Abstract
Metro timetable optimisation has the potential to improve passenger service quality, operational efficiency, and system performance. However, most existing studies focus on line-level or network-level optimisation, with limited attention paid to station-level operational impacts. This study addresses this gap by developing a scenario-based simulation and optimisation framework to evaluate and optimise metro timetable performance from an individual station perspective. Agent-based discrete-event simulation models were utilised to represent passenger movements and train operations within metro stations. The framework was applied to two real-world case studies: De Ferrari Station in Genoa, and Serdica Station in Sofia. Simulation experiments were conducted to examine effects of different train headway and dwell-time combinations on station performance. The results were subsequently integrated into a two-stage Mixed-Integer Linear Programming (MILP) model to identify operationally feasible timetable solutions that improved station operational performances. Practical considerations according to metro operators’ real-life operational experiences were deliberately incorporated, substantiating real-life implementation practicality of the proposed solutions. The findings indicate that train headway is the most influential factor affecting passenger waiting times, whilst dwell time plays a secondary but complementary role, particularly during peak periods. The optimised solutions substantially reduced passenger waiting times, queue lengths, and overall time spent within stations compared with existing operations. Furthermore, the proposed solutions remained effective under a future demand scenario involving a 25% increase in passenger volumes. The study provides a practical station-centred framework that bridges the gap between timetable optimisation theory and operational implementation, supporting evidence-based metro service planning and decision-making for real-world metro operators.
Keywords:
metro timetable optimisation
; station operations
; agent-based simulation
; MILP
; passenger waiting time
; urban rail transit
1. Introduction
Urban metro systems are essential components of sustainable urban mobility, providing high-capacity, reliable, and efficient transport services for growing urban and metropolitan populations. As cities continue to expand and passenger demand increases, metro operators face massive challenges in maintaining service reliability, minimising passenger waiting times, managing platform crowding (sometimes measured in the form of queue lengths), improving energy efficiency, and optimising the utilisation of existing infrastructure and rolling stock. Timetable planning is a critical element of metro operations, as train headways, frequencies, and dwell times directly influence both passenger experience and operational performance.
Traditionally, metro timetables have been developed using a combination of fixed operational rules, historical passenger demand patterns, expert judgement, and service planning experience. However, recent advances in data availability, computational power, and optimisation techniques have enabled the development of more sophisticated approaches to timetable design. This provides opportunities to develop data-driven methods capable of evaluating and optimising metro operations under varying demand and service conditions. Consequently, a growing body of research has investigated the use of mathematical optimisation, simulation modelling, metaheuristic algorithms, and artificial intelligence techniques to improve metro timetable performance.
Previous studies have reported substantial potential benefits from timetable optimisation. These include reductions in passenger waiting times, improved capacity utilisation, alleviation of platform congestion, enhancement of disruption recovery capabilities, reductions in fleet requirements, and improvements in energy efficiency. Importantly, many of these studies have validated their proposed approaches using datasets derived from real-world metro systems. The reported results suggest that data-driven timetable optimisation could deliver significant operational and passenger benefits without requiring major infrastructure investment.
Despite these promising findings, there remains limited evidence of widespread implementation of advanced timetable optimisation techniques by metro operators. Most studies have focused on network-level optimisation problems. Little attention has been given to station-level operational impacts, despite the fact that many of the consequences of timetable decisions are experienced directly at individual stations through variations in passenger demand, train dwell times, platform occupancy, passenger waiting times, and train throughput. As a result, a gap remains between the theoretical benefits demonstrated by optimisation models and their practical application in supporting operational decision-making at the station level.
This study seeks to address this gap through the development of a scenario-based simulation and optimisation framework for an individual metro station. Rather than focusing on network-wide scheduling, the current study investigates how modifications to timetable parameters, particularly train headways and dwell times, influence station performance under different operating scenarios. Specifically, operational and timetable data will be used to evaluate the interaction between train movements and passenger demand, allowing the impacts of alternative timetable strategies to be assessed within a realistic station operating environment.
In short, the objectives of the current study are:
- To develop a simulation-based representation of metro station operations capable of capturing the interaction between passenger demand and train services.
- To evaluate the impacts of alternative timetable scenarios on key operational and passenger performance indicators, including passenger waiting times and queue lengths.
- To identify timetable configurations that improve station-level performance through the optimisation of operational parameters such as train headways and dwell times.
The principal contribution of this paper lies in bridging the gap between theoretical timetable optimisation research and practical operational analysis. Whilst existing studies predominantly focus on network-level optimisation, this study adopts a station-centred perspective and demonstrates how simulation and optimisation techniques can be used to assess the operational implications of timetable changes within a realistic metro environment. The study therefore contributes to the growing body of knowledge on data-driven metro operations and provides a practical framework that assist operators in evaluating timetable adjustments and supporting evidence-based service planning decisions.
Finally, by focusing on detailed station-level case studies of two real-world metro systems in Genoa, Italy (i.e. AMT) and Sofia, Bulgaria (i.e. MetroS), the current study provides insight into whether the benefits reported in previous timetable optimisation studies can be realised within a practical operational context, thereby contributing towards a better understanding of how advanced optimisation techniques may support future metro timetable development and operational decision-making.
It is important to note that the current research is positioned somewhat differently from many line-based and network-wide train timetable optimisation studies. Rather than seeking to develop a real-time control framework for an entire metro network, the proposed methodology is intended to support decision-making in situations where the operational needs of a particular station may warrant special consideration.
The remainder of this paper is structured as follows. Section 2 reviews relevant literature on metro timetable optimisation using real-life metro operational datasets, highlighting the potential benefits, practical implementation challenges, and implications for station-level operational analysis. Section 3 introduces the overall research methodology, the selected case studies, and a brief description of the adopted metro station simulation models. Section 4 presents the formulation of the two-stage optimisation framework, including the simulation-based development of objective functions and the mixed-integer linear programming (MILP) model. Section 5 reports the optimisation and simulation results for the Genoa and Sofia case studies and evaluates the effectiveness of the proposed solutions under both current and future passenger demand scenarios. Finally, Section 6 concludes the paper by discussing the key findings, contributions, limitations, and opportunities for future research.
2. Literature Review
2.1. Potential Benefits of Metro Timetable Optimisation
Metro timetabling has evolved from a traditionally manual planning exercise into an increasingly data-driven discipline supported by optimisation algorithms, simulation models, and artificial intelligence. Recent studies have demonstrated that timetable optimisation can improve operational efficiency, passenger service quality, capacity utilisation, resilience, and energy performance. Many of these studies have been validated using operational data from real-world metro systems, suggesting considerable practical potential for implementation.
One of the most frequently reported benefits is the reduction of passenger waiting times. Timetable optimisation allows train departures, frequencies, and dwell times to be better aligned with passenger demand patterns. For example, [1] developed an optimisation model for rail-metro interchange stations using Beijing Metro Line 9 and demonstrated a 28.47% reduction in passenger waiting times by coordinating metro departures with the arrival of intercity rail services. Similarly, [2] applied timetable optimisation to Beijing Metro Line 1 and reported a 15.5% reduction in waiting times through the optimisation of service frequencies and dwell times. These studies demonstrate how demand-responsive timetables can improve passenger experience while making more effective use of existing infrastructure.
In addition to reducing waiting times, timetable optimisation can improve network capacity and alleviate crowding. Peak-period congestion remains one of the most significant operational challenges for metro systems worldwide. [3] developed an optimisation framework combining timetable design with passenger flow control strategies and reported a 40.8% reduction in passenger waiting times while reducing platform congestion levels. Likewise, [4] demonstrated that flexible service patterns, including express-local operations and directional service adjustments, could better accommodate tidal passenger flows and significantly reduce overall passenger and operator costs. These findings suggest that timetable optimisation can contribute to more balanced network utilisation without necessarily requiring major infrastructure investment.
Operational efficiency and resource utilisation have also been identified as key benefits. Several studies have demonstrated that optimisation can improve the deployment of rolling stock and service resources. [5] examined short-turning operations on Beijing Subway Line 4 and reported a 20.69% reduction in fleet utilisation requirements. Similarly, [6] proposed an integrated optimisation framework linking line planning, timetabling, and rolling-stock scheduling, achieving reductions in operating costs while improving fleet allocation efficiency. These results indicate that timetable optimisation can provide financial benefits to operators by reducing resource requirements while maintaining acceptable service levels.
Another significant area of research concerns timetable resilience and disruption management. Metro systems regularly experience operational disturbances caused by infrastructure failures, equipment malfunctions, passenger incidents, and adverse weather conditions. Consequently, several researchers have explored the use of optimisation models to support real-time service recovery. [7] proposed a two-stage rescheduling framework that incorporated strategies such as retiming, train cancellation, short-turning, and stop-skipping. Using data from Beijing Yizhuang Metro Line, the study demonstrated the potential for optimisation algorithms to restore service performance more effectively than conventional disruption management approaches. Such findings indicate that advanced scheduling methods could enhance operational resilience and reduce the impacts of disruption on passengers.
Energy efficiency has become another important focus of timetable optimisation research, particularly as metro operators seek to reduce operating costs and contribute to sustainability objectives. Studies have shown that train departure times, dwell times, and operating patterns can significantly influence energy consumption. [8] developed an energy-optimal timetable for Shanghai Metro Line 8 that maximised the utilisation of regenerative braking energy and achieved energy savings of between 20.93% and 28.68%. Similarly, [9] reported reductions in traction energy consumption through the integrated optimisation of train control strategies and timetable design. These studies collectively suggest that timetable optimisation can provide measurable environmental and economic benefits without requiring substantial physical infrastructure upgrades.
Recent research has also highlighted the growing role of artificial intelligence and real-time decision support systems in metro operations. [10] applied recurrent neural network techniques to optimise metro operations based on dynamically changing passenger demand and train operating conditions. Their model was capable of generating near real-time recommendations and achieved operational efficiency improvements ranging from 7% to 14%. Such developments suggest that future metro timetables may become increasingly adaptive, moving beyond conventional fixed schedules towards dynamic operational management.
Taken together, the literature demonstrates that timetable optimisation can potentially deliver a wide range of benefits, including reduced passenger waiting times, improved capacity utilisation, alleviated congestion, enhanced disruption recovery, better inter and intramodal integration, lower operating costs, improved fleet efficiency, and reduced energy consumption. Importantly, many of these results were obtained using datasets derived from actual metro systems, including networks in Beijing, Shanghai, Chongqing, and Seoul, providing evidence that the proposed optimisation approaches are grounded in real operational environments.
Despite the substantial benefits reported in the literature, evidence of widespread implementation of advanced timetable optimisation by metro operators remains limited. One notable exception is the railway dispatching system described by [11] in Norway and Sweden, where optimisation algorithms were integrated into a real-time operational environment. However, this application related to mainline railway operations rather than an urban metro system. The study also highlighted several practical barriers to implementation, including integration with existing operational systems, real-time data availability, organisational acceptance, and the continued need for human oversight and decision-making.
2.2. Key Findings and Practical Challenges
Collectively, the studies summarised in Table 1 demonstrate that timetable optimisation has significant potential to improve metro system performance across a range of operational, passenger, and sustainability objectives. Across the reviewed studies, reported improvements include reductions in passenger waiting times of up to 40%, energy savings approaching 30%, reductions in fleet utilisation, lower operating costs, and enhanced disruption recovery capabilities. Such findings indicate that timetable optimisation has the potential to deliver substantial benefits without requiring major infrastructure investment.
A notable observation is that passenger-oriented performance improvements dominate the relevant previous research works. Studies by Guo et al. [1], Huang et al. [2], and Wu and Yang [3] primarily focus on reducing passenger waiting times and crowd management. The consistently positive results demonstrate the effectiveness of adjusting train frequencies, dwell times, and departure schedules to better match passenger demand. This reflects that service quality and customer satisfaction are key performance indicators towards urban rail operations.
The literature also highlights growing interest in resource efficiency and sustainability. Studies focusing on energy-efficient timetabling demonstrate that relatively small adjustments to train movements and control strategies can generate significant energy savings. [8,9] show that timetable optimisation can improve the utilisation of regenerative braking systems and train coasting strategies, leading to measurable reductions in traction energy consumption. This is particularly relevant given increasing pressure on metro operators to reduce both operating costs and carbon emissions. Nevertheless, energy optimisation studies often assume the availability of advanced train control systems and high-quality operational data, conditions that may not be present across all metro networks.
Another important trend is the transition from static planning towards dynamic and adaptive operational decision making. Research by [7,10,11] demonstrates the potential of real-time optimisation frameworks that continuously update operational recommendations in response to changing system conditions. The incorporation of machine learning and artificial intelligence techniques further reflects the increasing availability of operational data and computational resources. While these studies suggest considerable promise, they also highlight practical implementation challenges, including integration with existing control systems, computational requirements, and the need for operator acceptance and oversight.
Despite the encouraging findings reported throughout the literature, a significant limitation is the lack of evidence demonstrating widespread adoption by metro operators. Many studies report performance improvements under ideal or controlled conditions, making direct comparison between studies difficult. The use of different datasets, objective functions, optimisation techniques, and performance measures limits the generalisability of findings across networks. A timetable optimisation framework that performs well on a heavily congested metro line in Beijing may not necessarily produce similar benefits in a smaller European metro system with different demand characteristics. Consequently, caution is required when interpreting reported performance gains.
Another limitation is the predominance of network-level optimisation studies. Most research focuses on line-based or system-wide scheduling problems involving headways, train frequencies, rolling stock allocation, and network coordination. Relatively little attention has been devoted to station-level operations, where many service quality issues actually manifest. Factors such as platform crowding, passenger boarding and alighting processes, dwell time variability, train dispatching decisions, and local demand fluctuations can significantly influence overall timetable performance. This creates an important gap, particularly for metro operators seeking practical and scalable optimisation approaches that can be implemented incrementally rather than requiring whole-network transformation.
Whilst network-wide timetable optimisation aims to maximise overall operational efficiency, it often assumes that system-wide benefits outweigh localised impacts. In practice, however, the consequences of timetable decisions are experienced most directly at individual stations through changes in passenger waiting times, platform crowding, boarding efficiency, and service reliability. Stations that function as major interchange hubs, demand generators, or critical network nodes may be disproportionately affected by timetable decisions that are optimal from a network perspective but suboptimal locally. Furthermore, exceptional operating conditions, such as major events, service disruptions, or abnormal passenger demand, may require timetable strategies that prioritise the needs of a particular station over wider network objectives. Despite this practical challenge, the existing literature provides limited attention to timetable optimisation from a station-centric perspective. To address this gap, the present study develops a scenario-based simulation and optimisation framework to investigate how train frequency and dwell time can be adjusted to improve individual station performance and to evaluate the resulting trade-offs between local and system-wide operational objectives
Overall, the literature provides strong evidence that timetable optimisation can theoretically improve passenger service, operational efficiency, resilience, and sustainability. However, the gap between academic research and operational implementation remains substantial. Whilst optimisation models consistently demonstrate promising results using real-world datasets, there is limited evidence that such methods have been routinely adopted in live metro operations. This suggests that future research should focus not only on improving optimisation techniques but also on developing practical, transparent, and implementable frameworks that can be integrated into existing operational planning processes. In this context, a scenario-based simulation and optimisation approach at the individual station level offers a valuable opportunity to examine how advanced timetable optimisation methods may support real-world operational decision making while addressing a currently under-researched area within the literature.
2.3. Implications for the Present Study
The reviewed literature demonstrates that advanced timetable optimisation has considerable potential to enhance metro system performance. Across a wide range of applications, including passenger waiting time reduction, crowding mitigation, disruption recovery, fleet utilisation, energy efficiency, and rolling stock scheduling, optimisation models consistently report positive outcomes when tested using operational data obtained from real metro systems. These findings suggest that metro timetable performance can be significantly improved through more sophisticated, data-driven approaches than those traditionally employed in timetable planning.
However, several important limitations within the existing literature justify further investigation. First, the majority of studies focus on network-wide or line-based optimisation problems, where the primary decision variables include train frequencies, headways, running times, rolling stock allocations, and service patterns. Whilst such studies provide valuable strategic insights, they often overlook the operational realities experienced at individual stations. In practice, station-level factors such as passenger arrivals, platform crowding, train dwell times, passenger boarding and alighting behaviour, and local service interactions can have a significant influence on overall timetable performance and service reliability.
Second, most of the reviewed studies rely on mathematical optimisation frameworks that evaluate performance through computational modelling rather than operational implementation. Although many studies utilise datasets from real metro operators, the resulting performance improvements remain largely theoretical. Consequently, there remains limited evidence regarding how such optimisation approaches would perform under realistic operational conditions where passenger demand, train movements, and dwell times interact dynamically over time. This creates a gap between the theoretical benefits reported in the literature and the practical challenges faced by metro operators.
Third, despite the increasing complexity of optimisation techniques, including mixed-integer programming, metaheuristics, and artificial intelligence approaches, there is relatively limited research examining how these methods can support operational decision-making at an individual station level. Since stations represent the interface between passengers and train operations, understanding how timetable changes affect station performance is critical. Improvements in train headways and dwell time management may be expected to reduce passenger waiting times and platform congestion, but these impacts are rarely evaluated through detailed station-level simulation.
The literature therefore suggests a need for a complementary research approach that bridges the gap between network-level optimisation and operational reality. Rather than attempting to optimise an entire metro network, the present study focuses on a single metro station as the unit of analysis. This enables a more detailed examination of passenger demand, train movements, dwell times, platform occupancy, and service frequency under different operational scenarios. Through scenario-based simulation and optimisation, the study seeks to evaluate how timetable modifications influence station performance and whether the benefits reported in previous optimisation studies can be realised within a realistic operational environment.
Furthermore, the strong emphasis within the literature on reducing passenger waiting times provides a direct foundation for the present research. Passenger waiting time was identified as one of the most consistently improved performance indicators across the reviewed studies, with reported reductions ranging from approximately 15% to 40%. Similarly, studies focusing on crowding, capacity allocation, and dwell time optimisation demonstrate that relatively minor timetable adjustments can lead to substantial operational improvements. These findings support the selection of key performance indicators within the present study, including passenger waiting times, service frequency, and dwell time performance.
Finally, the literature highlights a persistent gap between optimisation theory and implementation. Whilst advanced timetable optimisation has demonstrated significant potential, there is little evidence of widespread deployment by metro operators. By combining simulation modelling with timetable optimisation at the station level, this study contributes to bridging this gap by providing a practical and operationally focused assessment of how timetable changes may affect real-world metro operations. In doing so, the research extends existing knowledge beyond purely mathematical optimisation and towards a more implementation-oriented understanding of metro timetable improvement.
In particular, whilst previous studies have demonstrated the theoretical benefits of metro timetable optimisation using real-world operational datasets, most have focused on network-level optimisation problems and limited practical implementation has been reported by metro operators. This study addresses this gap through the development of a scenario-based simulation and optimisation framework for an individual metro station, providing a detailed assessment of how timetable parameters such as headways and dwell times influence passenger and operational performance under realistic operating conditions.
3. Overall Study Methodology
As mentioned, this study adopts a scenario-based simulation and optimisation approach to model passenger and train movements within an individual metro station. The aim of this parameter optimisation is to enable the metro services to meet the dynamic growing passenger demands. The overall study methodology and optimisation approach is illustrated in Figure 1.
An agent-based discrete-event simulation model of metro station operations is first developed in Simul8 and validated using observed passenger flow data. The validated model is then used to evaluate station performance under a series of carefully designed operational scenarios that vary key service parameters, including train headways and dwell times. The outputs from these simulation experiments are subsequently used to support the development of a two-stage mixed-integer linear programming (MILP) optimisation framework aimed at improving the efficiency, reliability, and flexibility of metro operations.
In Stage 1, simulation experiments are conducted to quantify the relationships between operational parameters and key station performance indicators, particularly passenger waiting times and queue lengths. These relationships are then represented through regression-based objective functions that form the basis of the optimisation model. In Stage 2, the resulting MILP model is solved using the simplex algorithm to identify optimal combinations of train headways and dwell times whilst satisfying practical operational constraints specified by metro operators, including feasible parameter ranges and desired performance targets. The framework is applied using the operators-provided real-world operational and passenger demand data under both current and future demand conditions. By explicitly incorporating operators’ practical considerations (including operational constraints, service planning objectives, and realistic demand scenarios), the proposed approach enhances the practicality and implementability of the resulting timetable improvement recommendations.
3.1. Background of the Selected Cases
The above mentioned overall research methodology was applied individually to optimise metro service operations at a station level for the two use cases identified in Genoa in Italy (i.e. De Ferrari Station of the AMT metro system) and Sofia in Bulgaria (i.e. Serdica Station of the MetroS system).
AMT is a light rapid transit system serving the city of Genoa. Currently, the network consists of a single line, running for approximately 7.1 kilometres and comprising 8 stations. The line runs primarily underground and connects the Brin station in the north-western suburbs to Brignole station. De Ferrari Station is one of the busiest and is strategically located in the historical and administrative centre of the city. The station is structured on three underground levels. The ticketing and access level, which connects to the surrounding pedestrian areas via multiple entrances. An intermediate level, where people split in two different flows based on the destination they aim to reach. The platform level, which includes a central island platform serving both directions.
MetroS is one of the most modern and rapidly expanding urban transport systems in Eastern Europe. It currently consists of four operational lines (M1, M2, M3, and M4), covering over 52 kilometres and including approximately 47 stations. The Serdica Station represents a complex multi-line interchange hub connecting Line 1 and Line 2. The station is structured on three underground levels The upper level contains entrances, commercial spaces, and access points from street level. The middle level serves two partially overlapping Lines 1 and 4, with two side platforms for opposite directions. The lower level serves Line 2, which is aligned orthogonally to Line 1 and 4, with a central platform. Multiple vertical circulation elements (including escalators, elevators, and staircases) connect the levels, enabling passenger transfer between lines. Interconnecting corridors between platforms are designed to manage large passenger flows. Table 2 summarises some basic contextual data of the two selected cases.
