Design Considerations for Small-Lift Vehicle Launch Facilities and Their Influence on Site Selection

Submitted:

23 November 2026

Posted:

25 November 2026

You are already at the latest version

Abstract
Private operators are developing small-lift launch facilities with little guidance on their design or siting. Existing site selection studies list criteria as attributes of a site without tracing them to what the facility must provide. This study identifies the external design considerations (outside the site boundary) and internal design considerations (the infrastructure within it) for small-lift launch facilities, compares orbital and suborbital facilities, and derives the site selection criteria that both generate. A practitioner-led, qualitative multi-case study was undertaken of five South Australian facilities (two orbital, three suborbital) designed between 2020 and 2026, combining analysis of the approval documents for one orbital facility (public record) and one suborbital facility (used with permission) with the first author's experience of leading all five. Five operational determinants, seven groups of external considerations and thirteen internal design systems were identified. Together they generate 30 site selection criteria – 23 external and 7 internal – which account for all 19 criteria in the most comprehensive prior review. Orbital facilities need coastal sites with open-ocean downrange, water deluge, flame trenches and fixed propellant systems; suborbital facilities suit overland ranges and may need no deluge. Achievable cadence was about 20 orbital and 42 suborbital launches per pad per year.
Keywords: 
;  ;  ;  ;  ;  ;  ;  ;  
Subject: 
Engineering  -   Other

1. Introduction

Over the past two decades, access to space has shifted from government agencies and large defence contractors towards private companies, many of them start-ups, that provide launch services, launch vehicles and payloads [1]. A large share of these new entrants operate small-lift vehicles, defined in this paper as launch vehicles with a payload capacity of less than 2,000 kg to low Earth orbit (LEO). They serve small-satellite constellations and responsive launch markets that require flexible, modular ground infrastructure capable of rapid turnaround at low operating cost [2,3]. Each provider needs somewhere to launch from, and the number of proposed small-lift launch facilities has grown accordingly.
The design of a launch facility, and the site on which it is placed, largely determine its capital and operating cost, the safety risk it poses to staff and the public, its environmental impact and, ultimately, whether it can obtain regulatory approval. Some of the conditions that drive design lie outside the facility boundary and outside the launch operator's control: surrounding transport networks, population, airspace and shipping lanes, weather and natural hazards, and the political and regulatory setting. Others are requirements of the infrastructure built inside the boundary – pads, flame trenches, propellant systems, deluge, utilities and security – which need land of a particular size, form and servicing. A site that is unsuitable in either respect, or a design that under- or over-estimates their demands, exposes the provider to financial and physical risk that is difficult to reverse once a site has been committed.
Published work on spaceports has concentrated on large, government-operated facilities, heavy and super-heavy vehicles, or crewed and space-tourism operations [4,5]. Alongside this, a body of literature proposes criteria for selecting spaceport sites, with interest increasing markedly over the past five years. More than 20 such studies were reviewed for this paper; representative examples are summarised in Table 1. They differ widely in the number of criteria identified, from five to nineteen, largely because each addresses a particular perspective such as law, safety, tourism or national planning rather than seeking a complete set. The most comprehensive review, by AlKhaleefah [6] (pp. 48–49, 58), consolidated earlier work into 19 criteria and classified them as 12 factors and 7 constraints for a proposed site selection method. Other studies examine individual external influences, including proximity to clients and the logistics chain [6] (p. 50), population density and terrain [6] (pp. 49–51), air traffic [7] (p. 1) and transport access [8].
The engineering of launch-pad components, in contrast, is well documented for heavy-lift vehicles: acoustic suppression by water injection [16,17], launch acoustic loads [18], propulsion and propellant handling [19], flame-deflector and flame-trench refractory systems [20,21], lightning protection [22], and safety design for space operations [12]. Much of that practice is oversized for small-lift vehicles, whose plume energy and pad footprint are far smaller, and where site conditions such as lightning exposure appear in it, they are treated as design loads at an already-chosen site rather than as criteria for choosing one.
Four limitations of this literature motivate the present study. First, it treats site selection almost entirely independently of facility design: criteria are proposed as attributes of a site rather than derived from what the facility must provide. Yet design and site selection are interdependent. Site characteristics constrain the feasible design, and design requirements such as safety zones and logistics constrain which sites are viable, which is why integrated, systems-level approaches have been advocated [2]. Second, few studies distinguish between orbital and suborbital facilities, although their requirements differ markedly. Third, no study synthesises the internal design requirements of small-lift facilities or traces site criteria to them. Fourth, the literature is largely desk-based; empirical evidence from teams that have designed small-lift facilities and taken them through regulatory approval is scarce.
This paper addresses these gaps using evidence from five small-lift launch facilities designed in South Australia between 2020 and 2026. They include the Whalers Way Orbital Launch Complex, which was among the first applications by a private entity in Australia for approval to construct a rocket launch facility. The objectives are to:
  • determine the external and internal design considerations for small-lift vehicle launch facilities;
  • compare how those considerations differ between orbital and suborbital facilities; and
  • identify the site selection criteria that external and internal design considerations generate, and relate them to existing criteria.
The contribution is a practitioner-derived framework that links operational determinants, external considerations and internal design systems to design implications and site selection criteria, together with a comparison of those criteria against the existing literature and evidence-based estimates of achievable launch cadence. Section 2 describes the case studies and method, Section 3 presents the results, Section 4 discusses them against prior work and sets out the study's limitations, and Section 5 concludes.

