---|---|---|---|---|---|---|
| 2 | Clear 3 mm | Clear 3 mm | 13 mm Air | 30% Glazed | UPVC | 0.04 m |
| Optimization Parameters | Design Variables | Objectives |
| Wall Materials (Three Alternatives) Roof Materials (Three Alternatives) Window to Wall ratio (Ranging from 20% to 80%) Windo Glazing types (single, doubled and tripled) Window frame Materials (Three Alternatives) |
Embodied carbon Total Energy Consumption |
| Project’s work item(s) | Price Range to Install* | Average Cost* |
|---|---|---|
| Walk-in Tub or Shower | $5,000 to $20,000 | $12,500 |
| Ramp Installation at Entrance | $1,200 to $2,500 | $1,850 |
| Widen an Entry Door | $300 to $10,000 | $5,150 |
| Stairlift Installation | $4,000 to $27,000 | $15,500 |
| Install Entry Handrails | $1000 to $1,600 | $1,300 |
| Install an Elevator | $45,000 to $100,000 | $72,500 |
| Install Lever Taps on Faucets | $250 to $500 | $375 |
| Widen Hallways w/out Structural Changes | $1,100 to $2,000 | $1,550 |
| Widen Hallways with Structural Changes | $41,000 to $55,000 | $48,000 |
| Replace 10 Windows | $7,500 to $14,500 | $11,000 |
| Remodel Bathroom | $20,000 to $38,500 | $29,250 |
| Kitchen Countertop Height Adjustment | $20,000 to $27,500 | $23,750 |
| Replace the Bathroom floor with a nonslip surface | $9,000 to $37,500 | $46,500 |
| Through-the-Floor Lift (only links two floors) | $30,000 | $30,000 |
| porch lift | $9,000 | $9,000 |
| kitchen Renovation | $40,000 to $80,000 | $60,000 |
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |