Operational Challenges, From PMO to EPMO Execution and Operation Case Study Within Electricity Producing Companies (Four Selected Companies Within EU28)

Submitted:

24 October 2020

Posted:

26 October 2020

You are already at the latest version

Abstract
During the European unification process, they stated the need for drawing up a common energy strategic plan that will affects electricity production system in terms of infrastructure, production and generation. The EU strategic action plans included; reduction in emissions, an increase in renewable energies, energy efficiency. In this light therefore the energy efficiency was booked for researching. This article presents an in-depth study of the challenges in transforming a functioning PMO model to an EPMO model within four electricity companies from different countries within the EU and how those challenges can be address within companies implementing same methodology to bring about electricity production efficiency. Will these identified challenges make it impossible for the companies to achieve electricity production efficiency in the transformation from PMO to EPMO? PMO has been the major methodology used by these companies. To achieve production efficiency, the need for a heavyweight methodology was identified (EPMO) and implemented in four mega electricity producing companies with cross boarder distributions, one from France; Germany; Spain and UK
Keywords: 
;  ;  ;  ;  ;  
Copyright: This open access article is published under a Creative Commons CC BY 4.0 license, which permit the free download, distribution, and reuse, provided that the author and preprint are cited in any reuse.
Prerpints.org logo

Preprints.org is a free preprint server supported by MDPI in Basel, Switzerland.

Subscribe

Disclaimer

Terms of Use

Privacy Policy

Privacy Settings

© 2025 MDPI (Basel, Switzerland) unless otherwise stated