Abstract
Nearly three quarters of the simulated time saving in industrial lead routing came from shorter waits for staff. At the supplier studied, leads entered a customer relationship management (CRM) system, while accepted quotations became orders in an enterprise resource planning (ERP) system. Arena models traced each workflow from lead registration to order entry or closure. In SimPy, 400 paired replications per setting separated the effect of routing from those of staffing and contact policy. Across matched settings, redesigned routing shortened mean time per lead by 181.3 hours (simultaneous 95% confidence interval, 172.0–190.7 hours). A second representative shortened queues without changing order counts. A retry after an unanswered call yielded 6.7 additional orders per 100 leads. Of 1,561 selected sales orders from 252 quotations, 114 lacked a buyer. If related orders could share verified customer details, one entry per affected quotation would save 308 staff-hours at an assumed 4 hours per update. Completing those fields earlier shortened the path to ERP when late entry sent a prepared order back to sales.

Keywords:
customer relationship management
; enterprise resource planning
; discrete-event simulation
; lead-to-order process
; customer data quality
1. Introduction
A faster sales system earns its value when it shortens the customer’s journey from enquiry to order. Customer relationship management (CRM) supports sales interactions, while enterprise resource planning (ERP) manages the orders that follow. In 2025, ERP was used by 46.45% of European Union enterprises covered by Eurostat’s survey, and CRM by 28.51% (Eurostat, 2026). The value to industrial suppliers is dependent on the accuracy of their customer records and the ability to process the work by their employees. When a quotation is prepared by automation, delays at this interface may result in a quotation waiting.
Automated CRM functions may lead to a higher workload for personnel in the following tasks. Another attempt to contact may result in a sales opportunity being retrieved, but more time will be spent. These effects can be tested with simulation without having to change the operating rules. Resource availability and performance influence process behaviour (López-Pintado et al., 2024). Waiting also arises from external responses, which require explicit treatment alongside staff queues (Chapela-Campa & Dumas, 2024).
In industrial sales research, manual work was explored by Abaddi (2025a) using interviews and modelling techniques of Simul8. The present study builds on this line of inquiry and explores the interplay of workflow redesign with sales operating rules. It also explores whether the completion of customer information earlier decreases the customer order delay. Event logs are used to generate simulation models using automated methods, e.g. SIMOD (Chapela-Campa et al., 2025).
The study looks at an industrial business-to-business organisation, named ID for anonymity. It has the sales process that receives customer enquiries and takes them through to the ERP order creation. There are multiple orders that can result from a single quotation, and customer data is important not just for a single order; it’s important for multiple orders.
The as-is model is the legacy on premise CRM workflow. The to-be model is the SAP Cloud for Customer (C4C) automated lead handling and reworked quotation-to-order workflow. These are compared using discrete-event simulation to analyse their impact on sales performance.
For ID, the decision is how to shorten order handling while accounting for the work generated by each policy. The as-is and to-be workflows are each tested under alternative contact policies and staffing levels. A separate set of scenarios examines when customer information is completed during order handling. Early completion supplies the required information before order preparation; late completion introduces this work after preparation. Each timing scenario considers two update rules: a quotation-level update serving its related orders, or a separate update for each order. An additional comparison examines the waiting created when this work returns to a staff queue.
The first objective is to compare the CRM workflows and assess the operating policies applied within them. Experiments vary contact retries and sales staffing, measuring their effects on elapsed time and workload. Successful sales outcomes are tracked to interpret the value of further contact attempts. The second objective is to assess how the timing and scope of customer-data completion affect order handling. Distinction is made between the time taken to complete information and the time waiting for staff. Sensitivity experiments involve studying the effects of demand and task assumptions on performance.
Arena is used to model the as-is and to-be sales workflows. The controlled workflow experiments and customer-data scenarios are run in Python with SimPy. Workflow behaviour is specified by process activity times and routing probabilities, and how updates relate to each other in the linked records is specified by quotation–order relationships. NumPy supports random sampling, and SciPy calculates confidence intervals for paired comparisons. The primary experiment notebook is executed in Google Colab; extended sensitivity experiments run locally. Matplotlib produces analysis plots. Figure 1 outlines the study framework.
The study provides a controlled comparison of the options for a CRM–ERP workflow and a view into the handling of customer data related to orders. Workflow effects are separated from the effects of operating policies in a factorial experiment. The early and late completion scenarios separate processing effort from additional queueing, explaining how the timing of data entry influences elapsed time. Comparing quotation-level and order-level updates establishes how shared customer information changes the amount of work required. Computational checks verify model behaviour, and sensitivity experiments assess the stability of the comparisons.
The paper then summarizes the integration of CRM and ERP and the process simulation. The methods section describes the setting of the case and the experimental design. It includes both the workflow performance and the handling of customer data. Current implications and limitations are discussed, and the results of the study are summarized.
2 Literature Review
2.1 CRM–ERP Integration and Customer Information
The operational value of CRM–ERP integration depends on reliable customer information and the work required to maintain it across related transactions. For CRM integration, Albrecht et al. (2023) situate data-quality demands in platform delivery with the subsequent linkage of data-quality assessment to improvement activities. In a medical-technology firm, the issues of customer-record mismatches were experienced in integrating ERP, which meant orders were sent to the wrong person and pricing information was inconsistent (Singh & Gebauer, 2024).
In manufacturing, Patel et al. (2024) implemented web-based management of shared customer records across two ERP systems. Their evaluation combined user feedback with cost measures. For order creation, Vetter et al. (2024) found a positive association between master-data quality and process quality in a chemical enterprise, using linear regression. In industrial sales, Abaddi (2025a) used Simul8 to compare a manual workflow with a proposed CRM–ERP workflow. The integrated scenario produced shorter simulated completion times.
For related orders, the present study examines when customer information is completed and whether one update can serve several orders. The comparison measures staff effort and elapsed order-handling time.
2.2 Simulation for Operational Decisions
Workflow performance depends on the time between activities as well as the time spent performing them. In process simulation, López-Pintado et al. (2024) reproduced completion-time distributions more closely by modelling individual resource availability and performance. Chapela-Campa and Dumas (2024) improved temporal accuracy by explicitly representing delays beyond resource queues, including time spent awaiting a customer response.
For ERP-supported operations, Abaddi (2025b) combined a tailored ERP system with discrete-event simulation of a proposed battery-recycling hub. The simulation identified bottlenecks and estimated throughput under continuous production. In manufacturing, Grznár et al. (2024) used Simio and regression to identify processing times and arrival intervals as the main influences on lead time in their model.
For simulation experiments, He and Song (2024) distinguish uncertainty in estimated inputs from random variation between runs. In scenario comparisons, Zhou et al. (2023) reduced variation in estimated differences by reusing the same random numbers across alternatives in a travel-demand model. Here, paired confidence intervals quantify differences between workflow scenarios, and sensitivity experiments test their response to alternative demand and task-duration assumptions.
2.3 Research Gap
Separating workflow effects from operating-policy effects is essential to interpreting CRM–ERP performance. The reviewed studies demonstrate simulated integration gains (Abaddi, 2025a) and an association between master-data quality and order-process quality (Vetter et al., 2024). The difference that is discussed here is about the comparisons under matched sales policies and the creation of work with incomplete customer information for related orders. The second issue is addressed with paired workflow experiments. There are two scenarios to consider: one where the project is completed early and another where it is completed late, and both are considered as two different assumptions in the quotation and order level. Reductions in repeated work are not the same as reductions in waiting times, and can be captured by measuring staff effort.
3. Methods
3.1. Case Setting and Data
Of the chosen sales extract, the “164” of the “252” quotations could be connected to more than one order at ID. Buyer (the party making the purchase) was recorded separately from the end customer (the customer quoted). It was the ID’s responsibility to get the quotations and when orders were received, to negotiate the prices and then issue firm quotations. The workflow was done based on the “Closed” status of the process where it was not being able to register a CRM record or create an in ERP order.
For the order analysis, a Python script used openpyxl to group rows by quotation number and sales order number. Each pair appeared on 9 rows, one per reporting measure. Both customer fields agreed across those rows, so the analysis retained one record per pair (Appendix D). In 3 quotations, some orders had both customer fields assigned while others lacked a buyer. All 77 pairs flagged for transfer issues also appeared among the pairs with unassigned customer data. Table 1 identifies each input and its source.
3.2. Model Structure and Assumptions
While a customer considers a quotation, a sales representative can prepare another. Both Arena workflows (Appendix A and Appendix B) allowed 48 h for negotiation without assigning staff to the task. In SimPy, the first lead entered an empty system, and subsequent interarrival times followed an exponential distribution. Staffed tasks joined a first-come, first-served queue for the relevant role. Each run assumed continuous staffing and fixed task durations. The local experiments ran in Python 3.12.14 with SimPy 4.1.2.
At intake, the as-is model assigned 14 h of sales operations time to each lead. Automated validation took 6 h of system time in the to-be model. Each workflow screened a lead once and closed it if a matching CRM record existed. Each remaining as-is lead required a further 8 staff-hours. In the to-be workflow, the system assigned the lead and sales operations reviewed unclear ownership.
After a failed contact attempt, the lead closed at the policy limit or waited 24 h for another attempt. Qualified leads proceeded to quotation, with presales support for nonstandard requests. Any required approval preceded negotiation. Customer acceptance triggered ERP order entry. In the main comparison, both workflows used the same probabilities for shared routing decisions. Figure 2 traces each route from intake to its final outcome.
The sales operations were responsible for updates to customer data (in the order model) as well as ERP order entry. An early update was made before the order was prepared by a sales representative. Then, a late update came, and the main comparison did not include the representative. Under the quotation-level rule, affected orders shared an update and waited if it was in progress. The order-level rule assigned a separate update to each affected order. Figure
hows where each update enters the order process. For a quotation with k affected orders, Equation
ives the extra staff-hours under the order-level rule when one update takes t staff-hours.
Figure 3.
Customer-data completion pathways in the order model.

3.3. Experimental Design
A second attempt to reach one customer can delay a quotation for another. Both CRM workflows were tested at every combination of contact limit and sales staffing. Within each replication, the model matched arrival times and routing draws for the same 100 leads across all 8 policies. In the local runs, NumPy 2.3.5 generated a separate draw for each contact attempt. Runs ended when every lead had exited.
The primary outcome was mean time from registration to exit across all leads in a run. A separate pilot of 30 runs per policy determined a common sample size of 400 independent replications. The target half-width for each policy’s 95% confidence interval was 5% of its mean. Within each replication, paired differences were averaged equally over the other factor settings. Bonferroni-adjusted t intervals gave 95% familywise confidence for the 3 main effects. Exploratory contrasts used pointwise 95% intervals. Equation
xpresses the workflow effect as hours saved per lead over R replications. In replication r, and are the as-is and to-be mean lead times, each averaged over the same staffing and contact settings.
The 12 main order scenarios compared time from arrival to completed ERP entry and staff-hours per order (Table 2). Each replication shuffled the 1,561 observed quotation–order pairs. Paired scenarios shared that sequence and arrival gaps drawn from an exponential distribution with a mean of 24 h. The model allowed 16 staff-hours to prepare each order and 8 to enter it in ERP. It assigned no staff time to detecting missing fields.
Only staffed tasks changed duration in the lead sensitivity tests. After a late update, an exploratory test compared direct ERP entry with a return to the sales representative’s queue. The return required no processing time, isolating the effect of queue re-entry on elapsed time.
3.4. Performance Measures and Model Verification
For each lead or order, SimPy summed the time from each request for staff to the start of service. In Equation
case i makes mi staff requests. Request j enters the queue at aij and starts service at sij. The mean included cases that never waited for staff. The scheduled delay before a retry counted as external time. An order waiting for a shared quotation update already in progress accrued coordination time.
traces one lead’s staff waits from registration to ERP entry.
Equation
ives mean staff-hours per case for N completed cases and utilization Ug for role g. A role with cg staff accumulated Bg busy hours during the T hours from first arrival to last exit. A shared quotation update counted once, however many orders used it.
In an as-is intake test, 2 duplicate leads arrived together. Each needed 14 h of screening from the same sales operations employee. The second lead therefore waited 14 h. SimPy reproduced the hand-calculated mean wait of 7 h and total workload of 28 staff-hours. Appendix C gives worked checks for leads and orders.
All 19 model tests and 3 queue re-entry checks passed. In each run, staff-hours summed by case matched busy hours summed by role. Total elapsed case-hours equaled the area under the curve showing how many cases were in the system over time. Across all 8 lead policies, mean simulated staff-hours per lead were within 1 Monte Carlo standard error of the workload calculated from routing probabilities and task durations.
4. Results
4.1. Workflow Performance
Shorter staff queues accounted for 73.2% of the simulated reduction in time from lead registration to exit. Across the 4 equally weighted settings, the complete to-be workflow saved 181.3 h per lead (simultaneous 95% confidence interval, 172.0–190.7 h), including 132.7 h of queue time.
The queue reduction was largest when 1 sales representative could retry an unanswered contact (Table 3). Mean time to exit fell from 312.2 to 90.3 h. Paired runs produced identical order counts under the shared routing rules.
Table 3.
Mean hours per lead spent waiting for staff under matched CRM policies.
| Attempt limit | Sales representatives | As-is | To-be | Reduction | 95% confidence interval |
| 1 | 1 | 121.5 | 6.0 | 115.4 | 108.4–122.5 |
| 1 | 2 | 110.9 | 0.5 | 110.4 | 103.4–117.4 |
| 2 | 1 | 193.8 | 22.5 | 171.4 | 162.6–180.1 |
| 2 | 2 | 135.4 | 1.9 | 133.5 | 125.3–141.7 |
Note. Pointwise intervals use 400 unrounded paired differences (as-is minus to-be).