3.2. Metro Station Simulation Modelling
The approach for modelling the metro station has been designed to realistically capture the dynamic interactions between passengers and train operations in station environments. Since the focus of this paper is station service operation optimisation, the development and validation of the metro station simulation models are only briefly described here. In short, the overall station simulation model development framework is illustrated in Figure 2. The movement and interactions of passenger and train agents are simulated through a series of phases and actions that represent the real-world passenger journey inside the station. These typical phases include:
- Entry Phase, passengers enter the station via entry gates, considering possible constraints such as ticket validation and security checks.
- Circulation Phase, Passengers navigate through corridors, concourses, and vertical connections (e.g., stairs, escalators, elevators) to reach the platform level. Routing decisions are influenced by factors like shortest path, crowd density, and personal walking speed.
- Platform Waiting Phase, passengers wait on the platform for the next arriving train. Waiting behaviour can vary depending on train arrival times, expected occupancy, and passenger preferences for carriage doors or car positions.
- Boarding and Alighting Phase, the boarding and alighting process is simulated in detail, including door opening, passenger exchange, and any queuing effects at doors when a train arrives.
- Exit Phase, upon alighting, passengers circulate to exit the station or transfer to another line. This phase again includes vertical circulation elements and fare gate passage.
Throughout these phases, passengers and trains interact with the physical station environment, modelled with realistic spatial constraints and capacities for:
- Platforms, which can experience crowding and bottlenecks.
- Queues for ticketing, security or ticket validations where relevant.
- Escalators, stairways and lifts, which affect movement speeds and congestion patterns.
A hybrid simulation method combining agent-based modelling (ABM) and discrete-event simulation (DES) has been adopted. This integrated approach leverages the strengths of both techniques:
- DES is used to model time-dependent, event-driven processes such as train arrivals, dwell times, and departures, which help speed up computational efficiency;
- ABM enables the representation of individual passenger behaviours, including entry and exit patterns, route choice within the station, queuing, and boarding/alighting activities.
Within this framework, two primary types of agents are defined:
- Passenger agents, representing individual travellers with attributes such as arrival time, destination, ticket type, and walking speed.
- Train agents, representing incoming and outgoing metro services, each governed by operational parameters such as timetable, train capacity, dwell time at platforms, and headway.
The interaction between passenger agents and train agents occurs in a spatially explicit station layout, where facilities like platforms, concourses, ticketing areas, escalators, and stairs are modelled with physical constraints and capacities. Passenger flow within the station is simulated to account for crowd dynamics, platform congestion, and bottlenecks, providing key insights into station performance under various scenarios.
This hybrid DES–ABM modelling structure ensures that both macro-level system processes and micro-level passenger decision-making are captured consistently. It allows scenario testing under different operating conditions, including peak demand, service disruptions, and emergency situations, supporting the broader adaptability and optimisation goals. This structure also enables the simulation to capture emergent phenomena such as crowd build-up, platform congestion, missed trains due to overcrowding, and the ripple effects of delays. This detailed, phased modelling approach provides robust insights for testing different operational scenarios, designing station layouts, and optimising passenger flow management strategies.
In terms of model verification and validation, the number of observed and simulated inbound, outbound, and transfer passengers are compared. A three-layer checking process is employed within the Simul8 simulation environment. First, a structured walkthrough will be undertaken for each Simul8 model developed to check that the correct input parameters, data, assumptions, and more importantly the logics have been properly and accurately encoded. The model setup will be checked against the conceptual model specifications. Secondly, the run-time animation features in Simul8 provide a powerful tool in aiding understanding of model behaviours and enabling a detailed visualisation and observation of the flow of every entity in the simulation system. To check the logic of the developed models, model runs will be conducted slowly (with on-screen animations) to visually examine how each element of the model behaved. Finally, a trace analysis is carried out using the “Monitor Simulation” feature in Simul8 where each single “Work Items” in the model could be traced for their movements, routes and actions taken within the simulation system. This helps verifying every process of the model was run properly as expected.
The above-mentioned three-layer checking process has confirmed that the Simul8 model runs have performed very well and the on-screen animations have also shown logical movements of the simulated trains and passengers. This reflects that, visually, the models satisfactorily replicate the real-world operations of the two metro systems. More details on the model development process and statistical outputs from the validation exercises could be found in a separate paper by the authors [12].
4. Formulation of the Two-Stage Optimisation Model
4.1. Optimisation Objectives (or Performance Objectives)
Using the validated Simul8 metro station simulation models, the optimisation focuses on two performance metrics:
- Average Waiting Time – the time passengers spent on waiting for a train to come and get on board. Technically, it is the difference between the time a passenger arrives and joins the queue at platform until the point s/he gets on board of the train.
- Average Queue Length – the total number of passengers waiting at the platform when a train arrives for boarding
Information on the desirable average waiting time and average queue length values are collected from the two operators, and are served as the target for optimisation. Table 2 summarises the operator’s preferred values of these two metrics for the De Ferrari station and together with the simulated system performance under current operational conditions. It is clear that the average queue length as indicated in Table 2 are basically well under the operator’s desired average queue length whilst the current average waiting time will need to be minimised toward the desirable values.
Table 2.
Current System Performance and Target Performance Values (De Ferrari).
| To Brin Direction | To Brignole Direction | |||
|---|---|---|---|---|
| Time Period | Ave. Waiting Time | Ave. Queue Length | Ave. Waiting Time | Ave. Queue Length |
| 05:00 - 07:00 | 2.1 | 0.4 | 2.0 | 0.1 |
| 07:00 - 10:00 | 4.5 | 4.0 | 2.1 | 0.5 |
| 10:00 - 16:00 | 8.1 | 24.4 | 2.6 | 2.4 |
| 16:00 - 20:00 | 8.9 | 40.0 | 4.2 | 9.7 |
| 20:00 - 24:00 | 4.0 | 7.5 | 6.5 | 1.7 |
| Target | 1.5 | 50 | 1.5 | 50 |
Therefore, the Average Waiting Time is set as the optimisation objective, aiming at minimising it towards the desirable values (i.e. 1.5 minutes) through adjusting the decision variables. For the Serdica station, the operator’s preferred average waiting time is around half of the train headways within the specific time period being measured. Whilst average waiting time is set as the optimisation objective, average queue length will still be monitored to ensure its compliance with the operators’ preferred values.
4.2. Decision Variables
This study will focus on two decision variables, which aim at changing their values to improve metro service performances from an individual station’s perspective:
- Service frequency (or train headways) – how frequent train services should be scheduled, which will be expressed in the form of headways (i.e. the inter-arrival times of consecutive trains at a station platform). In general, shorter headways (i.e. higher service frequency) contributes to better passenger services, however, requires more resources and thus higher operating costs;
- Dwell Time – the time a train spent stopping at the platform for passengers to get on and off of the train. Should there be sufficient train capacities, increasing dwell time mainly contributes to more efficiently discharging passenger queuing at platforms with relatively less operating cost implications.
Different combinations of values of these two variables essentially mean that different train service timetables will be created. Therefore, train services will be able to determine in a way to match the passenger demand volume and its dynamic variations over the day.
Intuitively, higher service frequency (i.e. shorter headways between train arrivals) and longer dwell time would contribute to better service levels in the form of reduced average waiting time and average queue length. When two or more combinations of service frequency and dwell time provide the same KPI (e.g. average waiting time), the one with longer headway should be recommended due to cost implications discussed above.
4.3. Optimisation Approach
A two-stage optimisation framework to determine the optimal combination of train service frequency and dwell time that minimises average waiting time. The operators’ preferred values of average waiting time at De Ferrari and Serdica stations will be the optimisation objective. A Solution to this optimisation problem is defined as a combination of train service frequency and dwell time for a specific time period. A typical day of metro operation is divided into 5 periods, namely, Early Morning (05:00-07:00), Morning Peak (07:00-10:00), Inter-Peak (10:00-16:00), Afternoon Peak (16:00-20:00), and Late Afternoon (20:00-24:00). The following two-stage process will then be followed for each of these five time periods on a line-by-line and direction-by-direction basis.
4.3.1. Stage 1 – Developing Objective Functions and Solution Sets
In Stage 1, simulation experiments are carried out for different possible solutions (i.e. combinations of train service frequencies and dwell times) to determine their impacts on the optimisation objective (i.e. average waiting time). The goal is to establish, through simulation experiments, a formal relationship between a solution and the optimisation objective. To do so, the following process is implemented:
- Obtain operators’ inputs on the practical ranges of service frequency and dwell time (summarised in Table 3). These ranges will be served as the boundary values for generating solution sets which form the solution space of the optimisation problem.
- Create solutions sets (i.e. combinations of values for the two decision variables) for each time period with due considerations to the existing service frequency and dwell time settings. Each decision variable is divided into 3 levels, hence 9 solution sets (i.e. 3 service frequencies x 3 dwell time values) are created for each time period.
- Implement simulation experiments using the Simul8 metro station simulation models to evaluate the impact of each solution set created in Step 2 on average waiting time. For each simulation experiment, 5 simulation trials of the same setting with different random seeds would be conducted and the results are then averaged to become the final model outputs.
- For each time period, uses multiple linear regression to develop a formal relationship between the simulated average waiting time from Step 3 (as dependent variable, WTi) and the corresponding service frequency and dwell time solution set (Hi, Di) from Step 2 (as independent variables). This means that a multiple linear regression equation (equ. 1) is fitted using the results of the simulation experiments in Step 3.
The rationale for adopting such approach is to reduce the time required to carry out the extensive and time-consuming simulation runs. The values set for the 3 levels of service frequency (alongside the values extracted from the existing train service timetables) are summarised in Table 4 and Table 5 for De Ferrari and Serdica respectively. In general, higher service frequencies (i.e. shorter headways) are adopted during the two peak periods whilst non-peaks would be evaluated using longer headways. This is generally consistent with the existing service operation parameter settings.
As for the dwell time, the existing operation is assumed to be operating at fixed values of 22 and 35 seconds for De Ferrari and Serdica, respectively. With references to these existing dwell time settings, the 3 dwell time values set for simulation experiments were 15, 30 and 40 for De Ferrari, and 20, 30 and 40 for Serdica. Hence, 9 solution sets (i.e. combinations of service frequency and dwell time) are created for simulation experiments as described in Step 3 above. This ensures that the simulation experiments would cover the range required for establishing a reliable relationship between average waiting time and the two decision variables.
4.3.2. Stage 2 – Mixed Integer Linear Programming Optimisation
In Stage 2, as summarised below, a MILP optimisation model is formulated (for each time period) using the fitted linear regression equations obtained in Stage 1 as the objective function, and the practical ranges of service frequency and dwell time, as advised by the two metro operators, being the constraints. The generalised form of the MILP optimisation model can be summarised as follows:
Minimise:
Subject to:
where WTi is the objective function of the MILP model, which aims at minimising the average waiting time (in minute) for period i (representing each time period of the day) expressed as a linear combination of the two decision variables train service frequency (Hi in minutes) and dwell time (Di, in seconds). β0, β1 and β2 are the fitted multiple linear regression coefficients obtained from Stage 1 Step 3, reflecting the effect of the two decision variables on the average waiting time for time period i.