2. Materials and Methods

2.1. Research Design

The study used a qualitative, practitioner-led multiple-case study design. In February 2020 the first author was appointed Project Director for Infrastructure of a start-up launch company and was responsible for the design, environmental assessment and development approval of four launch facilities in South Australia; he subsequently led the design of a fifth facility for RangeOz Pty Ltd. The five cases differ in mission type (orbital or suborbital), design scope (minimum viable product or full facility), vehicle size and physical setting, which allows requirements common to all small-lift facilities to be separated from those specific to a mission type. Two kinds of evidence were used: documentary evidence, available for two cases, and the first author's direct experience as design and approvals lead, available for all five (Section 2.3).

2.2. Case Studies

The cases and the evidence available for each are summarised in Table 2. A minimum viable product (MVP) facility is one that uses mobile launchers and requires the least permanent infrastructure needed to launch effectively.

2.3. Data Sources

Documentary evidence was drawn from two cases. For C1, the Whalers Way Orbital Launch Complex, the approval documents are public record: the Environmental Impact Statement [23] supporting a development application to the Government of South Australia of approximately 5,000 pages, the Response Document to public submissions [24], an environmental submission of approximately 1,500 pages to the Federal Department of Climate Change, Energy, the Environment and Water (DCCEEW), and the State Planning Commission's assessment report [25]. For C5, the RangeOz Launch Facility, the development application and its twelve technical appendices [26] were analysed with the permission of RangeOz Pty Ltd. The development applications for C2, C3 and C4 are not public record and were not available for analysis. For those cases, the evidence is the first author's experience of leading their design, approvals and, for two facilities, construction, together with his supervision of suborbital launch campaigns between 2021 and 2023. That experience was used in three ways: to interpret the documentary findings, to identify requirements that differ between minimum viable product and full facilities, and to test whether themes found in C1 and C5 also applied to the other cases.

2.4. Analysis

The analysis proceeded in five steps.
  • Case-study protocol. A common protocol was used to extract, from every document, each requirement or constraint that originated outside the site boundary, together with the design response it required.
  • Thematic analysis. Items extracted from the C1 and C5 documents were coded in a spreadsheet by the First Author. The candidate items were extracted with their page references and proposed initial codes for review, following the six-phase approach of Braun and Clarke [27] (p. 87): familiarisation with the documents, initial coding, searching for themes, reviewing themes, defining and naming themes, and reporting. Each item was recorded with its source document, case and the design response it required, and items describing the same external driver were grouped into candidate themes. The themes were then checked against the full data set for each case to confirm that they were internally consistent and distinct from one another. In total, 136 items describing external design drivers were extracted (89 from C1 and 47 from C5) and assigned 128 initial codes, which were grouped into ten candidate themes. Seven final themes were retained (Table 4). The other three candidate themes accounted for 20 items: land tenure and statutory encumbrances, utility and service connections, and neighbouring land uses. Because they described attributes of the land rather than external drivers, they were carried forward as site selection criteria 4, 23 and 26 instead (Table 6). A further 53 items describing internal design requirements (25 from C1 and 28 from C5) were coded to thirteen internal systems (Table 5). The full coding log, with source pages, is provided in Table S1.
  • Cross-case comparison. Themes from the documented orbital (C1) and suborbital (C5) cases were compared to distinguish considerations common to both mission types from those specific to one, and the comparison was checked against the first author's experience of the orbital minimum viable product (C2) and the two Koonibba facilities (C3, C4).
  • Constraint-based evaluation. Each theme was translated into a design implication and, where that implication could be met only by an attribute of the site, into a site selection criterion. Each of the five cases was then reviewed against the consolidated set – from documents for C1 and C5 and from the first author's project knowledge for C2–C4 – to confirm that no requirement had been missed.
  • Validation against literature. The resulting criteria were compared with the 19 criteria consolidated by AlKhaleefah [6] (pp. 48–49) and with other published studies, to reduce the risk of bias inherent in practitioner-based research.