Adding a representative in the to-be workflow saved 5.5 h of waiting per lead with a single attempt and 20.5 h with a retry. The corresponding workloads were 13.3 and 21.0 staff-hours per lead at either staffing level.
The to-be workflow saved 221.9 h per lead with 1 representative and a retry, or 71.1% of the as-is mean (Figure
With 2 representatives and a single attempt, the as-is mean was 198.6 h. Against that shorter baseline, a saving of 157.2 h per lead gave the largest proportional reduction (79.2%).
Figure 4.
Simulated time to exit and sources of time saved per lead. Note. Percentages use each as-is mean, and panel B weights the settings equally.
Figure 4.
Simulated time to exit and sources of time saved per lead. Note. Percentages use each as-is mean, and panel B weights the settings equally.

Staff work fell by 28.6 h per lead, and the shorter delay before the first contact attempt saved another 27.0 h. Automated screening and owner assignment took 6.9 h per lead. The net saving outside staff queues was 48.7 h per lead.
4.2. Contact Retries and Staff Workload
The same number of additional orders (32.4%) was generated in both of the simulated workflows, with the to-be workflow requiring less extra staff time. At either staffing level, mean orders rose from “10.8” to “17.5” per “100” leads. The single value “6.48” in the pair of values in Table “4” corresponds to the average number of additional orders per “100” leads, according to the shared routing probabilities.
We divided total added staff-hours, including work on unsuccessful leads, by total additional orders across paired runs. A retry lengthened mean time to exit by 57.5 h per lead across settings (simultaneous 95% confidence interval, 55.4 − 59.7 h).
Table 4.
Additional orders and staff workload from a contact retry.
| Measure | As-is workflow | To-be workflow |
| Additional orders per 100 leads | 6.7 (6.4 − 6.9) | 6.7 (6.4 − 6.9) |
| Additional staff-hours per 100 leads | 1,143 (1,119 − 1,167) | 773 (757 − 789) |
| Added staff-hours per order gained | 171.0 (166.6 − 175.6) | 115.6 (112.7 − 118.7) |
Note. Pointwise 95% intervals use 50,000 bootstrap resamples of 400 paired runs.
Staff made an average of 54.0 repeat attempts per 100 leads. These took 27.0 staff-hours in either workflow. More than 96% of the added staff time came after a customer answered. Qualification and quotation preparation each took 8 h less per visit in the to-be workflow. Together they accounted for 75.4% of the difference in added workload between workflows.
4.3. Staffing and Role Utilization
A second sales representative shortened the wait for staff by 23.7 h per lead on average across the matched SimPy runs (simultaneous 95% confidence interval, 22.3 − 25.2 h). Shorter queues accounted for the entire reduction in mean time to exit. Each matched cohort required the same staff-hours and produced the same number of orders at either staffing level.
Arena simulated each workflow once with 1 employee per role. Sales operations was busiest in the as-is run (89% utilization). In the to-be run, which allowed a retry and assumed a higher probability of reaching the customer, the sales representative was busiest (87%). Appendix E shows both Arena resource reports.
When both workflows allowed a retry, adding a representative raised utilization in as-is sales operations from 82.7% to 86.8% (Figure
Sales operations performed the same work over a shorter run on average. Leads in that setting still waited 135.4 h for staff.
Figure 5.
Staff utilization and mean waiting time when a retry is allowed.

In the to-be workflow with a retry, representatives spent 15.5 staff-hours per lead at either staffing level. Sharing that work between 2 representatives reduced their utilization from 62.7% to 31.7%. For leads that became orders, the time from registration to ERP order creation fell by 27.7 h on average (pointwise 95% confidence interval, 25.6 − 29.7 h).
4.4. Customer-Data Completion During Order Handling
If orders could reuse the customer details entered for their quotation, sales operations would avoid 77 repeat updates in ID’s selected cohort. The 114 quotation–order pairs with an unassigned buyer came from 37 quotations. Among the 19 quotations with multiple affected orders, the 5 with the most accounted for 50 of the avoidable updates.
At 4 h per update, entering the fields once per affected quotation saved 308 staff-hours in the simulation (Table
That was 67.5% of the time spent on missing fields under the order-level rule. The same saving represented 0.8% of total staff time once preparation and ERP entry were counted for all 1,561 quotation–order pairs.
Table 5.
Simulated staff-hours for customer-data updates in the selected cohort.
| Hours per update | Order-level total | Quotation-level total | Staff-hours saved |
| 1 | 114 | 37 | 77 |
| 4 | 456 | 148 | 308 |
| 8 | 912 | 296 | 616 |
Orders could go directly to ERP entry after a late update (Figure
Moving a 4-hour update ahead of preparation lengthened mean time from arrival to ERP entry by 1.7 min under the quotation rule (paired 95% confidence interval, 0.6 − 2.7 min). With a separate update for each order, the increase was 4.4 min (2.2 − 6.5 min). Completing the fields first could delay an affected order’s entry into the representative’s queue.
