Fire Hawk Optimizer for Resource Trade-off in Project Scheduling based on BIM

Submitted:

13 August 2022

Posted:

17 August 2022

You are already at the latest version

A peer-reviewed article of this preprint also exists.

Abstract
Project managers should balance a variety of resource elements in building projects while taking into account many major concerns, including time, cost, quality, risk, and the environment. This study presents a framework for resource trade-offs in project scheduling based on the Building Information Modeling (BIM) methodology and metaheuristic algorithms. First, a new metaheuristic algorithm called Fire Hawk Optimizer (FHO) is used. Using project management software and the BIM process, a 3D model of the construction is created. In order to maximize quality while minimizing time, cost, risk, and CO2 in the project under consideration, an optimization problem is created, and the FHO's capability for solving it is assessed. A predefined stopping condition is taken into account while doing 30 independent optimization runs to obtain the statistical metrics, such as the mean, standard deviation, and the required number of objective function evaluations. The results show that the FHO algorithm is capable of producing competitive and exceptional outcomes when it comes to trade-off various resource options in projects.
Keywords: 
;  ;  ;  ;  ;  
Copyright: This open access article is published under a Creative Commons CC BY 4.0 license, which permit the free download, distribution, and reuse, provided that the author and preprint are cited in any reuse.

Downloads

481

Views

231

Comments

0

Subscription

Notify me about updates to this article or when a peer-reviewed version is published.

Email

Prerpints.org logo

Preprints.org is a free preprint server supported by MDPI in Basel, Switzerland.

Subscribe

© 2025 MDPI (Basel, Switzerland) unless otherwise stated