Preprint
Article

This version is not peer-reviewed.

Renewable Fraction Is Not Decarbonisation: Life-Cycle Carbon Trade-Offs of Grid-Export Policies in Photovoltaic–Battery Electric Vehicle Charging Stations on a Coal-Intensive Grid

Submitted:

06 October 2026

Posted:

08 October 2026

You are already at the latest version

Abstract
Photovoltaic–battery charging stations are promoted as low-carbon charging infrastructure, yet grid-export policies may push their design towards oversized assets whose embodied carbon erodes the operational gains. This study embeds six regulatory regimes—baseline, net billing at 100% and 65%, net metering at 65% and 100%, and a carbon credit—inside a four-objective NSGA-III design loop that couples hourly dispatch, M/M/c queueing, 25-year life cycle assessment and discounted cash flow, applied to 869 measured sessions at a station in Bandar Lampung, Indonesia (grid factor 0.93 kgCO2e/kWh). Net billing and the carbon credit left the 80-design non-dominated set unchanged and acted only by re-ranking, whereas net metering reshaped it, lowering minimum storage from 17.4 to about 1 kWh. Net billing made 65 of 80 designs investable, but balanced selection promoted a 222 kWp/292 kWh design that raised the renewable fraction to 99.6% while lowering the life-cycle emission reduction from 82.3% to 61.2%, more than doubling 25-year emissions (187.5 to 409.6 tCO2e) and extending carbon payback from 4.7 to 13.0 years. Net metering made only near-storage-free designs, with reductions below 46%, investable. Renewable fraction is therefore a poor proxy for decarbonisation, and export policies should be judged on life-cycle carbon per unit of charging service.
Keywords: 
;  ;  ;  ;  ;  ;  ;  

1. Introduction

Transport electrification is a central pillar of greenhouse gas mitigation, and the pace at which it can proceed is governed less by vehicle availability than by charging infrastructure that is affordable, reliable and genuinely low in carbon [1,2]. Reviews of charging-station planning keep returning to the same unresolved questions—where infrastructure should be located, how it should be sized and under what commercial arrangements it can be financed [3,4,5,6]—and the last has proved the most stubborn, because charging assets combine high capital intensity with low and uncertain early-life utilisation [7,8]. Deployment is further complicated by distributional concerns and by technical, social and regulatory feasibility conditions that differ sharply between jurisdictions [9,10].
Where charging demand is met mostly by fossil-fuelled electricity, the environmental gain of electrification is substantially eroded: emissions are displaced from the tailpipe to the smokestack rather than eliminated [11,12]. Coupling photovoltaic (PV) generation and battery energy storage (BESS) to the charging point is the standard response, and a mature literature addresses the resulting design problem [13,14]. PV and storage capacities have been optimised for workplace charging [15,16], ultra-fast and extreme-fast charging [17,18], fleet depots under binding grid constraints [19], commercial buildings [20] and university campuses [21]; related work addresses the joint siting and sizing of distributed generation and charging stations [22,23], hubs whose grid connection is deliberately undersized [24] and the role of stationary storage in integrating high-power charging into low-carbon grids [25]. Empirical analyses of charging data have added realism by characterising arrivals, session energies and demand factors [26,27,28], and travel-behaviour models translate those patterns into spatial requirements [29]. In emerging economies with regulated tariffs, techno-economic studies report thin commercial margins even before environmental objectives are imposed [30,31].
Methodologically, the field has converged on multi-objective evolutionary search. Non-dominated sorting genetic algorithms have been applied to station placement and pricing [32], campus microgrids with charging load [33], joint allocation of charging stations and compensation devices [34] and hybrid systems in which reliability is expressed through the loss of power supply probability (LPSP) [35,36,37]. Learning-based schedulers target the same trade-offs in operation [38], and reviews of smart charging show that the value of coordination remains conditional on the tariff and remuneration regime [39,40]. With four or more objectives, reference-point-based algorithms such as NSGA-III are preferred because Pareto dominance loses discriminating power [41,42], and multi-criteria decision methods are routinely appended to compress large non-dominated sets into a recommendation [43,44,45,46,47]. Service quality has entered the objective set through queueing formulations [48], and environmental performance through life cycle assessment (LCA) of charging infrastructure and of the vehicles it serves [49,50,51].
Two gaps remain, and they interact. The first concerns regulation. In most frameworks, net metering, net billing, feed-in remuneration and carbon pricing are compared after the optimisation has converged [52,53], so a policy can alter the evaluation of designs already found but not which designs the optimiser can find. Yet the policy literature is clear that the instruments are structurally different: net metering nets exported against imported energy and modifies the cost of electricity, whereas net billing remunerates exports separately and modifies revenue [54,55,56]. Prosumer studies from the United States, Pakistan, Poland, Brazil, China and Indonesia show that the choice changes both the level and the composition of investment [57,58,59,60], and generous feed-in remuneration is known to trigger capacity rushes and oversizing [61]. The second gap concerns environmental accounting. Charging-station studies typically report the renewable energy fraction (REF) or operational emissions as the environmental indicator, although the embodied emissions of PV modules and batteries are material [62,63,64], LCA results are sensitive to system boundaries and allocation choices [11,51] and, in building PV systems, cost-optimal designs have been shown to diverge from emission-optimal ones once export is remunerated [65,66]. No study has asked whether an export policy that makes renewable charging investable also makes it cleaner over its life cycle.
The Indonesian setting sharpens both questions. The grid remains coal-dominated, with an emission factor near 0.93 kgCO2e/kWh, and its decarbonisation trajectory is contested [67,68]. Electric vehicle adoption is growing rapidly from a low base, with charging availability a binding constraint [69,70], and the regulated charging tariff sits below the levelised cost that a renewable-powered station can achieve, so the commercial case depends on how surplus generation is treated.
This study addresses both gaps with a single many-objective framework in which the regulatory mechanism enters the objective functions, so that the non-dominated set responds to policy, and the environmental objective is a 25-year life-cycle emission reduction that charges embodied carbon—including battery replacements—to the design. The contributions are fourfold. First, the framework separates instruments that reshape the design space from instruments that only re-rank it, and shows numerically which is which. Second, it separates the effect of a policy on the design space from its effect on investability, through front-wide viability counts and a decomposition that holds the design fixed. Third, it shows that the instrument that makes stations investable—net billing—steers balanced selection to an export-oriented design whose REF approaches 100% while its life-cycle emissions double and its carbon payback almost triples, even though cleaner designs are investable under the same instrument. Fourth, it grounds the analysis in 869 measured charging sessions, validates the model internally, by 20 independent runs and against HOMER Grid, and documents the load reconstruction in full.
Section 2 describes the case, the coupled models, the scenarios and the optimisation. Section 3 reports convergence, the structural classification, investability, the life-cycle carbon results, sensitivity and validation. Section 4 discusses implications and limitations, and Section 5 concludes.

2. Materials and Methods

2.1. Framework Overview

The framework couples four models inside one optimisation loop (Figure 1). An hourly dispatch model determines the flows between PV generation, BESS, the utility grid and charging demand over the 25-year horizon. An M/M/c queueing model determines the mean waiting time from arrival and service rates. An attributional LCA accounts for operational emissions and for embodied emissions of PV and BESS, including replacements. An economic model computes the levelised cost of charging (LCOC), net present value (NPV) and discounted payback. Four decision variables are optimised—PV capacity PPV (kWp), BESS capacity EBESS (kWh) and the integer numbers of alternating-current (AC) and direct-current (DC) charging points nAC and nDC—against four objectives: maximum life-cycle emission reduction relative to an internal combustion engine vehicle (ICEV) fleet, minimum LCOC, minimum lifetime LPSP and minimum mean waiting time Wq. Because the regulatory mechanism enters the objective functions, the Pareto set is itself a function of policy.

2.2. Case Study and Demand Data

The case study is a grid-connected PV–BESS charging station at ELS Coffee, Bandar Lampung, Indonesia. Demand is derived from 900 measured charging transactions recorded between 3 July 2023 and 31 August 2024, each with timestamp, delivered energy and session duration. The analysis uses the last complete twelve months, 1 September 2023 to 31 August 2024, comprising 869 sessions (Table 1). The station is idle for most of the year and serves a small number of high-power sessions, a pattern characteristic of hospitality sites and early-stage public charging, precisely the regime in which capital recovery is hardest [27,70].