(Constraint 1: practical range of headway, in minute)
(Constraint 2: practical range of dwell time, in second)
(Constraint 3: average waiting time target, in minute)
The first two constraints are to make sure that the optimal service frequency and dwell time for each time period will be within the operators’ advised practical ranges. Constraint 3 is to guide the minimisation model towards the operators’ preferred value of average waiting time for the time period i concerned.
To solve the MILP problem, the LP Solver module in MS Excel is used to search for the solution(s) that give an objective function values to within 0.01 minute of the operators’ preferred target average waiting time for each specific optimisation scenario (defined by the time period, metro line, and direction). The solution algorithm will first look for integer solutions (i.e. to find an integer combination of the two decision variables that minimises the objective function towards the target values as an optimal solution). If it fails, the integer restriction on service frequency will be relaxed (i.e. allow the headway (in minute) to be expressed as values of up to 1 decimal place, which could then be converted back to second, as an integer.).
Effectively, the LP Solver module will search through all the possible combinations of service frequency and dwell time within the solution space (defined by the practical ranges specified in Constraints 1 and 2). In some cases, more than one solution might be found (i.e. there might be more than one combination of service frequency and dwell time satisfying all the three constraints, and they are all within the practical ranges of service frequency and dwell time that result in an average waiting time within 0.01 minute of the target value). As described earlier, in such cases, the solution with longer headway (i.e. lower service frequency) would be recommended as the optimal solution due to lower train resources requirements.
5. Case Simulation and Optimisation Results
This section describes the implementation and results of the station service optimisation approach explained in Section 4.
5.1. Objective Functions
The results of calibrating the multiple linear regression models (to be used as objective functions of the MILP problem) are shown in Table 6 for De Ferrari, and Table 7 to Table 9 for Serdica. The revealed impacts of the two decision variables on passenger waiting time as well as the goodness-of-fit results are generally consistent across the two stations for the five time periods of day.
5.1.1. Model Significance and Goodness-of-Fit
Goodness-of-fit in this case means that how much variations in the average waiting time could be explained by the fitted multiple linear regression models (with headway and dwell time being the explanatory variables). This is reflected in the coefficients of determinations (r2) values. Higher values of r2 (close to 1) indicates a better fit of the model. For example, r2 = 0.996 revealed for the late afternoon period 20:00 – 24:00 at De Ferrari station towards Brignole’s direction (in Table 6) means that 99.6% of the variations in average waiting times can be explained by the fitted linear regression model. This represents an extremely good model fit. As summarised in Table 7 to Table 9, a majority of the fitted models has achieved a r2 value of 0.9 or above (with a few fluctuating between 0.8 to 0.9), which are considered to be a very good model fit.
Model Significance means whether the fitted regression equations between average waiting time and the two decision variables (headway and dwell time) are statistically meaningful. Specifically, it tests whether the explanatory power of the regression model as a whole could have arisen by chance. It is reflected in the p-value of the F-statistics. A p-value below 0.05 means that the model is significant at 5% level of significance. As shown in Table 6 to Table 9, the models are all significant at 5% level of significance except some of the cases during the early morning period. These results are basically consistent with the observations reflected in the (r2) goodness-of-fit results.
Table 6.
Multiple Linear Regression Results (De Ferrari).
| Time Period | To Brin Direction | To Brignole Direction | ||||||
|---|---|---|---|---|---|---|---|---|
| β1 | β2 | r2 | p-value of the F-statistics | β1 | β2 | r2 | p-value of the F-statistics | |
| 05:00 - 07:00 | 0.063* | -0.014 | 0.811 | 0.0067* | 0.000* | -0.016 | 0.029 | 0.9160 |
| 07:00 - 10:00 | 0.713* | -0.027 | 0.939 | 0.0002* | 0.575* | -0.016 | 0.927 | 0.0004* |
| 10:00 - 16:00 | 0.654* | -0.121* | 0.834 | 0.0045* | 0.428* | -0.017 | 0.799 | 0.0045* |
| 16:00 - 20:00 | 0.937* | -0.158* | 0.906 | 0.0008* | 0.550* | -0.048* | 0.867 | 0.0023* |
| 20:00 - 24:00 | 1.097* | -0.019 | 0.987 | 0.0000* | 0.880* | -0.019 | 0.996 | 0.0082* |
Note: * significant at 95% level or above.
Table 7.
Multiple Linear Regression Results (Line 2, Serdica).
| Time Period | To Vitosha Direction | To Obelya Direction | ||||||
|---|---|---|---|---|---|---|---|---|
| β1 | β2 | r2 | p-value of the F-statistics | β1 | β2 | r2 | p-value of the F-statistics | |
| 05:00 - 07:00 | 0.381* | -0.013 | 0.921 | 0.0005* | 0.180* | -0.010 | 0.380 | 0.2380 |
| 07:00 - 10:00 | 0.524* | -0.015* | 0.975 | 0.0000* | 0.500* | -0.013* | 0.980 | 0.0000* |
| 10:00 - 16:00 | 0.504* | -0.018* | 0.969 | 0.0000* | 0.475* | -0.015 | 0.949 | 0.0001* |
| 16:00 - 20:00 | 0.634* | -0.018* | 0.991 | 0.0000* | 0.517* | -0.015* | 0.982 | 0.0000* |
| 20:00 - 24:00 | 0.500* | -0.017 | 0.948 | 0.0001* | 0.496* | -0.015 | 0.966 | 0.0000* |
Note: * significant at 95% level or above.
Table 8.
Multiple Linear Regression Results (Line 1, Serdica).
| Time Period | To Slivnitsa (Direction) | To Business Park (Direction) | ||||||
|---|---|---|---|---|---|---|---|---|
| β1 | β2 | r2 | p-value of the F-statistics | β1 | β2 | r2 | p-value of the F-statistics | |
| 05:00 - 07:00 | 0.175* | -0.015 | 0.577 | 0.0759** | 0.792* | -0.013 | 0.978 | 0.0000* |
| 07:00 - 10:00 | 0.783* | -0.012* | 0.990 | 0.0000* | 0.667* | -0.020* | 0.977 | 0.0000* |
| 10:00 - 16:00 | 0.396* | -0.012 | 0.777 | 0.0110* | 0.396* | -0.013 | 0.937 | 0.0003* |
| 16:00 - 20:00 | 0.600* | -0.018* | 0.889 | 0.0014* | 0.600* | -0.018* | 0.923 | 0.0005* |
| 20:00 - 24:00 | 0.388* | -0.023 | 0.921 | 0.0005* | 0.318* | -0.025 | 0.896 | 0.0011* |
Note: * significant at 95% level or above; ** significant at 90% level of above.
Table 9.
Multiple Linear Regression Results (Line 4, Serdica).
| Time Period | To Obelya (Direction) | To Sofia Airport (Direction) | ||||||
|---|---|---|---|---|---|---|---|---|
| β1 | β2 | r2 | p-value of the F-statistics | β1 | β2 | r2 | p-value of the F-statistics | |
| 05:00 - 07:00 | 0.572* | -0.012 | 0.845 | 0.0037* | 0.427* | -0.028 | 0.758 | 0.0141* |
| 07:00 - 10:00 | 0.617* | -0.015* | 0.992 | 0.0000* | 0.583* | -0.010* | 0.991 | 0.0000* |
| 10:00 - 16:00 | 0.683* | -0.017 | 0.913 | 0.0007* | 0.590* | -0.027 | 0.941 | 0.0002* |
| 16:00 - 20:00 | 0.683* | -0.012 | 0.868 | 0.0022* | 0.700* | -0.015* | 0.956 | 0.0000* |
| 20:00 - 24:00 | 0.516* | -0.005 | 0.975 | 0.0000* | 0.585* | -0.017* | 0.991 | 0.0000* |
Note: * significant at 95% level or above.
5.1.2. Significance and Impact of Decision Variables on Passenger Waiting Time
As reflected in the model coefficient β1, a positive effect is revealed for headway on passenger waiting time. The effect is statistically significant at 5% level of significance, which indicates that headway is a key determinant affecting passenger waiting time. In particular, it means that longer train headways would result in increased passenger waiting time. In general, passenger waiting time would be reduced by at least half a minute due to a 1-minute decrease in train headway (i.e. more frequent services). For example, β1 = 0.937 revealed for the afternoon peak period 16:00 – 20:00 at De Ferrari station towards Brin’s direction (in Table 6) means that during this period, passenger waiting time would be reduced by 0.937 minute, on average, for each 1-minute reduction in headway.
On the other hand, as reflected in the model coefficient β2, a negative impact can be observed for dwell time on passenger waiting time. It means that extended dwell time would be helpful in reducing passenger waiting time. However, the magnitude of the impact is less significant than that of the headway. It is also reflected in the significance test for individual model coefficient, where it is revealed that the coefficient β2 for models fitted outside the peak periods are insignificant. However, when passenger demand is relatively higher (e.g. during peaks), the impact of extending dwell time might be more significant to help reducing passenger waiting time. For example, β2 = −0.048 revealed for the afternoon peak period 16:00 – 20:00 at De Ferrari station towards Brignole’s direction (in Table 6) means that during this period, passenger waiting time could be reduced by 0.048 minute (about 3 seconds), on average, for each 1-second increases in dwell time. Obviously, the magnitude of this effect is not as significant as it is for changing headway.
5.1.3. Major Findings
This analysis developed relationships between the metro station optimisation objective (i.e. average waiting times) and the two decision variables (i.e. headway and dwell time) for each of the five periods across a typical day of metro operation. It has been shown that these relationships (as a whole) are generally statistically significant, and the impact and significance of individual decision variable are also evaluated. It was found that headway is the key determinant (among the two decision variables examined) affecting average waiting times. These fitted regression equations will be adopted as the objective functions of the MILP optimisation models in Stage 2 optimisation.
Whilst passenger-train interactions are commonly recognised as highly complicated at the network level, their representation may be simplified when the scope is focus on a single station. At the line or network scale, passenger demand, train movements, capacity allocation, and operational disturbances interact across multiple locations, creating complex and often non-linear system dynamics. In contrast, station-level operations are influenced more directly by local timetable characteristics, particularly train frequency and dwell time. In particular, it has been shown that train headways have direct significant impact on passenger waiting time [12]. The results of the present study further demonstrate that a multiple linear regression formulation is capable of representing these relationships with a satisfactory degree of accuracy, as evidenced by the model fit statistics and the statistical significance of the regression coefficients. This suggests that the dominant effects of timetable adjustments on passenger waiting time can be captured through a comparatively simple analytical framework. Furthermore, the study provides one of the first quantitative assessments of the relationship between headway and dwell-time adjustments and passenger waiting time at the individual station level. This linear approximation also offers transparency, ease of interpretation, and practical applicability for operational decision-making.