In an exploratory scenario, affected orders returned to the sales representative after a late quotation-level update. If the representative was busy, the returning order had to wait again. Even a return visit requiring no further work added 113 min to mean completion time across all orders relative to direct ERP entry (pointwise 95% confidence interval, 109 − 117 min). Allowing 15 min of extra preparation per returning order raised the cohort mean by another 3 min.
4.5. Sensitivity to Demand and Operating Assumptions
More frequent arrivals widened the gap in mean waiting time between the two CRM workflows. Across the 27 operating settings, the to-be workflow shortened the wait for staff under every combination of sales staffing and retry policy. Each of the 108 pointwise 95% confidence intervals for hours saved lay above zero.
With a single sales representative and a retry, the to-be workflow saved 25.1 h per lead when arrivals were 48 h apart on average. At a mean gap of 12 h, the saving rose to 718.3 h (Figure
Figure 6.
Waiting time saved by the to-be workflow as lead arrivals increase. Note. Both workflows allowed a retry, with 40% contact success per attempt and baseline task times.
Figure 6.
Waiting time saved by the to-be workflow as lead arrivals increase. Note. Both workflows allowed a retry, with 40% contact success per attempt and baseline task times.

At the higher arrival rate, each lead brought an expected 15.5 h of representative work in the to-be workflow, more time than a single representative had between arrivals on average. Adding a second representative cut the mean wait for staff from 194.6 to 9.7 h per lead. In as-is sales operations, a single employee still faced 23.3 h of work per arriving lead.
shows how much a second representative shortened time to exit across all 27 settings.
At one lead per day with a single representative and a retry, the waiting-time difference was more sensitive to task duration than to contact success over the ranges tested. Extending tasks from 75% to 125% of their baseline durations widened the waiting-time difference by 406.0 h per lead at 40% contact success. With tasks at baseline, raising the probability of reaching a customer from 20% to 60% widened the difference by 204.4 h.
Longer runs at the same daily arrival rate showed how waiting accumulated in the as-is workflow. At baseline contact success and task durations, its mean wait was 332.6 h per lead in cohorts of 500 and 406.1 h in cohorts of 1,000. With the same single representative and retry rule, the to-be means were 21.7 and 22.3 h, respectively.
If the late customer-data updates returned affected orders to a representative for completion of the customer data fields, the early entry to the ERP for each of the tested durations of repeat preparation reduced the mean time to ERP entry. These durations varied from “15” min to “8” h affected orders. When related orders shared an update, “3.9” h were saved on the morning of the early completion across all orders, while “3.8” h were saved when each order required its own update.
5. Discussion
5.1. Operational Interpretation
Sales representatives became the busiest role in ID’s redesigned workflow even though they spent fewer hours per lead. With one employee per role and a retry, representative time fell from 22.9 to 15.5 staff-hours per incoming lead. Sales operations time fell from 23.3 to 1.9. The CRM system screened every lead and sent only unclear assignments to sales operations.
With continuous cover and one retry, expected work filled one as-is sales operations position at 1.03 leads per day. A single to-be representative reached capacity at 1.55. At 2 leads per day, a second representative brought the to-be workload within capacity. In the as-is workflow, an extra representative left the intake bottleneck in place.
Using call records, Wu et al. (2026) ranked contacted leads by the likelihood of a positive outcome, such as a booked appointment. ID’s simulation tested whether to pursue a lead whose first call went unanswered. In the to-be workflow, each extra order gained through a retry required 115.6 additional staff-hours across all leads pursued. Most of that work followed a successful contact. A team planning repeat calls therefore needs time for qualification and quotation preparation.
From event records, Lashkevich et al. (2024) distinguished waits for busy staff from waits outside working hours. López-Pintado and Dumas (2025) reproduced observed cycle times more closely when they allowed staff availability and multitasking to vary. At ID, the start and end times of the shifts would be matched with the quotation-ready time to determine any gaps in cover. If queues are developing while all representatives are working then it may be worthwhile to try out overlapping shifts.
5.2. Customer Data at the CRM–ERP Handoff
The value of entering a buyer once depends on how many related orders need that buyer. In order processing, van der Aalst (2023) showed how one event can be counted repeatedly across linked records. At ID, five quotations accounted for 50 of the 77 repeat entries that reuse could avoid. A quotation with only one affected order offered no such saving.