2.3. Construction of the Hourly Load Profile

Each session s with delivered energy Es and duration Ds is distributed across the hours it spans in proportion to the fraction of each hour occupied:
E s , h = E s D s   Δ t s , h ,     ∑ h Δ t s , h = D s ,
where Δts,h is the overlap between session s and hour h. The hourly station power is
P h = ∑ s E s , h Δ t h ,     Δ t h = 1   h .
Assigning the full mean power to every hour a session touches inflates energy, because a 0.5 h session crossing an hour boundary is counted twice. Defining the inflation factor
φ = E i n c o r r e c t E c o r r e c t ,
the present data give φ = 3.28 on annual energy and 4.95 on peak demand: the incorrect method yields 49,345 kWh with a 471.1 kW peak from records that contain 17,030 kWh with a 95.2 kW peak. Because peak demand determines charger counts, and one DC charger costs IDR 500 million, such an error propagates directly into capital cost [26,28]. Proportional allocation reproduces the 95.19 kW hourly maximum computed directly from the raw records, and the resulting PV performance ratio is 88.42%.

2.4. Demand Growth and Utilisation

Demand over the 25-year horizon grows additively relative to the measured Year-1 baseline rather than compounding on the previous year,
E y = E 1 1 + ∑ k = 2 y g k ,     g k = 0.20 , k ≤ 5 0.10 , 6 ≤ k ≤ 10 0.05 , k ≥ 11
which raises annual demand from 17.0 MWh in Year 1 to about 52 MWh in Year 25 (987.7 MWh over the horizon). The growth is conservative relative to observation—monthly sessions rose from 20 in July 2023 to 177 in August 2024—and consistent with adoption modelling for Indonesia [69]. Future demand is temporally diversified: a share of the added energy (diversity strength 0.75) is redistributed according to the empirical time-of-day profile, so that the peak does not grow in proportion to volume [26,28]. A utilisation factor u scales the number of transactions, not the power of each, so that additional arrivals fill idle hours rather than stacking onto occupied ones; at u = 4, profile multiplication would give a 380.8 kW peak against 118.2 kW when transactions are added. Additional sessions are generated by resampling measured (duration, energy) pairs at the measured hour-of-day distribution.

2.5. Energy Dispatch Model

The dispatch model runs 8760 hourly steps for sample years and interpolates annual quantities across the horizon. PV output is computed from measured irradiance with temperature derating and linear degradation d = 0.5%/year:
P P V h , y = P P V , r   G h G S T C   1 + γ   T c h − T S T C   η s y s   1 − d   y − 1 ,
with GSTC = 1000 W/m2, γ = −0.004 /°C, TSTC = 25 °C and ηsys = 0.90. Surplus generation charges the BESS within efficiency and capacity limits; the remainder is exported where the regulatory regime permits and curtailed otherwise. Deficits are met first from the BESS, subject to an 80% depth of discharge and a 0.8 C-rate, and then from the grid, subject to the contracted 66 kW import limit. The state of charge evolves as
S O C h + 1 = S O C h + η c h P c h h − P d i s h η d i s Δ t E B E S S ,
with ηch = ηdis = 0.95. Curtailed and exported energy are recorded explicitly, as is now standard in grid-constrained charging studies [19,24]. Accepted demand is capped by the installed charger rating; the lifetime reliability metric is
L P S P = ∑ y = 1 25 ∑ h = 1 8760 E u n m e t , y , h ∑ y = 1 25 ∑ h = 1 8760 E a c c , y , h ,
which is the conventional definition used in hybrid renewable system sizing [35,36].

2.6. Queueing Model

Waiting time is obtained from an M/M/c model in which arrivals are split between AC and DC subsystems (DC share fDC = 0.30, with 0.20–0.40 as sensitivity), each with c servers, arrival rate λ and service rate μ = Pcharger/EEV, where EEV = 19.6 kWh is the measured mean session energy and the charger ratings are 22 kW (AC) and 150 kW (DC). To keep the objective sensitive to service capacity at a site that is idle most of the time, the design arrival rate is the 95th percentile of the hourly arrival profile in the design year (Year 25). With
a = λ μ ,     ρ = λ c μ < 1 ,
the probability of waiting is given by the Erlang C formula,
C c , a = a c c !   1 − ρ ∑ k = 0 c − 1 a k k ! + a c c !   1 − ρ ,
from which
W q = C c , a c μ − λ ,     W ¯ q = λ A C W q , A C + λ D C W q , D C λ A C + λ D C .
Configurations with ρ ≥ 0.99 in either subsystem are assigned a finite upper bound so that the objective remains bounded, and a design is feasible only if W̄q ≤ 0.1 h, the treatment recommended when quality of service is a design constraint [48].

2.7. Life Cycle Assessment and Carbon Payback

The functional unit is the charging service for the full requested demand over 25 years (987.7 MWh at u = 1). Following attributional practice for charging infrastructure [49,50,64], the life-cycle emissions of the hybrid station are
G H G h y b = E F g r i d ∑ y = 1 25 E g r i d , y + e P V P P V + ∑ r = 0 N r e p e B E S S E B E S S ,
where EFgrid = 0.93 kgCO2e/kWh, ePV = 1500 kgCO2e/kWp over a 25-year life [62] and eBESS = 100 kgCO2e/kWh over a 10-year life [63], so that the battery is replaced in Years 10 and 20 and each replacement is recorded when it occurs. Charging infrastructure is common to all designs and excluded. Two references are evaluated for the same functional unit,
G H G g r i d = E F g r i d ∑ y = 1 25 E l o a d , y ,     G H G I C E V = E F f u e l η I C E V   e E V ∑ y = 1 25 E l o a d , y ,
with eEV = 0.18 kWh/km, ηICEV = 12 km/L and EFfuel = 2.31 kgCO2/L. The environmental objective is
E R I C E V = 1 − G H G h y b G H G I C E V ,
and the reduction relative to a grid-only station, ERgrid, is reported as a secondary benchmark. Because the denominator is fixed by the requested load rather than by the energy actually served, designs cannot improve their score by leaving demand unserved. Exported energy receives no avoided-emission credit in any scenario, a conservative choice that avoids double counting with the grid operator [11,65]. The carbon payback time is the first year t in which the cumulative avoided operational emissions offset the initial embodied emissions,
∑ y = 1 t G H G r e f , y − G H G o p , y   ≥   G H G e m b , 0 .
The REF—the share of served energy not drawn from the grid—is reported as a diagnostic, not as an objective.

2.8. Economic Model and Policy Scenarios

The LCOC is the ratio of discounted lifetime cost to discounted energy served,
L C O C = C A P E X + ∑ t = 1 T O P E X t + C g r i d , t + C r e p , t 1 + r t ∑ t = 1 T E s e r v e d , t 1 + r t ,
with discount rate r = 5% and T = 25 years. Export and carbon revenues are excluded from the LCOC by construction and enter the NPV,
N P V = − C A P E X + ∑ t = 1 T C F t 1 + r t + S V 1 + r T ,
where CFt = Rserv,t + Rexp,t + RC,t − OPEXt − Cgrid,t − Crep,t is the annual net cash flow from charging service, export and carbon revenue less operating, grid and replacement costs, and SV is the salvage value. Discounted payback is the first year in which cumulative discounted cash flow recovers CAPEX; designs that do not recover it within 25 years are recorded as never paying back. The two export instruments differ in where they enter the accounting. Under net billing (NB) the grid cost and the export revenue are separate,
C g r i d , t = p b u y E i m p , t ,     R e x p , t = κ   p b u y E e x p , t ,
whereas under net metering (NM) exports are netted against imports inside the cost term,
C g r i d , t = p b u y m a x 0 ,   E i m p , t − α E e x p , t ,     R e x p , t = 0 .
Equation (17) modifies only the NPV, which is not a search objective, whereas Equation (18) modifies Cgrid,t and therefore the LCOC (Equation (15)) that the optimiser minimises. The carbon credit pays pC = IDR 50,000/tCO2 on annual emissions avoided relative to the ICEV reference and also enters only the NPV, mirroring the distinction between cost-side and revenue-side instruments in the prosumer literature [54,56,59]. The six scenarios are defined in Table 2 and the principal parameters in Table 3; capital costs reflect Indonesian quotations and tariffs follow national values [60,67].