5.2. Metro Station MILP Optimisation Results
5.2.1. MILP Optimisation Model Formulation
For each of the five periods of day mentioned earlier, a MILP optimisation model is formulated as described in Section 4.3.2 using the regression results calibrated in Section 5.1 (including all the fitted regression coefficients). This is to reflect the effect of the two decision variables on the average waiting time for time period i. The boundary values of Constraints 1 and 2 are summarised in Table 3. The target optimisation values () to be used in Constraint 3 for the Serdica station are summarised in Table 10, which are determined as half of the existing train headway (as informed by the operator of MetroS). As for AMT, the target value of 1.5 minutes is used across the board for all cases at the De Ferrari station optimisation models whilst an average waiting time of less than 10 minutes would still be acceptable.
5.2.2. Optimisation Results
The optimal solutions through solving the MILP optimisation models formulated in Section 5.2.1 are summarised in Table 11 to Table 14. For the De Ferrari station (Table 11), an optimal solution meeting the operator’s target value (i.e. 1.5 minutes average waiting time) was unable to be found from the formulated MILP model for the early morning (05:00 – 07:00), morning peak (07:00-10:00), and later afternoon (20:00-24:00) periods. In those cases, an optimal solution was selected from the simulation experiment results that gave the closest simulated average waiting time value to the target (as described in Step 3 of Section 4.3.1). As a result, a solution that meet the operator’s target average waiting time was found for the early morning (05:00-07:00) and morning peak (07:00-10:00) periods. As for the late afternoon period (20:00-24:00), the optimal solution from simulation experiments gave a simulated average waiting time of 8.4 minutes which was still within the operator’s indicated acceptable range of less than 10 minutes.
Table 11.
Optimised Train Service Operation Solution (De Ferrari).
| Time Period | To Brin Direction | To Brignole Direction | ||||
|---|---|---|---|---|---|---|
| Optimal Solution (Hi, Di) | Optimal Solution (Hi, Di) | |||||
| 05:00 - 07:00 | 1.5 | 1.51 | (12.5, 40) | 1.5 | 1.50 | (15.0, 30) |
| 07:00 - 10:00 | 1.5 | 1.49 | (4.2, 36) | 1.5 | 1.50 | (3.0, 30) |
| 10:00 - 16:00 | 1.5 | 1.50 | (4.5, 35) | 1.5 | 1.49 | (3.4, 40) |
| 16:00 - 20:00 | 1.5 | 1.50 | (4.3, 38) | 1.5 | 1.50 | (3.0, 31) |
| 20:00 - 24:00 | 1.5 | 1.49 | (5.3, 40) | 1.5 | 8.40 | (10.0, 30) |
Table 12.
Optimised Train Service Operation Solutions (Line 2, Serdica).
| Time Period | To Vitosha Direction | To Obelya Direction | ||||
|---|---|---|---|---|---|---|
| Optimal Solution (Hi, Di) | Optimal Solution (Hi, Di) | |||||
| 05:00 - 07:00 | 4.5 | 4.49 | (13.0, 28) | 4.5 | 4.50 | (12.5, 38) |
| 07:00 - 10:00 | 3.0 | 3.00 | (6.5, 24) | 3.0 | 3.00 | (7.0, 31) |
| 10:00 - 16:00 | 4.5 | 4.49 | (10.5, 39) | 4.5 | 4.49 | (10.5, 30) |
| 16:00 - 20:00 | 3.5 | 3.51 | (7.0, 31) | 3.5 | 3.50 | (7.5, 29) |
| 20:00 - 24:00 | 6.0 | 6.01 | (13.5, 34) | 6.0 | 6.00 | (13.5, 31) |
Table 13.
Optimised Train Service Operation Solutions (Line 1, Serdica).
| Time Period | To Slivnitsa Direction | To Business Park Direction | ||||
|---|---|---|---|---|---|---|
| Optimal Solution (Hi, Di) | Optimal Solution (Hi, Di) | |||||
| 05:00 - 07:00 | 2.5 | 4.76 | (9.5, 11) | 2.5 | 2.49 | (5.5, 20) |
| 07:00 - 10:00 | 1.5 | 1.50 | (3.0, 10) | 1.5 | 1.49 | (3.5, 40) |
| 10:00 - 16:00 | 2.25 | 2.24 | (4.5, 28) | 2.25 | 2.25 | (6.0, 26) |
| 16:00 - 20:00 | 2.5 | 2.51 | (5.5, 40) | 2.5 | 2.50 | (6.0, 38) |
| 20:00 - 24:00 | 3.25 | 3.25 | (7.0, 38) | 3.25 | 3.25 | (7.0, 26) |
Table 14.
Optimised Train Service Operation Solutions (Line 4, Serdica).
| Time Period | To Obelya Direction | To Sofia Airport Direction | ||||
|---|---|---|---|---|---|---|
| Optimal Solution (Hi, Di) | Optimal Solution (Hi, Di) | |||||
| 05:00 - 07:00 | 2.5 | 2.49 | (3.0, 36) | 2.5 | 2.50 | (5.5, 38) |
| 07:00 - 10:00 | 1.5 | 1.50 | (3.5, 31) | 2.5 | 2.49 | (5.0, 32) |
| 10:00 - 16:00 | 2.25 | 2.26 | (6.0, 29) | 2.25 | 2.25 | (5.0, 34) |
| 16:00 - 20:00 | 2.5 | 2.49 | (5.5, 36) | 2.5 | 2.49 | (5.0, 32) |
| 20:00 - 24:00 | 3.25 | 3.24 | (7.0, 26) | 3.25 | 3.24 | (7.0, 32) |
For the Serdica station, an optimal solution meeting the operator’s target value (i.e. half of the current headway as summarised in Table 10) was successfully found from the formulated MILP model for all cases except the for early morning period (05:00-07:00) of Line 1 towards the Slivnitsa direction. In that case, the target average waiting time was adjusted to half of the headway as determined in the optimal solution (rather than half of the current headway for this time period). As a result, the solution (9.5, 11) was found for this case which gave an estimated average waiting time of 4.76 (which is about half of the headway). This estimated average waiting time (4.76 minutes) was still within the practical range suggested by the operator.
5.3. Evaluation of Optimal Solutions
The optimal solutions (i.e. the headway and dwell time combinations) determined for each time period was incorporated into the Simul8 baseline metro simulation model to simulate their impacts on the metro stations’ operation. It is noted that the estimated average waiting time from the MILP optimisation model (i.e. the numbers highlighted in red from Table 11 to Table 14, which have been calculated from the objective function equations described in Section 5.2.1 for optimisation purposes) might not necessarily be the same as the simulated average waiting time from the Simul8 station simulation models (i.e. the results of conducting a simulation experiment as described in Step 3 of Section 4.3.1 using the determined optimal solutions). So, it is important to check if the optimal solutions will be able to deliver (within the simulation platform) the optimisation target (i.e. meeting the average waiting time target values shown in Table 10 for Serdica, and 1.5 minutes for De Ferrari), as well as how does it compare to the baseline operational parameters in achieving these optimisation targets.
Other simulated KPI results were also compared to those from the baseline scenarios. This comparison will include a total of three evaluation scenarios as described in Tabel 15. Comparison across simulation results from these scenarios will be able to reveal the effect of each optimisation element as well as in dealing with increased passenger demand in the future. With inputs from the two operators, it was agreed that a 25% increase over the current passenger demand would be a reasonable assumption to be tested as a possible future demand scenario. It is noted that the comparison between baseline (i.e. Scenario E) and optimal scenarios (i.e. Scenario O) would be carried out for all the five time periods of day. However, evaluations regarding the future passenger demand would focus on the afternoon peak period 16:00-20:00 only (i.e. Scenarios OF).
Table 15.
Station Optimal Solution Evaluation Scenarios.
| Evaluation Scenario | Service Parameters | Vehicle Concept | Passenger Demand | |
|---|---|---|---|---|
| Baseline | (E) | Existing | Existing | Existing |
| Optimal | (O) | Optimal | Existing | Existing |
| Optimal + Future Demand | (OF) | Optimal | Existing | Future (25% increase) |
5.3.1. Simulation Results of the Optimal Solutions
Simulation Results vs Optimisation Target
Table 16 summarises, for the De Ferrari station, the simulated average waiting time for the baseline and optimal scenarios (i.e. Scenarios E and O) comparing against the target average waiting time (i.e. 1.5 minutes). It shows that the optimal solutions have basically met the optimisation target in reducing the average waiting time towards 1.5 minutes (except the late afternoon period for both directions, and the early morning period for the To Brin direction). The relatively longer simulated average waiting time for the early morning and late afternoon periods are primarily due to the longer (but more realistic due to the lower passenger demand levels during these non-peak periods) train headway used in the optimal solutions. Though the results for these two non-peak periods were unable to meet the 1.5 minutes target, the simulated average waiting times are comparable to the baseline scenarios and more importantly are within the acceptable practical range suggested by the operator.
As for the Serdica station, the optimisation target was to achieve an average waiting time of about half of the train headway used for that particular time period. Table 17 to Table 19 show that most of the time the baseline scenarios were unable to achieve this target except for some of the time periods of Line 2. For Lines 1 and 4, the simulated baseline average waiting times (i.e. the numbers shown in red) were well above the targets. On the other hand, the optimal solutions have achieved much better results where most of the scenarios for all the three lines were able to provide an average waiting time (i.e. the numbers shown in green) less than half of the headways used for that particular time period.
Table 17.
Baseline and Optimal Scenarios vs Optimisation Target (Line 2, Serdica).
| Time Period | Average Waiting Time (To Vitosha) (in min) | Average Waiting Time (To Obelya) (in min) | ||||||
|---|---|---|---|---|---|---|---|---|
| Target (Baseline) |
Simulated (Baseline) | Target (Optimal) | Simulated (Optimal) | Target (Baseline) |
Simulated (Baseline) | Target (Optimal) | Simulated (Optimal) | |
| 05:00 – 07:00 | 4.5 | 3.5 | 6.25 | 5.9 | 4.5 | 7.5 | 6.50 | b |
| 07:00 – 10:00 | 3.0 | 2.7 | 3.25 | 2.9 | 3.0 | 3.3 | 3.50 | 3.0 |
| 10:00 - 16:00 | 4.5 | 3.5 | 5.25 | 4.7 | 4.5 | 3.6 | 5.25 | 4.8 |
| 16:00 - 20:00 | 3.5 | 3.3 | 3.50 | 3.1 | 3.5 | 3.5 | 3.75 | 3.4 |
| 20:00 - 24:00 | 6.0 | 4.0 | 6.75 | 5.8 | 6.0 | 4.1 | 6.75 | 6.2 |
Note 1: Target (Baseline) is half of the existing headway for the specific time period Note 2: Simulated (Baseline) is the simulated average waiting time using the baseline model settings Note 3: Target (Optimal) is half of the headway in the optimal solution for the specific time period Note 4: Simulated (Optimal) is the simulated average waiting time using the optimal solution settings.