At 4 hours per update, sharing verified details would save 308 staff-hours across the 1,561 selected orders. An extra check averaging 11.8 minutes on every order would absorb that saving. Singh and Gebauer (2024) traced pricing and delivery errors to incorrect links between customer accounts. Checking whether a buyer applies to all orders from a quotation is therefore part of the cost of reuse.
At one distributor, Božić et al. (2024) found that orders with product-data errors took longer to prepare for dispatch. At ID, the benefit of completing customer details early depended on where the order went next. With direct ERP entry, completing shared details after preparation was 1.7 minutes faster on average than completing them first. Returning affected orders to sales after a late update added 113 minutes to the cohort mean relative to direct entry, even when no further preparation was needed.
In a chemical enterprise, Vetter et al. (2024) compared initial field values with those at the first ERP save. In ID’s records, some orders from the same quotation named a buyer while others left the field blank. Comparing the quotation with each order at its first save could show which orders share a buyer and which need a separate end-customer entry.
5.3. Limitations and Transferability
The “181.3” hours per lead figure reported is for ID’s overall CRM overhaul. In the same scenario, the to-be scenario had an automated intake and significantly reduced the time spent on preparing the quotation. Staffing and retry parameters were matched between workflows using SimPy.SimPy matched the workflows for staffing and for retries. Each Arena workflow was executed with the conditions of its respective contact. Model time accounting was hand checked. The amount of time before and after the rollout would need to be comparable to measure any change in practice.
The to-be workflow shortened staff queues in all 27 operating settings tested. Each paired interval shows how precisely the mean difference was estimated under those assumptions (He & Song, 2024 ). Staff were continuously available and each task had a fixed duration. The model assigned fixed probabilities to customer response and quotation acceptance regardless of the time already spent waiting. At a fixed retry limit, a second representative therefore shortened waits while simulated order counts stayed the same.
ID’s counts of orders with an unassigned buyer describe selected records from one division. Estimating update work per incoming lead would require tracing orders back to an intake cohort that included unsuccessful leads. Whether orders shared an update and whether they returned to sales were model assumptions. Shuffling orders preserved quotation links and left the spacing of related arrivals to chance. Orders released together may wait for the same update. Where reuse is confirmed, Equation
ives the work saved using local counts of affected orders per quotation and the time per update.
For short-term forecasts, Avramenko et al. (2026) found that starting with open cases reproduced the distribution of their remaining times more closely than a simulated warm-up in 3 of 4 operational datasets. ID’s lead runs began with empty queues. Another sales team could estimate arrivals and task durations from one period of CRM records. Using a later period’s opening backlog and shift roster, it could compare simulated times to exit with those recorded for new leads followed to closure.
6. Conclusions
In ID’s sales simulation, shorter waits for staff accounted for about 44 minutes of every hour saved by the CRM redesign. In both matched staffing and retry scenarios, the mean time between lead registration and order creation or closure, before sales occurred, decreased by “181.3” hours per lead (the “95%” interval was “172.0-190.7” hours). For any customer who didn’t receive the first contact, a second attempt generated “6.7 more orders per ‘100’ leads received” in both workflows.
If related orders were to share the same customer data, then the person ordering the additional services would get one entry on the order instead of two, one for the initial order and another for the additional ones. That change saved an assumed “4” hours per update for “1,561” selected orders to give a total of “308” staff-hours. Data entered prior to order preparation reduced time to ERP entry, had a late update been made it would have returned order to sales. If the order needed to be prepared, there was a slight improvement in average time to complete the order.
Varying staffing independently of contact policy showed that a second representative shortened queues while order counts stayed the same. Most of the extra work from a retry came after the customer answered, so ID would need to reserve time for qualification and quotation preparation when scheduling follow-up calls. Orders were also correlated with their quotations to identify the region of sales operation where the maximum repetitive work can be eliminated by using a common entry.
Eligible leads could be randomly grouped into different first-contact windows using the same retry rule, and then order rates could be compared in a field trial. If a quotation contains multiple orders, a pilot could map the Buyer and End Customer to ERP and calculate the order waiting time if there are multiple orders in a single quotation.
Supplementary Materials
Three supplementary videos are publicly available on YouTube. The first demonstrates the Python/SimPy experiments in Google Colab. The second and third show the as-is and to-be Arena workflows, respectively, including the staff utilization report for each run. 1. Python/SimPy experiments in Google Colab — https://youtu.be/iacWKd8B6g8 2. As-is lead routing and staff workload in Arena — https://youtu.be/2hCN2-2tze8 3. To-be lead routing and contact retries in Arena — https://youtu.be/SkoaGuLVObw.
Author Contributions
The sole author conducted the study and wrote the manuscript.
Funding
The author received no funding for this study.