2.9. Optimisation and Compromise Selection

The design problem is
m i n x   F x = − E R I C E V x ,   L C O C x ,   L P S P x ,   W ¯ q x ,     x = P P V , E B E S S , n A C , n D C ,
subject to the dispatch and queueing constraints, 1 ≤ PPV ≤ 300 kWp, 1 ≤ EBESS ≤ 300 kWh, nAC, nDC ≥ 1, total charger rating ≤ 350 kW, LPSP ≤ 0.10 and W̄q ≤ 0.1 h. NSGA-III is configured with 165 individuals, matching the Das–Dennis reference directions for M = 4 objectives and p = 8 divisions,
H = M + p − 1 p = 11 8 = 165 ,
simulated binary crossover (ηc = 30, pc = 1.0), polynomial mutation (ηm = 20, pm = 1/4) and feasibility-first dominance, evolved for 100 generations [41,42]. Every non-dominated feasible design found during the run is kept in a cumulative archive, from which a 165-member representative set is drawn by reference-direction niching; after final feasibility screening and removal of duplicate configurations, this set is the candidate set ranked by TOPSIS.
Compromise selection uses TOPSIS with equal weights (0.20) over five criteria: ERICEV and NPV as benefits and LCOC, LPSP and W̄q as costs. Because TOPSIS is applied after optimisation, including NPV as a fifth criterion does not alter the search; it is reported explicitly because it is precisely the channel through which revenue-side instruments act. The relative closeness of alternative i is
C C i = d i − d i + + d i − ,
with di+ and di− the distances to the positive and negative ideal solutions in the normalised, weighted criterion space [45,46]. Beyond the compromise design, two front-wide indicators are reported for every scenario: the number of designs with NPV ≥ 0 (viable designs) and their environmental quality.

2.10. Verification, Robustness and External Benchmark

Model verification uses an automated audit of 17 checks covering objective direction, queue stability, decision bounds, energy-balance identities, LCA identities and re-evaluation of the objectives from the archived designs. Robustness is assessed by 20 independent runs of S2 with different random seeds, reporting hypervolume (reference point 1.10 on each normalised axis) and inverted generational distance (IGD). External consistency is assessed against HOMER Grid for S2 in a controlled benchmark with a fixed architecture (100 kWp, 200 kWh, five AC and one DC charger, no demand growth, 0.5%/year PV degradation) and by comparing the respective optima.

2.11. Use of Generative Artificial Intelligence

During preparation of this manuscript the authors used Claude (Anthropic) to assist with language editing, restructuring of the text and preparation of figures from the authors’ own simulation outputs. All numerical results were produced by the authors’ MATLAB model, and the authors reviewed and edited all output and take full responsibility for the content of this publication.

3. Results

3.1. Convergence, Verification and Robustness

The hypervolume of the cumulative archive rises from 1.3107 to 1.3582 (+3.62%), reaches 99% of its final value at generation 9 and 99.5% at generation 15, and gains only 0.022% over the last 20 generations, while the archive grows to 2201 non-dominated designs (Figure 2). The population hypervolume fluctuates below the archive value, as expected when niching preserves diversity across four objectives. All 17 audit checks pass, with a maximum lifetime energy-balance error of 1.3 × 10−9 kWh and LCA identity errors below 3.5 × 10−10 kgCO2e. Across 20 independent runs the final hypervolume is 1.3480 ± 0.0027 (coefficient of variation 0.20%) and the IGD 0.0051 ± 0.0004, so the reported fronts are reproducible rather than artefacts of a single seed.
The decision variables do not saturate their bounds in the baseline candidate set: PV spans 12.5–226.1 kWp and BESS 17.4–300.0 kWh, and all four objectives are active. LCOC spans IDR 2804.97–9998.62/kWh, ERICEV 44.77–83.66%, lifetime LPSP 1.6 × 10−4–1.2 × 10−2 and W̄q 0.0023–0.0229 h (0.14–1.38 min). Across the front, PV capacity correlates strongly with LCOC (Spearman ρ = 0.96), LPSP (−0.96) and REF (0.97), but only weakly with ERICEV (0.35), a first indication that adding renewable capacity and reducing life-cycle emissions are different things.

3.2. Baseline Compromise and the Curtailment Problem

The baseline compromise comprises 57.07 kWp of PV, 130.29 kWh of storage, eight AC and one DC charger. It achieves an LCOC of IDR 4230.62/kWh, a lifetime LPSP of 0.0022, a mean wait of 0.0023 h (8.4 s), ERICEV = 82.25% (ERgrid = 79.58%) and an REF of 92.4%. Its 25-year emissions are 187.5 tCO2e—118.2 t embodied, including two battery replacements, and 69.4 t operational—against 918.6 tCO2e for a grid-only station and 1056.3 tCO2e for an equivalent ICEV fleet, and its embodied carbon is repaid in 4.7 years relative to the grid-only station. Economically, however, it fails: NPV is −IDR 899.26 million and payback is never reached, and no design among the 80 candidates achieves NPV ≥ 0, because the lowest attainable LCOC (IDR 2804.97/kWh) exceeds the regulated service tariff of IDR 2466/kWh. The mechanism is visible in the Year-1 energy balance: the compromise generates 94.3 MWh of PV energy but can use only 17.4 MWh (18.5%) for charging, so 76.9 MWh (81.5%) is curtailed. Under the baseline regime the asset that would repay the investment produces energy that has neither economic nor environmental value—the low-utilisation trap described for early-stage public charging [7,70].

3.3. Two Structural Classes of Policy Effect

Comparing complete candidate sets rather than compromise designs yields the classification in Table 4. Under net billing at either compensation level and under the carbon credit, the candidate set is identical to the baseline set: the same 80 configurations with a maximum absolute deviation of exactly zero in every design variable and every objective, and an identical hypervolume trajectory. This is the expected consequence of Equation (17): the instrument enters only the NPV, so the search is untouched (Class II, re-ranking only).
Under net metering the Pareto set itself changes: none of the 79 (S5) or 76 (S6) candidates coincides with a baseline design, the smallest storage on the front falls from 17.4 kWh to about 1 kWh, and the minimum attainable LCOC falls from IDR 2804.97 to 2201.49/kWh at 65% and to 1987.92/kWh at 100% compensation (Figure 3). Low-storage, grid-dependent configurations absent from the baseline become non-dominated—the structural signature of a virtual battery, in which the grid substitutes for physical storage through Equation (18), anticipated qualitatively in the prosumer literature [54,55] but demonstrated here inside an engineering optimisation. The front extent and the selected design must nevertheless be kept apart: balanced TOPSIS selection under net metering still returns 120.05 kWh (S5) and 126.35 kWh (S6) of storage, only moderately below the baseline 130.29 kWh.

3.4. Investability Does Not Follow the Structural Class

Table 5 reports the compromise design of each scenario together with front-wide viability. The two classifications do not coincide. Net billing at 100%, which changes no design at all, converts a front on which nothing is worth building into one on which 65 of 80 designs pay back; at 65% compensation 8 of 80 remain viable. Net metering, which visibly reshapes the design space, makes only 5 designs viable in each case and leaves its own compromise design unviable (NPV −IDR 718.26 and −700.73 million). The carbon credit is inert: the compromise is identical to the baseline and NPV improves by only IDR 22.36 million (2.5%), from −899.26 to −876.90 million.
The quality of what each instrument makes viable differs sharply (Figure 4). Under net billing at 100% the viable subset is broad and environmentally strong: mean ERICEV 77.5%, best 83.7%, mean storage 167.7 kWh, and it includes the best-ranked design. Under net metering every viable design is a near-storage-free configuration (mean BESS 1.4 kWh at 65% and 1.0 kWh at 100%) with ERICEV of only 45.0% and 42.6% and lifetime LPSP of about 0.011–0.012; the best multi-criteria rank among them is 75 of 79 and 69 of 76. In a grid with an emission factor of 0.93 kgCO2e/kWh, substituting grid import for storage is environmentally costly in a way that would not appear in a low-carbon grid [67,71].
The mechanism is isolated by a decomposition that holds the design fixed while changing only the valuation regime (Table 6). Enlarging the installation from the baseline compromise to the net-billing compromise, valued under baseline rules, raises LCOC by IDR 5621/kWh, lowers NPV by IDR 2.87 billion and lowers ERICEV by 21.0 percentage points. Applying net billing to the physically identical large design changes LCOC and ERICEV by exactly zero and adds IDR 7.47 billion of NPV. Re-ranking is equally sharp: the baseline compromise falls to rank 18 under net billing, whereas the design that net billing selects ranked 71st of 80 under the baseline. The large export-oriented design is not a design the policy created; it already existed on the baseline front and the policy promoted it.