Table 18.
Baseline and Optimal Scenarios vs Optimisation Target (Line 4, Serdica).
| Time Period | Average Waiting Time (To Obelya) (in min) | Average Waiting Time (To Sofia Airport) (in min) | ||||||
|---|---|---|---|---|---|---|---|---|
| Target (Baseline) |
Simulated (Baseline) | Target (Optimal) | Simulated (Optimal) | Target (Baseline) |
Simulated (Baseline) | Target (Optimal) | Simulated (Optimal) | |
| 05:00 - 07:00 | 2.5 | 6.8 | 1.50 | 2.9 | 2.50 | 3.3 | 2.75 | 2.1 |
| 07:00 - 10:00 | 1.5 | 2.7 | 1.75 | 1.2 | 1.50 | 1.9 | 2.50 | 2.0 |
| 10:00 - 16:00 | 2.25 | 3.2 | 3.00 | 2.5 | 2.25 | 4.5 | 2.50 | 2.0 |
| 16:00 - 20:00 | 2.5 | 3.0 | 2.75 | 2.2 | 2.50 | 3.5 | 2.50 | 2.0 |
| 20:00 - 24:00 | 3.25 | 4.9 | 3.50 | 3.0 | 3.25 | 5.5 | 3.50 | 3.0 |
Note 1: Target (Baseline) is half of the existing headway for the specific time period Note 2: Simulated (Baseline) is the simulated average waiting time using the baseline model settings Note 3: Target (Optimal) is half of the headway in the optimal solution for the specific time period Note 4: Simulated (Optimal) is the simulated average waiting time using the optimal solution settings.
Table 19.
Baseline and Optimal Scenarios vs Optimisation Target (Line 1, Serdica).
| Time Period | Average Waiting Time (To Slivnitsa) (min) | Average Waiting Time (To Business Park) (min) | ||||||
|---|---|---|---|---|---|---|---|---|
| Target (Baseline) |
Simulated (Baseline) | Target (Optimal) | Simulated (Optimal) | Target (Baseline) |
Simulated (Baseline) | Target (Optimal) | Simulated (Optimal) | |
| 05:00 - 07:00 | 2.5 | 6.8 | 4.75 | 5.8 | 2.50 | 6.5 | 2.75 | 2.5 |
| 07:00 - 10:00 | 1.5 | 3.6 | 1.50 | 1.4 | 1.50 | 3.6 | 1.75 | 1.1 |
| 10:00 - 16:00 | 2.25 | 4.3 | 2.25 | 1.8 | 2.25 | 4.0 | 3.00 | 2.6 |
| 16:00 - 20:00 | 2.5 | 3.8 | 2.75 | 2.1 | 2.50 | 2.9 | 3.00 | 2.4 |
| 20:00 - 24:00 | 3.25 | 3.5 | 3.50 | 3.0 | 3.25 | 5.0 | 3.50 | 3.3 |
Note 1: Target (Baseline) is half of the existing headway for the specific time period Note 2: Simulated (Baseline) is the simulated average waiting time using the baseline model settings Note 3: Target (Optimal) is half of the headway in the optimal solution for the specific time period Note 4: Simulated (Optimal) is the simulated average waiting time using the optimal solution settings.
Results on Other Simulated KPIs
Table 20 shows the wider set of KPIs from the simulation experiments using the optimal solutions (i.e. combinations of headway and dwell time for the five time periods of day) shown in Table 11 (for De Ferrari) and Table 12 to Table 14 (for Serdica). The numbers shown in parentheses are the percentage differences comparing the baseline scenario values. Table 20 shows that there are significant improvements in all the three KPIs monitored across all time periods for both directions at De Ferrari except for the To Brin direction during the early morning period where the average waiting time and average time in system are slightly higher than the baseline scenario for only 0.3 minute. The largest improvement is observed for the late afternoon period for the To Brignole direction where the average waiting time is reduced from 7.3 minutes to just 0.5 minute (representing a 93% reduction). As for the average queue length, the simulated values for all time periods are well under the operator’s target value (i.e. 50). Total In-Station Time (Total IST) means the total time a passenger spent in a station, reflecting their overall passenger experience.
As for the Serdica station, significant reduction in average waiting time over the baseline scenarios can be observed for Lines 1 and 4 (for up to 66.6%) and for the peak periods for Line 2. However, some level of increases in the KPIs can be observed for Line 2 during non-peak periods. Similar to the previous discussions, the primary reason for this slightly increase in KPIs should be the longer headways being used for during non-peak periods when compared to their baseline scenario counterparts.
Table 21.
Simulation Results of the Optimal Service Operation Solutions (Line 2, Serdica).
| Time Period | To Vitosha Direction | To Obelya Direction | ||||
|---|---|---|---|---|---|---|
| Total IST | Ave. Waiting Time | Ave. Queue Length | Total IST | Ave. Waiting Time | Ave. Queue Length | |
| 05:00 - 07:00 | 10.1 (+31.2%) | 5.9 (+68.6%) | 27.3 (+106.8%) | 11.2 (-3.4%) | 7.0 (-6.7%) | 26.9 (+12.1%) |
| 07:00 - 10:00 | 7.0 (+3.0%) | 2.9 (+7.7%) | 72.2 (+11.4%) | 7.1 (-4.1%) | 3.0 (-9.1%) | 72.2 (-10.1%) |
| 10:00 - 16:00 | 8.6 (+16.2%) | 4.7 (+34.3%) | 119.9 (+33.1%) | 8.7 (+16.0%) | 4.8 (+33.3%) | 117.0 (+24.6%) |
| 16:00 - 20:00 | 7.1 (-3.6%) | 3.1 (-7.3%) | 128.7 (-6.1%) | 7.4 (-2.6%) | 3.4 (-2.9%) | 190.9 (+15.1%) |
| 20:00 - 24:00 | 9.7 (+22.8%) | 5.8 (+45.0%) | 86.7 (+53.2%) | 10 (+25.0%) | 6.2 (+51.2%) | 98.4 (+46.2%) |
Table 22.
Simulation Results of the Optimal Service Operation Solutions (Line 1, Serdica).
| Time Period | To Obelya Direction | To Sofia Airport Direction | ||||
|---|---|---|---|---|---|---|
| Total IST | Ave. Waiting Time | Ave. Queue Length | Total IST | Ave. Waiting Time | Ave. Queue Length | |
| 05:00 - 07:00 | 10.6 (-0.9%) | 5.8 (-14.7%) | 7.6 (-14.6%) | 7.4 (-33.3%) | 2.5 (-61.5%) | 4.0 (-66.9%) |
| 07:00 - 10:00 | 6.1 (-26.5%) | 1.4 (-61.1%) | 11.1 (-66.6%) | 6.3 (-27.6%) | 1.1 (-69.4%) | 12.7 (-71.1%) |
| 10:00 - 16:00 | 6.1 (-27.4%) | 1.8 (-58.1%) | 22.4 (-53.2%) | 7.3 (-14.1%) | 2.6 (-35.0%) | 39.2 (-30.4%) |
| 16:00 - 20:00 | 6.4 (-21%) | 2.1 (-44.7%) | 43.9 (-44.1%) | 7.0 (-7.9%) | 2.4 (-17.2%) | 52.7 (-27.8%) |
| 20:00 - 24:00 | 6.7 (-6.9%) | 3.0 (-14.3%) | 21.2 (-24.0%) | 7.3 (-18.9%) | 3.3 (-34.0%) | 31.0 (-31.7%) |
Table 23.
Simulation Results of the Optimal Service Operation Solutions (Line 4, Serdica).
| Time Period | To Slivnitsa Direction | To Business Park Direction | ||||
|---|---|---|---|---|---|---|
| Total IST | Ave. Waiting Time | Ave. Queue Length | Total IST | Ave. Waiting Time | Ave. Queue Length | |
| 05:00 - 07:00 | 8.9 (-21.2%) | 2.9 (-57.4%) | 3.9 (-55.2%) | 7.0 (-11.4%) | 2.1 (-36.4%) | 3.7 (-37.3%) |
| 07:00 - 10:00 | 6.0 (-20.0%) | 1.2 (-55.6%) | 10.8 (-58.5%) | 7.2 (+2.9%) | 2.0 (+5.3%) | 18.8 (-21.7%) |
| 10:00 - 16:00 | 6.8 (-8.1%) | 2.5 (-21.9%) | 30.4 (-17.2%) | 6.7 (-25.6%) | 2.0 (-55.6%) | 22.0 (-62.5%) |
| 16:00 - 20:00 | 6.4 (-11.1%) | 2.2 (-26.7%) | 43.5 (-29.8%) | 6.6 (-19.5%) | 2.0 (-42.9%) | 37.8 (-55.4%) |
| 20:00 - 24:00 | 6.7 (-22.1%) | 3.0 (-38.8%) | 23.7 (-33.1%) | 7.0 (-26.3%) | 3.0 (-45.5%) | 21.0 (-55.1%) |
5.3.2. Impacts of Future Passenger Demand
This section summarises the results for Scenarios OF, which aim at evaluating the performance of the optimal service operation solutions should the passenger demand be increased by 25% in the future over the baseline.
The model settings for these simulation runs are modified on top of the optimal service solution scenario (i.e. Scenario O). The results are summarised in Table 24 for De Ferrari, and in Table 25 to Table 27 for Serdica. The numbers shown in parentheses are the percentage differences comparing the baseline scenario values.
Table 24.
Simulation Results of Afternoon Peak Period for Scenarios OF (De Ferrari).
| Scenarios | To Brin Direction | To Brignole Direction | ||||
|---|---|---|---|---|---|---|
| Total IST | Ave. Waiting Time | Ave. Queue Length | Total IST | Ave. Waiting Time | Ave. Queue Length | |
| O | 6.3 (-32.3%) | 1.8 (-63.3%) | 8.7 (-60.6%) | 5.9 (-15.7%) | 1.5 (-37.5%) | 2.0 (-61.5%) |
| OF | 6.7 (-28.0%) | 1.9 (-61.2%) | 10.7 (-51.6%) | 6.9 (-1.4%) | 1.6 (-33.3%) | 3.7 (-28.8%) |
Table 25.
Simulation Results of Afternoon Peak Period for Scenarios OF (Line 2, Serdica).
| Scenarios | To Vitosha Direction | To Obelya Direction | ||||
|---|---|---|---|---|---|---|
| Total IST | Ave. Waiting Time | Ave. Queue Length | Total IST | Ave. Waiting Time | Ave. Queue Length | |
| O | 7.1 (-3.6%) | 3.1 (-6.1%) | 128.7 (-6.1%) | 7.4 (-2.6%) | 3.4 (-2.9%) | 190.9 (+15.1%) |
| OF | 7.9 (+7.3%) | 3.1 (-6.1%) | 160.1 (+16.8%) | 8.1 (+6.6%) | 3.4 (-2.9%) | 233.7 (+40.9%) |
Table 26.