Conflicts of Interest
The author declares no conflict of interest.
Data availability
Study data are available from the author upon reasonable request.
Ethics and consent
Staff gave written informed consent before the process walkthroughs. The study reports anonymized case data.
AI use
AI tools (Grammarly AI and Gemini) were used for proofreading and improving the flow of the manuscript. The author takes full responsibility for the work.
Appendix A
As-is lead-to-order model in Arena
In Figure A18 of 100 leads closed at the duplicate check. The sales operations step labeled “Duplicate Found” handled the remaining 92. Unanswered leads closed after the first contact attempt. In this Arena run, 9 leads reached ERP order entry.
Figure A1.
As-is lead routing in Arena.

Appendix B
To-be lead-to-order model in Arena
Of the 100 leads in Figure B117 needed an ownership review and 27 reached ERP order entry. A lead could return to the contact decision, so its branches count attempts. The chance of reaching a customer per attempt was 55% in this run and 40% in the as-is run.
Figure B1.
To-be lead routing in Arena.

Appendix C
Worked checks of the lead and order models
Table C1.
Hand calculations and SimPy outputs for fixed test cases.
| Model check | Measure | By hand | SimPy |
| As-is lead reaching ERP | Time to order (h) | 172 | 172 |
| To-be lead reaching ERP | Time to order (h) | 107 | 107 |
| Two duplicate leads at intake | Mean staff wait (h) | 7 | 7 |
| Shared quotation entry | Update work (staff-hours) | 4 | 4 |
| Separate order entries | Update work (staff-hours) | 8 | 8 |
In ID’s extract, one quotation linked 13 orders with a recorded end customer and an unassigned buyer. If one verified buyer applied to all of them, updating the quotation once would avoid 12 repeat entries. At 4 hours per update, that would save 48 staff-hours.
Appendix D
How the order cohort was assembled
Table D1.
Rows retained and excluded from the order analysis.
| Worksheet row type | Rows |
| Numeric quotation and order identifiers | 14,049 |
| Subtotal | 2,313 |
| Both identifiers missing | 450 |
| Placeholder quotation identifier | 324 |
| Quotation identifier awaiting confirmation | 45 |
| Total rows below the header | 17,181 |
Appendix E
Staff utilization in the Arena runs
Figure E1.
Scheduled staff utilization in the as-is Arena run.

Figure E2.
Scheduled staff utilization in the to-be Arena run.

Appendix F
Staffing sensitivity and a simulated lead trace
With one retry allowed, each cell gives the mean time saved per incoming lead over 100 paired runs. At baseline task duration and 40% contact success, the saving rose from 6.2 to 184.9 hours as arrivals increased from half a lead to two leads per day.
Figure F1.
Mean time saved per lead by adding a second sales representative.

The trace follows one lead in the first to-be run with one representative. It had the lowest ID among leads that reached ERP entry after a second contact attempt. Waiting for qualification accounted for 32 of its 52.5 hours in staff queues.
Figure F2.
Elapsed time from lead registration to ERP entry after a contact retry.

References
- Abaddi, S. Analysis and improvement of sales management through CRM and simulation utilisation. Appl. Oper. Anal. 2025a, 1(1), 2434267. [Google Scholar] [CrossRef]
- Abaddi, S. A proposed electric/hybrid batteries recycling hub with ERP implementation and simulation. J. Simul. Advance online publication. 2025b. [Google Scholar] [CrossRef]
- Albrecht, R.; Overbeek, S.; van de Weerd, I. Designing a data quality management framework for CRM platform delivery and consultancy. SN Comput. Sci. 2023, 4(6), 742. [Google Scholar] [CrossRef]
- Avramenko, M.; Chapela-Campa, D.; Dumas, M.; Milani, F. Short-term business process simulation: Current-state initialization and uncertainty quantification. Process Sci. 2026, 3(1), 12. [Google Scholar] [CrossRef]
- Božić, D.; Živičnjak, M.; Stanković, R.; Ignjatić, A. Impact of the product master data quality on the logistics process performance. Logistics 2024, 8(2), 43. [Google Scholar] [CrossRef]
- Chapela-Campa, D.; Dumas, M. Enhancing business process simulation models with extraneous activity delays. Inf. Syst. 122 2024, 102346. [Google Scholar] [CrossRef]
- Chapela-Campa, D.; López-Pintado, O.; Suvorau, I.; Dumas, M. SIMOD: Automated discovery of business process simulation models. SoftwareX 30 2025, 102157. [Google Scholar] [CrossRef]
- Eurostat. E-businessáintegration. Statistics Explained. 2026. Available online: https://ec.europa.eu/eurostat/statistics-explained/index.php?title=E-business_integration.