3.5. Renewable Fraction Versus Life-Cycle Carbon

The environmental consequence of net billing is the central result of this study. The net-billing compromise raises the REF from 92.4% to 99.6% and reduces operational emissions from 69.4 to 3.5 tCO2e over 25 years, yet its life-cycle emissions rise from 187.5 to 409.6 tCO2e because embodied emissions rise from 118.2 to 406.2 tCO2e (Figure 5). Life-cycle reduction relative to the ICEV fleet therefore falls from 82.3% to 61.2%, and relative to a grid-only station from 79.6% to 55.4%; the carbon payback lengthens from 4.7 to 13.0 years. In Year 1 the design generates 367.2 MWh of PV energy, of which only 17.8 MWh (4.9%) charges vehicles and 349.3 MWh (95.1%) is exported. Because exported energy earns no avoided-emission credit, the additional 165 kWp of PV and 162 kWh of storage serve the export market rather than the charging service whose emissions are being assessed. The station has, in effect, become a small power plant with a charger attached.
Across the baseline front, REF and ERICEV are only weakly related (Spearman ρ = 0.37; Figure 6). Reduction rises with REF up to about 95% and then falls, because the last increments of renewable share require storage and PV whose embodied carbon exceeds the grid emissions they displace. The design with the highest reduction on the front (56.46 kWp, 178.70 kWh, ERICEV 83.66%, REF 95.3%) and a design with near-maximal REF (201.44 kWp, 299.99 kWh, REF 99.6%, ERICEV 64.0%) are distinct. Crucially, under net billing at 100% the highest-reduction design is itself investable (NPV +IDR 280.3 million, payback 18.3 years, 25-year emissions 172.6 tCO2e), and so is the baseline compromise (NPV +IDR 404.2 million; Table 6, row D). Net billing therefore does not force the environmental loss; balanced selection with NPV as an equally weighted criterion chooses it, because export revenue rises monotonically with oversizing while life-cycle reduction does not.
Net metering behaves differently. Its compromise designs keep the life-cycle profile of the baseline—195.2 and 190.4 tCO2e, ERICEV 81.5% and 82.0%, carbon payback about 4.5 years—because the instrument rewards only the import offset of a modest surplus (70.6 and 72.3 MWh exported in Year 1, no curtailment). Its environmental risk lies elsewhere: the designs it makes investable are the grid-dependent corner of the reshaped front, with life-cycle reductions below 46%.

3.6. Energy Flows and Service Quality

Table 7 reconciles the Year-1 requested demand of each compromise design. In every scenario PV and storage supply 96–100% of charging energy, grid import is at most 3.5% and unmet energy at most 0.09%. Service quality is preserved throughout: mean waiting time stays below 10 s at u = 1 and below 0.6 min at u = 3.5, because the queue is governed by the integer charger counts and the single DC charger rather than by the energy system [48]. The environmental differences between scenarios are therefore not explained by how charging demand is met, which is nearly identical, but by how much capacity is built beyond it.

3.7. Response to Compensation Level

Increasing compensation acts in opposite directions in the two instruments. Under net billing, raising κ from 0.65 to 1.00 leaves the compromise design and its life-cycle emissions unchanged but raises NPV from IDR 1086.31 to 3701.73 million, shortens payback from 16.28 to 8.38 years and expands the viable subset from 8 to 65 designs, so stronger remuneration increasingly rewards the export-oriented corner of the front. Under net metering, raising α from 0.65 to 1.00 improves the compromise NPV by only IDR 17.53 million, leaves the number of viable designs at five and lowers the best reduction among viable designs from 45.1% to 42.6%. Neither instrument, at any tested level, makes the environmentally best region of the front the economically preferred one.

3.8. Sensitivity to Utilisation

Raising utilisation to u = 3.5, implemented as 3.5 times the transaction count in line with Section 2.4, changes the picture without any policy intervention (Table 5, last column). Thirty-two of 46 candidates become viable, and the compromise (132.18 kWp, 281.76 kWh, seven AC and one DC charger) reaches payback in 21.44 years with LCOC IDR 2188.61/kWh and NPV +IDR 493.08 million. Unlike net billing, higher utilisation aligns economic and environmental objectives: ERICEV rises to 86.1% (ERgrid 84.0%), the carbon payback shortens to 3.3 years and the viable designs achieve a mean reduction of 84.7% (best 87.3%). Self-utilisation of PV energy rises from 18.5% to 28.4%, so the same embodied carbon is amortised over more charging service. The cost is a modest loss of service quality (LPSP 0.0067, mean wait 0.58 min), still well inside the feasibility limits.

3.9. External Benchmark

In the controlled HOMER Grid benchmark (S2, 100 kWp, 200 kWh), annual PV production is 155.4 MWh in the present model against 148.7 MWh in HOMER, renewable fraction 99.2% against 99.8%, grid sales 137.6 against 129.7 MWh/year, and the incremental discounted payback 8.58 against 8.60 years. The economic optimum found by HOMER for the same tariff is 300 kWp of PV with no storage, exporting 434.7 MWh/year with a 5.9-year payback. Single-objective economic optimisation under full export remuneration thus drives sizing to the upper PV bound, confirming independently the oversizing incentive that the many-objective framework exposes and that is reported for feed-in tariff regimes elsewhere [61].

4. Discussion

The framework was built to answer whether a policy changes the engineering optimum or only the ranking of an unchanged design space, and it answers cleanly: net billing and the carbon credit leave the Pareto set identical to the last bit, whereas net metering reshapes it. The more consequential findings concern what this classification does not tell a planner. Under the baseline regime not one of 80 non-dominated designs pays back. Net billing changes that for most designs without altering any design variable, whereas net metering reshapes the design space conspicuously yet makes investable only the designs with almost no storage and the worst environmental performance. Studies that compare instruments on adoption counts alone would miss this asymmetry, because both instruments increase investment; what differs is the composition of what gets built [57,58,60].
The environmental finding sharpens this conclusion. The instrument that makes renewable charging investable also, when combined with a balanced decision rule that values NPV, steers the selected design to an export-oriented configuration whose REF approaches 100% while its 25-year emissions more than double and its carbon payback almost triples. This is not a modelling artefact of embodied-carbon factors: the same front contains designs with 82–84% reduction that are investable under net billing (Table 6, row D; Section 3.5). The result echoes findings for building PV that cost-optimal designs under export remuneration maximise total production while emission-optimal designs favour self-consumption [65], that economically and environmentally optimal residential PV–battery sizes diverge [66], and that the carbon impact of PV-powered charging stations is dominated by the PV system itself [64]. It also reframes the long-standing observation that feed-in remuneration triggers capacity rushes [61]: in a charging station the rush is not merely a fiscal cost but a life-cycle carbon cost.
There is a corresponding tension between investor, consumer and environment. Net billing raises the levelised cost borne by users from IDR 4230.62 to 9851.81/kWh because the additional capital is not offset on the cost side—export revenue enters NPV but not LCOC, as Equations (15) and (16) make explicit—while lowering life-cycle reduction by 21 percentage points. A regulator choosing between instruments is therefore choosing between a cheaper and cleaner station that will not be built and a dearer, more grid-exporting station that will, unless the instrument or the decision rule is redesigned. Two corrections follow directly from the results. First, remuneration can be tied to the charging service rather than to export, for example by capping eligible export relative to charging demand or by remunerating self-consumed renewable charging; at the reference compensation level the baseline compromise remains investable (NPV +IDR 404 million) while keeping its 82% reduction. Second, project appraisal and public support can be conditioned on life-cycle carbon per kilowatt-hour delivered to vehicles rather than on renewable fraction or installed kWp, since the two diverge exactly where policy pushes designs (ρ = 0.37). Carbon pricing at the level currently contemplated in Indonesia does neither: at IDR 50,000/tCO2 the credit moves NPV by 2.5% and changes no design.
For the coal-intensive Indonesian grid, net metering carries a different risk. Its compromise designs are as clean as the baseline, but the designs it makes investable substitute grid import for storage, and with an emission factor of 0.93 kgCO2e/kWh that substitution forfeits roughly half of the achievable reduction. Its desirability is therefore conditioned by the pace of grid decarbonisation [67,68]. Utilisation, finally, is the only lever in this study that improves economic and environmental performance together: at 3.5 times the measured demand the station is investable without intervention and its reduction rises to 86%. Policies that accelerate adoption and concentrate demand at existing stations [69,70] may thus do more for both investability and decarbonisation than export remuneration.
Methodologically, reporting only compromise designs, as is common in charging-infrastructure optimisation [32,33,43], would have concealed all of this. The large configuration selected under net billing was already on the baseline front and was promoted from rank 71 to rank 1; conversely, counting viable designs is what reveals that net metering’s reshaping of the design space is not accompanied by investability. Front-wide viability counts and life-cycle carbon of the viable subset are inexpensive to compute and should be reported alongside compromise designs. Three points of positioning follow. Frameworks that treat policy as a post-optimisation scenario [52,53] cannot distinguish the two structural classes because their design space is fixed by construction; frameworks that adopt service or life-cycle objectives but evaluate them at a single operating point [48,49] cannot observe the compositional shift; and frameworks that report REF or operational emissions instead of life-cycle carbon [13,23] cannot observe the environmental cost of export-oriented oversizing. The divergence reported here follows from which term of the economic model an instrument enters and which emissions the environmental metric counts, so it should appear in any framework that distinguishes cost-side from revenue-side instruments and charges embodied carbon to the design. Grid-interactive operation and coordinated charging could further shift these trade-offs [39,71,72].