Simulation Results of Afternoon Peak Period for Scenarios OF (Line 1, Serdica).
| Scenarios | To Obelya Direction | To Sofia Airport Direction | ||||
|---|---|---|---|---|---|---|
| Total IST | Ave. Waiting Time | Ave. Queue Length | Total IST | Ave. Waiting Time | Ave. Queue Length | |
| O | 6.4 (-21.0%) | 2.1 (-44.7%) | 43.9 (-44.1%) | 7.0 (-7.9%) | 2.4 (-17.2%) | 52.7 (-27.8%) |
| OF | 6.7 (-17.3%) | 2.2 (-42.1%) | 53.6 (-31.7%) | 7.4 (-2.6%) | 2.5 (-13.8%) | 67.1 (-8.1%) |
Table 27.
Simulation Results of Afternoon Peak Period for Scenarios OF (Line 4, Serdica).
| Scenarios | To Slivnitsa Direction | To Business Park Direction | ||||
|---|---|---|---|---|---|---|
| Total IST | Ave. Waiting Time | Ave. Queue Length | Total IST | Ave. Waiting Time | Ave. Queue Length | |
| O | 6.4 (-11.1%) | 2.2 (-26.7%) | 43.5 (-29.8%) | 6.6 (-19.5%) | 2.0 (-42.9%) | 37.8 (-55.4%) |
| OF | 6.7 (-6.9%) | 2.2 (-26.7%) | 56.7 (-8.5%) | 6.9 (-15.9%) | 2.0 (-42.9%) | 48.1 (-43.2%) |
Table 24 shows that there are significant improvements in all the three KPIs monitored across all scenarios for De Ferrari over the baseline scenarios. The 1.5 minutes average waiting time optimisation target is basically met for all scenarios simulated. In dealing with a 25% increase in passenger demand at De Ferrari, the KPIs are only slightly affected but are still kept well below the KPIs for the baseline scenario. As for the average queue length, the simulated values for all scenarios are well under the operator’s target value (i.e. 50 passengers).
As for the Serdica station, the proposed optimal service operation solutions would be able to perform satisfactorily for Lines 1 and 4 where all the monitored KPIs are better than the baseline scenario, and the average waiting time optimisation target (i.e. 2.0-2.4 minutes) is basically met for all the scenarios evaluated (Table 26 and Table 27). This indicated that the optimal service operation solution is capable of satisfactorily dealing with the current and 25% increases in passenger demand for Lines 1 and 4. For Line 2 (Table 25), the average waiting time optimisation target (i.e. 3.5 minutes) is also met for the increased passenger demand scenario (i.e. Scenario OF).
6. Conclusion
This study investigated the application of scenario-based simulation and optimisation techniques to support metro timetable development from a station-level operational perspective. Whilst previous studies have primarily focused on network-wide timetable optimisation, the present research examined how timetable parameters, particularly train headways and dwell times, influence passenger and operational performance within individual metro stations. Using two real-world case studies, namely De Ferrari Station in Genoa (Italy) and Serdica Station in Sofia (Bulgaria), a hybrid simulation and optimisation framework was developed and evaluated.
The findings demonstrate that timetable optimisation can deliver substantial improvements in station performance without requiring major infrastructure investment. The simulation experiments and regression analyses consistently showed that train headway is the most influential factor affecting passenger waiting times, whilst dwell time provides a secondary but complementary contribution, particularly during periods of higher passenger demand. The fitted regression models achieved strong explanatory power, with most models producing coefficients of determination above 0.9 and demonstrating statistically significant relationships between operational parameters and passenger waiting time.
The optimisation results further showed that appropriate combinations of train headway and dwell time can significantly reduce passenger waiting times, average queue lengths, and overall passenger time spent within the station. Across the two case studies, reductions in passenger waiting time of more than 60% were achieved in several scenarios when compared with existing operations. The proposed solutions also performed satisfactorily under a future demand scenario involving a 25% increase in passenger volumes, indicating the robustness of the approach in supporting future operational planning.
It is important to re-iterate that the current research is positioned somewhat differently from many network-wide optimisation studies. Rather than seeking to develop a real-time control framework for an entire metro network, the proposed methodology is intended to support decision-making in situations where the operational needs of a particular station may warrant special consideration. As discussed previously, such circumstances may arise at major interchange stations, important network focal points, locations experiencing exceptional passenger demand, or during service disruptions and special events. In these situations, operators may intentionally prioritise local station performance over network-wide optimality, thereby reducing the need for continuous integration with system-wide real-time control and optimisation platforms. Currently, there is no systematic methodology in conducting such analysis. Determination of operational strategies remains relying on operators’ practical experiences. The proposed framework therefore addresses this gap by providing a practical means of assessing the implications of alternative train frequency and dwell time strategies for a specific station under defined operational scenarios.
Furthermore, the continuous involvement of metro operators throughout model development, verification, validation, and result interpretation ensures that the proposed scenarios and optimisation outputs remain grounded in operational reality. As a result, the study contributes a practically relevant decision-support tool that bridges the gap between theoretical optimisation research and station-level operational planning, whilst recognising that future integration with real-time control systems represents an important next step for further research.
The value of the proposed framework lies not in replacing line-based and network-wide train traffic management systems, but in providing metro operators with a targeted analytical tool for evaluating whether temporary or location-specific timetable adjustments can deliver operational benefits at strategically important stations under particular operating conditions.
6.1. Major Contributions
The study makes several important contributions. First, it extends the timetable optimisation literature by shifting the analytical focus from network-level scheduling towards station-level operational performance, an area that has received relatively limited attention in previous research. Second, it demonstrates how hybrid agent-based and discrete-event simulation can be integrated with MILP optimisation to bridge the gap between theoretical timetable optimisation and practical operational decision-making. Third, by applying the framework to two contrasting European metro systems, the study provides evidence of the transferability and practical applicability of simulation-supported timetable optimisation across different operational contexts. Finally, the research offers metro operators a transparent and evidence-based decision-support framework that can be used to evaluate timetable adjustments whilst accounting for operational constraints and passenger impacts.
6.2. Study Limitations
Despite these contributions, several limitations should be acknowledged. First, the analysis focused on two operational variables only, namely train headway and dwell time. Although these variables were found to be highly influential, other timetable and operational factors such as train capacity, passenger flow control measures, rolling-stock availability, platform management strategies, and service disruption scenarios were not explicitly included within the optimisation framework. Second, the optimisation model relied on linear regression functions derived from simulation outputs to represent the relationship between timetable parameters and passenger waiting times. Whilst this approach improves computational efficiency, it may not fully capture more complex non-linear interactions that exist in real-world metro operations. Third, the study considered only two case study stations and therefore the findings may not be directly generalisable to all metro systems, particularly networks with substantially different operational characteristics, passenger demand profiles, or service patterns. Finally, whilst the proposed methodology was developed using real operational data, the optimised solutions were assessed through simulation experiments rather than implementation in a live operational environment.
6.3. Future Research Opportunities
Future research could extend the proposed framework in several directions. Additional decision variables, including train capacity allocation, rolling-stock scheduling, platform management measures, and passenger flow control strategies, could be incorporated within a broader optimisation framework. The use of advanced optimisation approaches, such as metaheuristics, reinforcement learning, and real-time adaptive scheduling, may further enhance system performance under dynamic operating conditions. Future studies could also investigate network-level and multi-station applications to examine the interactions between local station performance and wider network operations. Furthermore, integrating real-time passenger demand data and operational information could support the development of digital-twin-enabled decision-support systems capable of dynamic timetable adjustment. Finally, validation through pilot implementation in operational metro environments would provide valuable evidence regarding the practical effectiveness and organisational feasibility of the proposed approach.
Overall, this research demonstrates that combining simulation and optimisation provides a practical and effective means of supporting metro timetable development from a station-level perspective. By linking passenger behaviour, station operations, and timetable design within a unified analytical framework, the study contributes to both the academic literature and professional practice, while providing a foundation for the future development of more adaptive, passenger-focused, and data-driven metro operations.
Author Contributions
Conceptualization, H.Y.T and M.M.; methodology, H.Y.T and P.B.; software, H.Y.T. and P.B.; validation, H.Y.T and P.B.; formal analysis, H.Y.T. and P.B.; investigation, H.Y.T. and P.B.; resources, M.M. and H.Y.T.; data curation, H.Y.T. and P.B.; writing—original draft preparation, H.Y.T. and P.B.; writing—review and editing, H.Y.T. and M.M.; visualization, H.Y.T. and P.B.; supervision, H.Y.T. and M.M.; project administration, M.M. and H.Y.T.; funding acquisition, M.M. and H.Y.T.. All authors have read and agreed to the published version of the manuscript.
Funding
This research was co-funded by the European Union, grant number 101177985”.
Data Availability Statement
Restrictions apply to the availability of these data. Data were obtained from the two metro operators and are available subject to their permission.
Acknowledgments
The authors would like to sincerely thank the two metro operators in providing the necessary information (including the station layout map, metro operational data and passenger demand data) for the modelling work of the NEXUS project described in this paper.
References
- Guo, H.; Bai, Y.; Hu, Q.; Zhuang, H.; Feng, X. Optimization on metro timetable considering train capacity and passenger demand from intercity railways. Smart Resilient Transp. 2021, 3(1), 66–77. [Google Scholar] [CrossRef]
- Huang, J.; Zhang, T.; Wei, R. Urban railway transit timetable optimisation based on passenger-and-trains matching–A case study of Beijing metro line. Promet-Traffic Transp. 2021, 33(5), 671–687. [Google Scholar] [CrossRef]
- Wu, Z.; Yang, K. Collaborative Optimization of Train Scheduling and Passenger Flow Control with Adjustable Dwell Time on a Congested Metro Line. In Proceedings of the 6th International Conference on Electrical Engineering and Information Technologies for Rail Transportation (EITRT) 2023. Singapore Lecture Notes in Electrical Engineering 1137; Springer: Singapore; pp. 540–548. [CrossRef]
- Jin, W.; Sun, P.; Yao, B.; Ding, R. A Train Timetable Optimization Method Considering Multi-Strategies for the Tidal Passenger Flow Phenomenon. Appl. Sci. 2024, 14(24), 11963. [Google Scholar] [CrossRef]
- Zhang, M.; Wang, Y.; Su, S.; Tang, T.; Ning, B. A short turning strategy for train scheduling optimization in an urban rail transit line: the case of Beijing subway line 4. J. Adv. Transp. 2018, 1, 5367295. [Google Scholar] [CrossRef]
- Li, C.; Tang, J.; Zhang, J.; Zhao, Q.; Wang, L.; Li, J. Integrated optimization of urban rail transit line planning, timetabling, and rolling stock scheduling. PLoS ONE 2023, 18(5), e0285932. [Google Scholar] [CrossRef]
- Su, B.; Wang, F.; Su, S.; Wang, Z.; Tang, T. A Two-Step Optimization Framework for Real-Time Train Rescheduling in an Urban Rail Transit Line. IEEE Trans. Intell. Transp. Syst. 2025, 26(6), 9065–9079. [Google Scholar] [CrossRef]
- Gupta, S.D.; Van Parys, B.P.; Tobin, J.K. Energy-optimal Timetable Design for Sustainable Metro Railway Networks. arXiv 2023, arXiv:2309.05489. [Google Scholar]
- Zhou, Y.; Bai, Y.; Li, J.; Mao, B.; Li, T. Integrated optimization on train control and timetable to minimize net energy consumption of metro lines. J. Adv. Transp. 2018, 1, 7905820. [Google Scholar] [CrossRef]
- Oh, Y.; Kwak, H.C.; Kang, S. Development of optimal real-time metro operation strategy minimizing total passenger travel time and train energy consumption. IET Intell. Transp. Syst. 2024, 18(12), 2440–2458. [Google Scholar] [CrossRef]
- Bach, L.; Mannino, C.; Sartor, G. MILP approaches to practical real-time train scheduling: the Iron Ore Line case. In the Proceedings of the International Network Optimization Conference (INOC), 2019; pp. 78–82. [Google Scholar] [CrossRef]
- Tong, H.Y.; Bannon, P.; Marinov, M. Agent-Based Discrete-Event Simulation Modelling of Metro Stations for Crowd Management and Passenger Flow Analysis. Sustainability 2026. [Google Scholar] [CrossRef]
Figure 1.