- Grznár, P.; Gregor, M.; Mozol, Š.; Mozolová, L.; Krump, H.; Mizerák, M.; Trojan, J. A comprehensive analysis of sensitivity in simulation models for enhanced system understanding and optimisation. Processes 2024, 12(4), 716. [Google Scholar] [CrossRef]
- He, L.; Song, E. Introductory tutorial: Simulation optimization under input uncertainty. In Proceedings of the 2024 Winter Simulation Conference; Lam, H., Azar, E., Batur, D., Gao, S., Xie, W., Hunter, S. R., Rossetti, M. D., Eds.; IEEE, 2024; pp. 1338–1352. [Google Scholar] [CrossRef]
- Lashkevich, K.; Milani, F.; Chapela-Campa, D.; Suvorau, I.; Dumas, M. Unveiling the causes of waiting time in business processes from event logs. Inf. Syst. 2024, 126, 102434. [Google Scholar] [CrossRef]
- López-Pintado, O.; Dumas, M. Business process simulation: Probabilistic modeling of intermittent resource availability and multitasking behavior. Inf. Syst. 2025, 127, 102471. [Google Scholar] [CrossRef]
- López-Pintado, O.; Dumas, M.; Berx, J. Discovery, simulation, and optimization of business processes with differentiated resources. Inf. Syst. 120 2024, 102289. [Google Scholar] [CrossRef]
- Patel, D. S.; Asamoah, D. A.; Wamwara, W. Data management for customer relationship management: A web-based approach. Int. J. Bus. Inf. Syst. 2024, 45(3), 343–374. [Google Scholar] [CrossRef]
- Singh, J.; Gebauer, H. Clean customer master data for customer analytics: A neglected element of data monetization. Digital 2024, 4(4), 1020–1039. [Google Scholar] [CrossRef]
- van der Aalst, W. M. P. Object-centric process mining: Unraveling the fabric of real processes. Mathematics 2023, 11(12), 2691. [Google Scholar] [CrossRef]
- Vetter, S. N.; Zettl, A.; Mützel, M. M.; Tafreschi, O. Quantitative analysis of the relationship between master data quality and process quality. Proc. 26th Int. Conf. Enterp. Inf. Syst. 2024, Vol. 1, 50–60. [Google Scholar] [CrossRef]
- Wu, M.; Andreev, P.; Benyoucef, M. Profiling before scoring: A two-stage predictive model for B2B lead prioritization. J. Personal. Sell. Sales. Manag. 2026, 46(3), 313 − 329. [Google Scholar] [CrossRef]
- Zhou, H.; Dorsman, J. L.; Mandjes, M.; Snelder, M. On the use of common random numbers in activity-based travel demand modeling for scenario comparison. Transp. Plan. Technol. 2023, 46(3), 359–379. [Google Scholar] [CrossRef]
Figure 1.
Framework for the CRM–ERP simulation study.

Figure 2.
Lead-to-order routing and model settings in the controlled comparison.

Table 1.
Case evidence and model inputs.
| Input | Source | Value or use |
| Workflow steps | Process maps and training guides | Task sequence and staff responsibilities. |
| Order cohort | Selected sales extract | 1,561 distinct quotation–order pairs. |
| Customer fields | Sales extract and matched issue lists | 114 pairs from 37 quotations had no buyer assigned. The end customer was also unassigned in 67 of those pairs. |
| ERP order entry | Arena task settings | 12 h per order in the as-is workflow and 8 h in the C4C workflow. |
| Customer-data update | Scenario assumption | Tested durations ranged from 1 to 8 staff-hours per update. |
Table 2.
Simulation experiments and replications per condition.
| Experiment | Tested settings | Replications |
| Lead policies | As-is and to-be workflows, each with 1 or 2 sales representatives and a limit of 1 or 2 contact attempts per lead. | 400 |
| Order updates | Early or late completion, by quotation or by order. Each update took 1, 4 or 8 staff-hours. | 30 |
| Lead sensitivity 27 settings per policy |
Mean arrival interval of 12, 24 or 48 h Contact success probability of 20%, 40% or 60% per attempt Staffed task times at 75%, 100% or 125% of baseline |
100 |
| Cohort size | Separate runs of 500 and 1,000 leads under 4 selected policies, with a mean arrival interval of 24 h. | 30 |
| Late rework | 0, 0.25, 0.5, 1, 2, 4 or 8 h of extra preparation per affected order. Updates took 4 staff-hours under either update rule. | 30 |
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2026 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).
Copyright: This open access article is published under a Creative Commons CC BY 4.0 license, which permit the free download, distribution, and reuse, provided that the author and preprint are cited in any reuse.