4.1. Limitations

Demand growth is deterministic, and structural change in charging behaviour over 25 years is not modelled, although empirical evidence indicates that it occurs [26,70]. Exported energy receives no emission credit; crediting displaced grid generation at 0.93 kgCO2e/kWh would favour export-oriented designs, but such credit would be double-counted with the grid operator and would shrink as the grid decarbonises, and its treatment remains a matter of allocation [11,65]. Embodied emission factors are fixed at literature values and the grid emission factor is constant; declining PV and battery footprints and a decarbonising grid would both narrow the gap reported here, in opposite directions for different scenarios. Battery degradation is represented through a fixed ten-year replacement rather than a state-dependent ageing model, which, if anything, understates the cost and carbon of storage-rich designs [63,73]. The station is not permitted to expand in stages over the horizon [72], and results are conditioned on a single site with a load factor of 2.04%. The structural classification depends only on which term an instrument enters and is therefore expected to generalise; the magnitudes of investability and carbon trade-offs are site- and grid-dependent.

5. Conclusions

A policy-embedded many-objective design framework integrating hourly dispatch, M/M/c queueing, 25-year life cycle assessment and discounted cash flow was applied to a PV–BESS charging station in Bandar Lampung, Indonesia, using 869 measured charging sessions under six regulatory regimes. The main conclusions are as follows.
(1) Energy-policy instruments fall into two structural classes. Net billing and the carbon credit leave the 80-design non-dominated set unchanged to a maximum absolute deviation of zero and act only by re-ranking; net metering enters the cost objective and reshapes the set, lowering minimum storage from 17.4 kWh to about 1 kWh and minimum LCOC from IDR 2804.97 to 1987.92/kWh.
(2) The classification does not predict investability. No baseline design pays back; net billing at 100% makes 65 of 80 designs viable and its compromise pays back in 8.4 years, whereas net metering makes only five near-storage-free designs viable, with life-cycle reductions below 46%, and leaves its own compromise unviable. A carbon credit of IDR 50,000/tCO2 changes no design and improves NPV by 2.5%.
(3) Renewable fraction is not decarbonisation. The net-billing compromise raises REF from 92.4% to 99.6% but, because 95% of its PV output is exported and its embodied emissions rise from 118 to 406 tCO2e, its life-cycle reduction falls from 82.3% to 61.2% relative to an ICEV fleet, its 25-year emissions rise from 187.5 to 409.6 tCO2e and its carbon payback lengthens from 4.7 to 13.0 years. Cleaner designs with 82–84% reduction remain investable under the same instrument.
(4) Higher utilisation is the only lever that aligns economic and environmental performance: at 3.5 times the measured demand the station is investable without intervention, with 86% reduction and a 3.3-year carbon payback.
Export policies for renewable charging infrastructure should therefore be evaluated by which designs they make worth building and by the life-cycle carbon of those designs per unit of charging service, not by whether the optimum moves or by the renewable fraction it achieves. Future work should incorporate uncertainty in tariffs, demand, solar resource and grid decarbonisation; represent staged capacity expansion and state-dependent battery ageing; test export caps and service-linked remuneration explicitly inside the optimisation loop; and examine whether the divergence between investability and life-cycle carbon persists across sites with different load factors and grid emission intensities.

Author Contributions

Conceptualization, H.G. and A.S.S.; methodology, H.G. and A.S.S.; software, H.G.; validation, H.G., A.S.S. and D.D.; formal analysis, H.G. and F.D.; investigation, H.G.; data curation, H.G.; writing—original draft preparation, H.G.; writing—review and editing, A.S.S., D.D. and F.D.; visualization, H.G.; supervision, A.S.S. and D.D. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Data Availability Statement

The charging transaction records, hourly input profiles, optimisation source code and complete result sets supporting the findings are available from the corresponding author on reasonable request.

Acknowledgments

The authors thank ELS Coffee, Bandar Lampung, for providing the charging transaction records used in this study. During the preparation of this manuscript, the authors used Claude (Anthropic) for language editing and figure preparation. The authors have reviewed and edited the output and take full responsibility for the content of this publication.

Conflicts of Interest

The authors declare no conflicts of interest.

Abbreviations

The following abbreviations are used in this manuscript:
AC Alternating current
BESS Battery energy storage system
CAPEX Capital expenditure
DC Direct current
ER Life-cycle emission reduction
EV Electric vehicle
HV Hypervolume
ICEV Internal combustion engine vehicle
IGD Inverted generational distance
LCA Life cycle assessment
LCOC Levelised cost of charging
LPSP Loss of power supply probability
NB Net billing
NM Net metering
NPV Net present value
NSGA-III Non-dominated sorting genetic algorithm III
O&M Operation and maintenance
PV Photovoltaic
REF Renewable energy fraction
TOPSIS Technique for order of preference by similarity to ideal solution