Overall Study Methodology and the Two-Stage Optimisation Framework.

Figure 2.
Metro Station Simulation Models Development Framework.

Table 1.
Summary of Key Findings from the Literature Review on Metro Timetable Optimisation.
| Study | Metro System / Dataset | Primary Objective | Optimisation Variables | Key Reported Benefits | Benefit Category |
|---|---|---|---|---|---|
| [7] | Beijing Yizhuang Metro Line | Disruption recovery and real-time rescheduling | Dispatching, retiming, cancellations, short-turning, stop-skipping | Improved service recovery performance and operational resilience during disruptions | Disruption recovery Real-time operational control |
| [1] | Beijing Metro Line 9 (Beijing West Station) | Rail-metro interchange coordination | Train departure times and headways | Average passenger waiting time reduced by 28.47% | Passenger waiting time reduction |
| [2] | Beijing Metro Line 1 | Passenger waiting time optimisation | Service frequency and dwell time | Passenger waiting time reduced by 15.5%; matched passengers increased by 37.7% | Passenger waiting time reduction |
| [5] | Beijing Subway Line 4 | Short-turn service optimisation | Headway allocation and short-turn patterns | Fleet utilisation reduced by 20.69%, releasing operational resources | Fleet optimisation |
| [3] | Congested metro corridor (real-world operational data) | Crowding mitigation and passenger flow management | Timetable and variable dwell times | Passenger waiting time reduced by 40.8% and platform congestion alleviated | Passenger waiting time reduction Capacity and crowd management |
| [8] | Shanghai Metro Line 8 | Energy-optimal timetable design | Departure timing and regenerative braking coordination | Energy savings of 20.93%-28.68% compared with existing timetables | Energy efficiency |
| [9] | Beijing Metro Line 5 | Integrated train control and timetable optimisation | Headway, train control strategy, coasting, braking | Up to 20% traction energy reduction and 4.97% net energy reduction | Energy efficiency |
| [4] | Shanghai Suburban Railway Airport Link | Peak demand management | Headway, dwell time, running time, express/local operation | Combined passenger and operator costs reduced by 38.59% | Capacity and crowd management Integrated planning |
| [10] | Seoul Metro Line U | Real-time operational optimisation using AI | Departure times and operational strategies | Operational efficiency improvements of 7-14%; solutions generated in 0.18 seconds | Real-time operational control |
| [6] | Chongqing Metro Line 3 | Integrated planning and scheduling | Line planning, timetabling, rolling stock scheduling | Total costs reduced by 13%; improved fleet allocation and load-factor balance | Fleet optimisation; Integrated planning; Capacity and crowd management |
| [11] | Norwegian-Swedish Iron Ore Railway | Real-time dispatching implementation | Dynamic dispatching decisions | Demonstrated practical implementation of optimisation in live operations with solutions generated in approximately 2 secs | Real-time operational control |
Table 2.
Station Core Baseline Parameters of the two Selected Cases.
| Parameter | Specific Parameters | AMT | MetroS |
|---|---|---|---|
| Location | Station Name | De Ferrari Station | Serdica Station |
| Layout | Number of Levels | 4 (G/F to -3/F) | 5 (G/F to -4/F) |
| Number of Entrances / Exits | 2 | 12 | |
| Number of Platforms | 2 | 4 | |
| Platform Capacity | 500 passengers | 1500 passengers | |
| Operational Parameters | Train Departure Schedules | Derived from GTFS data (with minimum headway of 6 mins) | Official daily timetable (with minimum headway of 3 mins) |
| Dwell Time | 22 seconds (Fixed) | 35 seconds (Fixed) | |
| Number of Lines Served | 1 | 3 (L1, L2 and L4) | |
| Train Capacity | Old: 420 pax/train New: 290 pax/train |
1226 pax/train | |
| Number of Train Doors | Old: 3 per car New: 3 per car |
5 per car for 1st and last carriage; 6 per car for intermediate carriage |
|
| Passenger Flow | Baseline OD Demand | Approximately 11,000 passenger visits / day | Approximately 80,000 passenger visits / day |
| Peak Hour Percentage | 15%-16% of daily total | 18% of daily total |
Table 3.
Practical Ranges of Metro Station Service Frequency and Dwell Time.
| De Ferrari Station | Serdica Station | |||
|---|---|---|---|---|
| Minimum | Maximum | Minimum | Maximum | |
| Service Frequency (min) | 3 | 20 | 3 | 15 |
| Dwell Time (Second) | 15 | 40 | 10 | 40 |
Table 4.
Service Frequency Levels for Simulation Experiments (De Ferrari).
| Time Period | Existing Service Frequency (min) | Service Frequency for Simulation Experiments (min) | |||
|---|---|---|---|---|---|
| To Brin | To Brignole | High | Medium | Low | |
| 05:00 - 07:00 | 10 – 20 | 10 – 20 | 5 | 10 | 15 |
| 07:00 - 10:00 | 6 – 7 | 6 – 7 | 3 | 5 | 8 |
| 10:00 - 16:00 | 6 – 7 | 6 – 7 | 3 | 5 | 8 |
| 16:00 - 20:00 | 6 – 7 | 6 – 7 | 3 | 5 | 8 |
| 20:00 - 24:00 | 10 – 15 | 10 – 15 | 5 | 10 | 15 |
Table 5.
Service Frequency Levels for Simulation Experiments (Serdica).
| Time Period | Existing Service Frequency (min) | Service Frequency for Simulation Experiments (min) | |||
|---|---|---|---|---|---|
| Line 2 | Line 1/4 | High | Medium | Low | |
| 05:00 - 07:00 | 6 – 12 | 4 – 6 | 5 | 8 | 10 |
| 07:00 - 10:00 | 6 – 6.5 | 3 – 3.5 | 3 | 4 | 5 |
| 10:00 - 16:00 | 9 | 4.5 | 5 | 8 | 10 |
| 16:00 - 20:00 | 7 | 3.5 – 4.5 | 4 | 5 | 6 |
| 20:00 - 24:00 | 9 – 15 | 5.5 – 7.5 | 5 | 8 | 10 |
Table 10.
Metro Station Service Optimisation Target Values (Serdica).
| Time Period | Line 2 | Line 1 and Line 4 | ||
|---|---|---|---|---|
| Existing Headway (min) |
Target Ave. Waiting Time (min) | Existing Headway (min) |
Target Ave. Waiting Time (min) | |
| 05:00 - 07:00 | 6.0 – 12.0 | 4.50 | 4.0 – 6.0 | 2.50 |
| 07:00 - 10:00 | 6.0 – 6.5 | 3.00 | 3.0 – 3.5 | 1.50 |
| 10:00 - 16:00 | 9.0 | 4.50 | 4.5 | 2.25 |
| 16:00 - 20:00 | 7.0 | 3.50 | 3.5 – 4.5 | 2.50 |
| 20:00 - 24:00 | 9.0 – 15.0 | 6.00 | 5.5 – 7.5 | 3.25 |
Table 16.
Baseline and Optimal Scenarios vs Optimisation Target (De Ferrari).
| Time Period | Average Waiting Time (To Brin) (in min) | Average Waiting Time (To Brignole) (min) | ||||
|---|---|---|---|---|---|---|
| Target | Simulated (Baseline) | Simulated (Optimal) | Target | Simulated (Baseline) | Simulated (Optimal) | |
| 05:00 - 07:00 | 1.5 | 2.1 | 2.4 | 1.5 | 2.0 | 1.1 |
| 07:00 - 10:00 | 1.5 | 3.0 | 1.6 | 1.5 | 2.0 | 1.0 |
| 10:00 - 16:00 | 1.5 | 4.4 | 1.8 | 1.5 | 2.6 | 1.1 |
| 16:00 - 20:00 | 1.5 | 4.9 | 1.8 | 1.5 | 2.4 | 1.0 |
| 20:00 - 24:00 | 1.5 | 4.3 | 2.7 | 1.5 | 7.3 | 6.8 |
Note 1: Simulated (Baseline) is the simulated average waiting time using the baseline model settings Note 2: Simulated (Optimal) is the simulated average waiting time using the optimal solution settings.
Table 20.
Simulation Results of the Optimal Service Operation Solutions (De Ferrari).
| Time Period | To Brin Direction | To Brignole Direction | ||||
|---|---|---|---|---|---|---|
| Total IST | Ave. Waiting Time | Ave. Queue Length | Total IST | Ave. Waiting Time | Ave. Queue Length | |
| 05:00 - 07:00 | 5.4 (+5.9%) | 2.4 (+14.3%) | 0.4 (0.0%) | 4.1 (-18.0%) | 1.1 (-45.0%) | 0.1 (0.0%) |
| 07:00 - 10:00 | 4.7 (-23.0%) | 1.6 (-46.7%) | 1.6 (-40.7%) | 4.1 (-21.2%) | 1.0 (-50.0%) | 0.2 (-60.0%) |
| 10:00 - 16:00 | 5.6 (-33.3%) | 1.8 (-59.1%) | 5.6 (-58.2%) | 4.7 (-24.2%) | 1.1 (-57.7%) | 1.1 (-54.2%) |
| 16:00 - 20:00 | 6.3 (-32.3%) | 1.8 (-63.3%) | 8.7 (-60.6%) | 5.9 (-15.7%) | 1.5 (-37.5%) | 2.0 (-61.5%) |
| 20:00 - 24:00 | 5.7 (-21.9%) | 2.7 (-37.2%) | 2.4 (-51.0%) | 9.9 (-4.8%) | 6.8 (-6.8%) | 1.2 (-20.0%) |
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2026 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.
Copyright: This open access article is published under a Creative Commons CC BY 4.0 license, which permit the free download, distribution, and reuse, provided that the author and preprint are cited in any reuse.