References

  1. LaMonaca, S.; Ryan, L. The state of play in electric vehicle charging services – A review of infrastructure provision, players, and policies. Renew. Sustain. Energy Rev. 2022, 154, 111733. [Google Scholar] [CrossRef]
  2. Unterluggauer, T.; Rich, J.; Andersen, P.B.; Hashemi, S. Electric vehicle charging infrastructure planning for integrated transportation and power distribution networks: A review. eTransportation 2022, 12, 100163. [Google Scholar] [CrossRef]
  3. Ghanbari Motlagh, S.; Li, L. A review on electric vehicle charging station planning: Infrastructure placement, sizing, upgrades, and uncertainties. J. Energy Storage 2026, 141, 119325. [Google Scholar] [CrossRef]
  4. Ghanbari Motlagh, S.; Oladigbolu, J.; Li, L. A review on electric vehicle charging station operation considering market dynamics and grid interaction. Appl. Energy 2025, 392, 126058. [Google Scholar] [CrossRef]
  5. Metais, M.O.; Jouini, O.; Perez, Y.; Berrada, J.; Suomalainen, E. Too much or not enough? Planning electric vehicle charging infrastructure: A review of modeling options. Renew. Sustain. Energy Rev. 2022, 153, 111719. [Google Scholar] [CrossRef]
  6. Ahmad, F.; Iqbal, A.; Ashraf, I.; Marzband, M.; Khan, I. Optimal location of electric vehicle charging station and its impact on distribution network: A review. Energy Rep. 2022, 8, 2314–2333. [Google Scholar] [CrossRef]
  7. Anggraini, D.; Amelin, M.; Söder, L. Business models for electric vehicle charging considering grid limitations: An extended review from the European electricity market perspective. Appl. Energy 2025, 399, 126493. [Google Scholar] [CrossRef]
  8. Mastoi, M.S.; Zhuang, S.; Munir, H.M.; Haris, M.; Hassan, M.; Usman, M.; Bukhari, S.S.H.; Ro, J.-S. An in-depth analysis of electric vehicle charging station infrastructure, policy implications, and future trends. Energy Rep. 2022, 8, 11504–11529. [Google Scholar] [CrossRef]
  9. Varghese, A.M.; Menon, N.; Ermagun, A. Equitable distribution of electric vehicle charging infrastructure: A systematic review. Renew. Sustain. Energy Rev. 2024, 206, 114825. [Google Scholar] [CrossRef]
  10. Christensen, K.; Ma, Z.G.; Jørgensen, B.N. A scoping review on electric vehicle charging strategies with a technical, social, and regulatory feasibility evaluation. Renew. Sustain. Energy Rev. 2025, 211, 115300. [Google Scholar] [CrossRef]
  11. Rüdisüli, M.; Bach, C.; Bauer, C.; Beloin-Saint-Pierre, D.; Elber, U.; Georges, G.; Limpach, R.; Pareschi, G.; Kannan, R.; Teske, S.L. Prospective life-cycle assessment of greenhouse gas emissions of electricity-based mobility options. Appl. Energy 2022, 306, 118065. [Google Scholar] [CrossRef]
  12. Andersson, Ö.; Börjesson, P. The greenhouse gas emissions of an electrified vehicle combined with renewable fuels: Life cycle assessment and policy implications. Appl. Energy 2021, 289, 116621. [Google Scholar] [CrossRef]
  13. Yap, K.Y.; Chin, H.H.; Klemeš, J.J. Solar Energy-Powered Battery Electric Vehicle charging stations: Current development and future prospect review. Renew. Sustain. Energy Rev. 2022, 169, 112862. [Google Scholar] [CrossRef]
  14. Deshmukh, S.S.; Pearce, J.M. Electric vehicle charging potential from retail parking lot solar photovoltaic awnings. Renew. Energy 2021, 169, 608–617. [Google Scholar] [CrossRef]
  15. Fachrizal, R.; Shepero, M.; Åberg, M.; Munkhammar, J. Optimal PV-EV sizing at solar powered workplace charging stations with smart charging schemes considering self-consumption and self-sufficiency balance. Appl. Energy 2022, 307, 118139. [Google Scholar] [CrossRef]
  16. Amry, Y.; Elbouchikhi, E.; Le Gall, F.; Ghogho, M.; El Hani, S. Optimal sizing and energy management strategy for EV workplace charging station considering PV and flywheel energy storage system. J. Energy Storage 2023, 62, 106937. [Google Scholar] [CrossRef]
  17. Leone, C.; Peretti, C.; Paris, A.; Longo, M. Photovoltaic and battery systems sizing optimization for ultra-fast charging station integration. J. Energy Storage 2022, 52, 104995. [Google Scholar] [CrossRef]
  18. Rehman, W.U.; Bo, R.; Mehdipourpicha, H.; Kimball, J.W. Sizing battery energy storage and PV system in an extreme fast charging station considering uncertainties and battery degradation. Appl. Energy 2022, 313, 118745. [Google Scholar] [CrossRef]
  19. Hull, C.; Wust, J.; Booysen, M.J.; McCulloch, M.D. Techno-economic optimization and assessment of solar-battery charging station under grid constraints with varying levels of fleet EV penetration. Appl. Energy 2024, 374, 123990. [Google Scholar] [CrossRef]
  20. Natarajan, S.; Rajan Singaravel, M.M.; Alsenani, T.R. Optimal sizing of solar PV-wind systems, battery storage, and EV charging infrastructure for efficient energy management in large-scale commercial buildings. Appl. Energy 2025, 402, 126865. [Google Scholar] [CrossRef]
  21. Wu, Y.; Aziz, S.M.; Haque, M.H. Techno-economic modelling for energy cost minimisation of a university campus to support electric vehicle charging with photovoltaic capacity optimisation. Renew. Energy 2023, 219, 119427. [Google Scholar] [CrossRef]
  22. Guindi, M.; Kamel, R.M. Optimal location and sizing of renewable distributed generations and electric vehicle charging stations. Renew. Energy 2024, 235, 121272. [Google Scholar] [CrossRef]
  23. Ozturk, Z.; Demirci, A.; Terkes, M.; Yumurtaci, R. Optimal planning of solar PV-based electric vehicle charging stations empowered by energy storage system: Feasibility and green charge potential. Renew. Energy 2025, 255, 123715. [Google Scholar] [CrossRef]
  24. Heath, E.; Wolbertus, R.; Heller, R. Optimal Sizing of a Battery-Supported Electric Vehicle Charging Hub with a Limited-Capacity Grid Connection. World Electr. Veh. J. 2024, 15, 133. [Google Scholar] [CrossRef]
  25. Parlikar, A.; Schott, M.; Godse, K.; Kucevic, D.; Jossen, A.; Hesse, H. High-power electric vehicle charging: Low-carbon grid integration pathways with stationary lithium-ion battery systems and renewable generation. Appl. Energy 2023, 333, 120541. [Google Scholar] [CrossRef]
  26. Kamana-Williams, B.; Bishop, D.; Hooper, G.; Chase, J.G. Driving change: Electric vehicle charging behavior and peak loading. Renew. Sustain. Energy Rev. 2024, 189, 113953. [Google Scholar] [CrossRef]
  27. Hecht, C.; Pournaghi, A.; Schwinger, F.; Spreuer, K.G.; Figgener, J.; Jarke, M.; Sauer, D.U. Global electric vehicle charging station site evaluation and placement based on large-scale empirical data from Germany. eTransportation 2024, 22, 100358. [Google Scholar] [CrossRef]
  28. Voronin, V.; Nepsha, F.; Ilyushin, P. A Demand Factor Analysis for Electric Vehicle Charging Infrastructure. World Electr. Veh. J. 2025, 16, 537. [Google Scholar] [CrossRef]
  29. Kavianipour, M.; Fakhrmoosavi, F.; Singh, H.; Ghamami, M.; Zockaie, A.; Ouyang, Y.; Jackson, R. Electric vehicle fast charging infrastructure planning in urban networks considering daily travel and charging behavior. Transp. Res. Part D. Transp. Environ. 2021, 93, 102769. [Google Scholar] [CrossRef]
  30. Makeen, P.; Ghali, H.A.; Memon, S.; Duan, F. Smart techno-economic operation of electric vehicle charging station in Egypt. Energy 2023, 264, 126151. [Google Scholar] [CrossRef]
  31. Hernández Cedillo, M.; Sun, H.; Jiang, J.; Cao, Y. Dynamic pricing and control for EV charging stations with solar generation. Appl. Energy 2022, 326, 119920. [Google Scholar] [CrossRef]
  32. Ameer, H.; Wang, Y.; Fan, X.; Chen, Z. Hybrid optimization of EV charging station placement and pricing using Bender’s decomposition and NSGA-II algorithm. Appl. Energy 2025, 397, 126385. [Google Scholar] [CrossRef]
  33. Huang, Y.; Masrur, H.; Lipu, M.S.H.; Howlader, H.O.R.; Gamil, M.M.; Nakadomari, A.; Mandal, P.; Senjyu, T. Multi-objective optimization of campus microgrid system considering electric vehicle charging load integrated to power grid. Sustain. Cities Soc. 2023, 98, 104778. [Google Scholar] [CrossRef]
  34. Vinod Kumar, B.; Aneesa Farhan, M.A. Optimal allocation of EV charging station and capacitors considering reliability using a hybrid optimization approach. Appl. Energy 2024, 375, 124139. [Google Scholar] [CrossRef]
  35. Gusain, C.; Nangia, U.; Tripathi, M.M. Optimal sizing of standalone hybrid renewable energy system based on reliability indicator: A case study. Energy Convers. Manag. 2024, 310, 118490. [Google Scholar] [CrossRef]
  36. Maisanam, A.K.S.; Biswas, A.; Sharma, K.K. Integrated socio-environmental and techno-economic factors for designing and sizing of a sustainable hybrid renewable energy system. Energy Convers. Manag. 2021, 247, 114709. [Google Scholar] [CrossRef]
  37. Medghalchi, Z.; Taylan, O. A novel hybrid optimization framework for sizing renewable energy systems integrated with energy storage systems with solar photovoltaics, wind, battery and electrolyzer-fuel cell. Energy Convers. Manag. 2023, 294, 117594. [Google Scholar] [CrossRef]
  38. Çakıl, F.; Aksoy, N. Reinforcement learning-based multi-objective smart energy management for electric vehicle charging stations with priority scheduling. Energy 2025, 322, 135475. [Google Scholar] [CrossRef]
  39. Barman, P.; Dutta, L.; Bordoloi, S.; Kalita, A.; Buragohain, P.; Bharali, S.; Azzopardi, B. Renewable energy integration with electric vehicle technology: A review of the existing smart charging approaches. Renew. Sustain. Energy Rev. 2023, 183, 113518. [Google Scholar] [CrossRef]
  40. George-Williams, H.; Wade, N.; Carpenter, R.N. A probabilistic framework for the techno-economic assessment of smart energy hubs for electric vehicle charging. Renew. Sustain. Energy Rev. 2022, 162, 112386. [Google Scholar] [CrossRef]
  41. de Farias, L.R.C.; Araújo, A.F.R. A decomposition-based many-objective evolutionary algorithm updating weights when required. Swarm Evol. Comput. 2022, 68, 100980. [Google Scholar] [CrossRef]
  42. Wang, C.; Huang, H.; Pan, H. A constrained many-objective evolutionary algorithm with learning vector quantization-based reference point adaptation. Swarm Evol. Comput. 2023, 82, 101359. [Google Scholar] [CrossRef]
  43. Zhao, H.; Hao, X. Location decision of electric vehicle charging station based on a novel grey correlation comprehensive evaluation multi-criteria decision method. Energy 2024, 299, 131356. [Google Scholar] [CrossRef]
  44. Men, J.; Zhao, C. A Type-2 fuzzy hybrid preference optimization methodology for electric vehicle charging station location. Energy 2024, 293, 130701. [Google Scholar] [CrossRef]
  45. Hosseini Dehshiri, S.S.; Firoozabadi, B. Optimizing building energy solutions: A guideline for choosing proper multi criteria decision making methods in energy problems. Energy 2025, 317, 134598. [Google Scholar] [CrossRef]
  46. Zhou, Y. A dynamic self-learning grid-responsive strategy for battery sharing economy—Multi-objective optimisation and posteriori multi-criteria decision making. Energy 2023, 266, 126397. [Google Scholar] [CrossRef]
  47. Aparisi-Cerdá, I.; Ribó-Pérez, D.; García-Melón, M.; D’Este, P.; Poveda-Bautista, R. Drivers and barriers to the adoption of decentralised renewable energy technologies: A multi-criteria decision analysis. Energy 2024, 305, 132264. [Google Scholar] [CrossRef]
  48. Khaksari, A.; Tsaousoglou, G.; Makris, P.; Steriotis, K.; Efthymiopoulos, N.; Varvarigos, E. Sizing of electric vehicle charging stations with smart charging capabilities and quality of service requirements. Sustain. Cities Soc. 2021, 70, 102872. [Google Scholar] [CrossRef]
  49. Horesh, N.; Zhou, Y.; Quinn, J. Home charging for all: Techno-economic and life cycle assessment of multi-unit dwelling electric vehicle charging hubs. J. Clean. Prod. 2023, 383, 135551. [Google Scholar] [CrossRef]
  50. Zhao, E.; May, E.; Walker, P.D.; Surawski, N.C. Emissions life cycle assessment of charging infrastructures for electric buses. Sustain. Energy Technol. Assess. 2021, 48, 101605. [Google Scholar] [CrossRef]
  51. Joshi, A.; Sharma, R.; Baral, B. Comparative life cycle assessment of conventional combustion engine vehicle, battery electric vehicle and fuel cell electric vehicle in Nepal. J. Clean. Prod. 2022, 379, 134407. [Google Scholar] [CrossRef]
  52. Mahmoudi, S.M.; Maleki, A.; Rezaei Ochbelagh, D. Investigating the role of the carbon tax and loss of power supply probability in sizing a hybrid energy system, economically and environmentally. Energy Convers. Manag. 2023, 280, 116793. [Google Scholar] [CrossRef]
  53. Mohseni, S.; Khalid, R.; Brent, A.C. Stochastic, resilience-oriented optimal sizing of off-grid microgrids considering EV-charging demand response: An efficiency comparison of state-of-the-art metaheuristics. Appl. Energy 2023, 341, 121007. [Google Scholar] [CrossRef]
  54. Hashemi, M.; Jenkins, G.; Milne, F. Rooftop solar with net metering: An integrated investment appraisal. Renew. Sustain. Energy Rev. 2023, 188, 113803. [Google Scholar] [CrossRef]
  55. Tahir, M.U.; Siraj, K.; Ali Shah, S.F.; Arshad, N. Evaluation of single-phase net metering to meet renewable energy targets: A case study from Pakistan. Energy Policy 2023, 172, 113311. [Google Scholar] [CrossRef]
  56. Benalcazar, P.; Kalka, M.; Kamiński, J. From consumer to prosumer: A model-based analysis of costs and benefits of grid-connected residential PV-battery systems. Energy Policy 2024, 191, 114167. [Google Scholar] [CrossRef]
  57. Ros, A.; Shetty, S. Residential rooftop solar demand in the U.S. and the impact of net energy metering and electricity prices. Energy Econ. 2023, 118, 106491. [Google Scholar] [CrossRef]
  58. Wu, Z.; Chen, Z.; Wang, C.; Zhou, M.; Wang, J.; Chen, L. Unlocking the potential of rooftop solar panels: An incentive rate structure design. Energy Policy 2024, 190, 114159. [Google Scholar] [CrossRef]
  59. Botelho, D.F.; de Oliveira, L.W.; Dias, B.H.; Soares, T.A.; Moraes, C.A. Prosumer integration into the Brazilian energy sector: An overview of innovative business models and regulatory challenges. Energy Policy 2022, 161, 112735. [Google Scholar] [CrossRef]
  60. Pramadya, F.A.; Kim, K.N. Promoting residential rooftop solar photovoltaics in Indonesia: Net-metering or installation incentives? Renew. Energy 2024, 222, 119901. [Google Scholar] [CrossRef]
  61. Dong, C.; Zhou, R.; Li, J. Rushing for subsidies: The impact of feed-in tariffs on solar photovoltaic capacity development in China. Appl. Energy 2021, 281, 116007. [Google Scholar] [CrossRef]
  62. Mehedi, T.H.; Gemechu, E.; Kumar, A. Life cycle greenhouse gas emissions and energy footprints of utility-scale solar energy systems. Appl. Energy 2022, 314, 118918. [Google Scholar] [CrossRef]
  63. Zheng, S.; Teh, J.; Alharbi, B.; Lai, C.-M. A review of equivalent-circuit model, degradation characteristics and economics of Li-ion battery energy storage system for grid applications. J. Energy Storage 2024, 101, 113908. [Google Scholar] [CrossRef]
  64. Krim, Y.; Sechilariu, M.; Locment, F.; Alchami, A. Global Cost and Carbon Impact Assessment Methodology for Electric Vehicles’ PV-Powered Charging Station. Appl. Sci. 2022, 12, 4115. [Google Scholar] [CrossRef]
  65. Brodnicke, L.; Gabrielli, P.; Sansavini, G. Dynamic grid emission factors and export limits reduce emission abatement and cost benefits of building PV systems. Energy Build. 2024, 323, 114772. [Google Scholar] [CrossRef]
  66. Ren, M.; Mitchell, C.R.; Mo, W. Dynamic life cycle economic and environmental assessment of residential solar photovoltaic systems. Sci. Total Environ. 2020, 722, 137932. [Google Scholar] [CrossRef] [PubMed]
  67. Reyseliani, N.; Hidayatno, A.; Purwanto, W.W. Implication of the Paris agreement target on Indonesia electricity sector transition to 2050 using TIMES model. Energy Policy 2022, 169, 113184. [Google Scholar] [CrossRef]
  68. Erbas, B.C.; Manych, N.; Gallagher, K.P.; Bhandary, R.R. The need for sustainability premium of the early retirement of coal plants: Evidence from Indonesia. Energy Policy 2026, 207, 114810. [Google Scholar] [CrossRef]
  69. Novizayanti, D.; Prasetio, E.A.; Siallagan, M.; Santosa, S.P. Agent-Based Modeling Framework for Electric Vehicle Adoption Transition in Indonesia. World Electr. Veh. J. 2021, 12, 73. [Google Scholar] [CrossRef]
  70. Jochem, P.; Gnann, T.; Anderson, J.E.; Bergfeld, M.; Plötz, P. Where should electric vehicle users without home charging charge their vehicle? Transp. Res. Part D. Transp. Environ. 2022, 113, 103526. [Google Scholar] [CrossRef]
  71. Kang, Z.; Ye, Z.; Lam, C.-M.; Hsu, S.-C. Sustainable electric vehicle charging coordination: Balancing CO2 emission reduction and peak power demand shaving. Appl. Energy 2023, 349, 121637. [Google Scholar] [CrossRef]
  72. Meng, Y.; Sun, Y.; Xie, D.; Xiao, M.; Yin, C.; Zhao, L. A two-stage optimization framework for EV charging station planning considering investment cost and service satisfaction. Appl. Energy 2025, 402, 126911. [Google Scholar] [CrossRef]
  73. Fallahifar, R.; Kalantar, M. Optimal planning of lithium ion battery energy storage for microgrid applications: Considering capacity degradation. J. Energy Storage 2023, 57, 106103. [Google Scholar] [CrossRef]
Figure 1. Policy-embedded many-objective design framework for the grid-connected PV–BESS charging station. The regulatory regime enters the dispatch and cash-flow models inside the NSGA-III loop; TOPSIS, front-wide viability counts and environmental benchmarking are applied after optimisation.
Figure 1. Policy-embedded many-objective design framework for the grid-connected PV–BESS charging station. The regulatory regime enters the dispatch and cash-flow models inside the NSGA-III loop; TOPSIS, front-wide viability counts and environmental benchmarking are applied after optimisation.
Preprints 236851 g001
Figure 2. Convergence of NSGA-III under the baseline scenario: (a) hypervolume of the cumulative archive and of the current population; (b) growth of the cumulative non-dominated archive. The trajectories of S2–S4 are numerically identical to S1.
Figure 2. Convergence of NSGA-III under the baseline scenario: (a) hypervolume of the cumulative archive and of the current population; (b) growth of the cumulative non-dominated archive. The trajectories of S2–S4 are numerically identical to S1.
Preprints 236851 g002
Figure 3. Design space of the candidate sets. Net billing and the carbon credit reproduce the baseline set exactly; net metering reshapes it towards near-zero storage. Stars mark TOPSIS compromise designs.
Figure 3. Design space of the candidate sets. Net billing and the carbon credit reproduce the baseline set exactly; net metering reshapes it towards near-zero storage. Stars mark TOPSIS compromise designs.
Preprints 236851 g003
Figure 4. Life-cycle emission reduction versus NPV across the candidate sets of the four export scenarios. Filled markers are investable designs (NPV ≥ 0); stars are TOPSIS compromise designs.
Figure 4. Life-cycle emission reduction versus NPV across the candidate sets of the four export scenarios. Filled markers are investable designs (NPV ≥ 0); stars are TOPSIS compromise designs.
Preprints 236851 g004
Figure 5. Life-cycle carbon of the compromise designs: (a) 25-year embodied and operational emissions against the grid-only and ICEV references; (b) carbon payback time relative to a grid-only station.
Figure 5. Life-cycle carbon of the compromise designs: (a) 25-year embodied and operational emissions against the grid-only and ICEV references; (b) carbon payback time relative to a grid-only station.
Preprints 236851 g005
Figure 6. Renewable energy fraction versus life-cycle emission reduction across the 80 baseline candidates, coloured by storage capacity. The net-billing compromise maximises REF but sits far below the reduction frontier.
Figure 6. Renewable energy fraction versus life-cycle emission reduction across the 80 baseline candidates, coloured by storage capacity. The net-billing compromise maximises REF but sits far below the reduction frontier.
Preprints 236851 g006
Table 1. Measured charging demand, September 2023–August 2024 (Year 1 of the analysis).
Table 1. Measured charging demand, September 2023–August 2024 (Year 1 of the analysis).
Quantity Value
Charging sessions 869
Annual energy delivered 17,029.66 kWh
Mean arrivals 2.37 vehicles/day
Mean energy per session 19.60 kWh
Median session duration 0.48 h
Peak hourly demand 95.19 kW
Hours with no transaction 87.1%
Load factor 2.04%
Table 2. Regulatory scenarios.
Table 2. Regulatory scenarios.
Scenario Export Compensation Mechanism
S1 Baseline No — Surplus curtailed
S2 Net billing 100% Yes κ = 1.00 (IDR 1699/kWh) Export revenue in NPV
S3 Carbon credit No IDR 50,000/tCO2 Avoided-emission revenue in NPV
S4 Net billing 65% Yes κ = 0.65 (IDR 1104/kWh) Export revenue in NPV
S5 Net metering 65% Yes α = 0.65 Export nets against grid cost
S6 Net metering 100% Yes α = 1.00 Export nets against grid cost
Table 3. Principal parameters.
Table 3. Principal parameters.
Parameter Value
Grid emission factor 0.93 kgCO2e/kWh
Grid purchase tariff pbuy IDR 1699/kWh
Charging service tariff IDR 2466/kWh
Contracted grid import limit 66 kW
Site connection for chargers 350 kW
AC / DC charger rating 22 kW / 150 kW
PV / BESS capital cost IDR 12,000,000/kWp / 2,000,000/kWh
AC / DC charger cost IDR 25,000,000 / 500,000,000 per unit
Annual O&M 1% of CAPEX
Discount rate; project life 5%; 25 years
PV degradation; performance ratio 0.5%/year; 88.42%
BESS efficiency; depth of discharge; C-rate 0.95/0.95; 80%; 0.8
PV embodied emissions; life 1500 kgCO2e/kWp; 25 years
BESS embodied emissions; life 100 kgCO2e/kWh; 10 years
EV consumption; ICEV economy; fuel factor 0.18 kWh/km; 12 km/L; 2.31 kgCO2/L
Demand growth (additive on Year 1) 20% (Y1–5), 10% (Y6–10), 5% (Y11–25)
Table 4. Structural classification of policy instruments by comparison of complete candidate sets with the baseline.
Table 4. Structural classification of policy instruments by comparison of complete candidate sets with the baseline.
Scenario Designs Shared with S1 Max |Δ| vs S1 Min BESS (kWh) Min LCOC (IDR/kWh) Class
S1 Baseline 80 — — 17.37 2804.97 Reference
S2 Net billing 100% 80 80 0 17.37 2804.97 II—re-ranking
S3 Carbon credit 80 80 0 17.37 2804.97 II—re-ranking
S4 Net billing 65% 80 80 0 17.37 2804.97 II—re-ranking
S5 Net metering 65% 79 0 — 1.05 2201.49 I—reshaped
S6 Net metering 100% 76 0 — 1.01 1987.92 I—reshaped
Table 5. TOPSIS compromise designs and front-wide viability (Rank 1 of each scenario; u = 1 unless stated).
Table 5. TOPSIS compromise designs and front-wide viability (Rank 1 of each scenario; u = 1 unless stated).
Indicator S1 S2 NB 100% S3 Carbon S4 NB 65% S5 NM 65% S6 NM 100% S1, u = 3.5
PV (kWp) 57.07 222.12 57.07 222.12 53.18 54.25 132.18
BESS (kWh) 130.29 291.99 130.29 291.99 120.05 126.35 281.76
AC / DC points 8 / 1 9 / 1 8 / 1 9 / 1 7 / 1 5 / 1 7 / 1
LCOC (IDR/kWh) 4230.62 9851.81 4230.62 9851.81 3875.77 3841.19 2188.61
LPSP (lifetime) 0.00225 0.00019 0.00225 0.00019 0.00256 0.00240 0.00672
Wq (h) 0.00234 0.00234 0.00234 0.00234 0.00235 0.00271 0.00973
REF (%) 92.43 99.62 92.43 99.62 90.68 91.56 92.34
ERICEV (%) 82.25 61.22 82.25 61.22 81.52 81.98 86.12
ERgrid (%) 79.58 55.41 79.58 55.41 78.75 79.28 84.04
25-yr GHG (tCO2e) 187.5 409.6 187.5 409.6 195.2 190.4 513.2
Carbon payback vs grid (yr) 4.70 13.04 4.70 13.04 4.48 4.54 3.33
Year-1 export (MWh) 0 349.3 0 349.3 70.6 72.3 0
NPV (million IDR) −899.26 +3701.73 −876.90 +1086.31 −718.26 −700.73 +493.08
Discounted payback (yr) never 8.38 never 16.28 never never 21.44
Designs with NPV ≥ 0 0/80 65/80 0/80 8/80 5/79 5/76 32/46
Table 6. Decomposition of design and policy effects for net billing at 100%.
Table 6. Decomposition of design and policy effects for net billing at 100%.
Case Design Valuation LCOC (IDR/kWh) ERICEV (%) NPV (million IDR) Payback
A S1 compromise (57.07 kWp) Baseline 4230.62 82.25 −899.26 never
B S2 compromise (222.12 kWp) Baseline 9851.81 61.22 −3770.89 never
C S2 compromise (222.12 kWp) Net billing 9851.81 61.22 +3701.73 8.38 yr
D S1 compromise (57.07 kWp) Net billing 4230.62 82.25 +404.16 16.86 yr
A→B Design effect only +5621.19 −21.03 −2871.63 still never
B→C Policy effect only 0.00 0.00 +7472.62 never → 8.38 yr
Table 7. Year-1 energy flows of the compromise designs (kWh/year).
Table 7. Year-1 energy flows of the compromise designs (kWh/year).
Scenario Requested PV + BESS → EV Grid → EV Unmet PV generated Exported Curtailed
S1 / S3 17,029.7 16,530.6 (97.1%) 491.5 (2.9%) 7.5 94,336.8 0 76,930.0
S2 / S4 17,029.7 17,019.1 (99.9%) 10.5 (0.1%) 0.0 367,152.9 349,326.9 0
S5 17,029.7 16,422.4 (96.4%) 591.9 (3.5%) 15.4 87,906.9 70,596.2 0
S6 17,029.7 16,491.3 (96.8%) 527.8 (3.1%) 10.5 89,677.2 72,297.5 0
S1, u = 3.5 59,603.8 59,286.4 (99.5%) 317.4 (0.5%) 0.0 218,479.1 0 156,340.5
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.
Copyright: This open access article is published under a Creative Commons CC BY 4.0 license, which permit the free download, distribution, and reuse, provided that the author and preprint are cited in any reuse.