2.5. Scope and Key Definitions

Factors that drive the design of a small-lift launch facility were classified into three groups. Operational factors are set by the launch provider, for example mission type, vehicle size and launch cadence. External factors lie outside the site and outside the control of the launch team, for example surrounding transport networks, population, environment, natural hazards and political setting. Internal factors lie within the site and are largely common to infrastructure projects (geotechnical conditions, operational flow, safety in design), together with launch-specific items such as explosive ordnance design and propellant handling. An external design consideration is a constraint or condition outside the boundary of the launch facility that generates a design requirement, a site selection criterion, or both. An internal design consideration is a requirement of infrastructure within the boundary and under the developer's control; where it can be met only by an attribute of the land, it also generates a site selection criterion.
Three safety zones are used throughout (Figure 1). The Explosive Exclusion Zone (EEZ) surrounds the launch pad and must be evacuated during hazardous periods because of the risk of blast and fragments if the vehicle fails on or near the pad; its size scales with the vehicle and can exceed 3,000 m in diameter for larger vehicles [28]. The Flight Path Zone (FPZ) is the designed trajectory corridor, extending for orbital vehicles from the pad to the Kármán line, taken as 100 km in Australia [29] (s. 8), and for suborbital vehicles from the pad to the landing zone. It includes drop zones for scheduled debris such as spent stages and fairings [30] (p. 11), may extend from a few kilometres to about 500 km, and requires airspace restrictions and overwater, maritime restrictions. The Peripheral Risk Zone (PRZ) is the area around the launch vehicle during launch, excluding the FPZ and EEZ. The public has unrestricted access throughout this zone, but the risk of damage or injury by the launch vehicle following an off-nominal flight is elevated. The PRZ has no defined extent, and the risk within it is not assessed when candidate sites are compared: regulatory risk assessment occurs launch by launch at the permit stage and addresses casualties, and damage only to assets with catastrophic potential, rather than damage to infrastructure generally [30] (p. 10) (Section 4.4).

3. Results

3.1. Operational Determinants

Five operational determinants had to be fixed before external considerations could be assessed in every case. Each has direct consequences for design and for the type of site required (Table 3).
Four design scenarios were encountered: a single known vehicle, multiple known vehicles, a future unknown vehicle, and multiple unknown vehicles. A facility designed for one vehicle has a specifically sized EEZ, well-defined acoustic and environmental impacts, and defined ground equipment and logistics, and therefore needs less capital and carries less risk. For private small-lift providers, however, depending on a single client and vehicle is rarely economic, so most facilities must be designed for flexibility, with the largest and most powerful expected vehicle as the design vehicle.

3.1.1. Achievable Launch Cadence

Launch cadence underpins a provider's business model and the number of launches the regulator authorises, and it was the operational determinant estimated least reliably at the outset of the cases. For orbital operations, the cases indicated approximately two weeks of on-site preparation before launch and three to seven days of post-launch activity, giving one launch every 2.5 to 3 weeks, or a maximum of about 20 launches per pad per year. This rate is unlikely to be exceeded over the long term without compromising safety. Higher cadence requires additional pads, each replicating the assembly building, propellant and oxidiser systems and water deluge; 60 launches per year, for example, would require three pad sets, which could share a single mission control centre.
Suborbital operations are considerably simpler because the vehicles and their logistics are smaller. In one campaign supervised by the first author, two TED rockets of about 40 kg each (Figure 2) were scheduled for launch about five hours apart on the same day. The first failed within the helical launch rail, destroying the base of the rail and cancelling the second launch, but the operation had been on schedule until that point. Multiple launches per day are therefore feasible for small suborbital vehicles but cannot be sustained, nor achieved for larger suborbital vehicles of up to about 3,500 kg wet mass, such as the HyImpulse SR75, which require more planning and complex logistics. For a range of 30–3,500 kg vehicles, about 42 suborbital launches per pad per year is recommended, with scope to increase once a higher rate has been shown to be achievable without significant adverse impact. It must be stressed that the vehicle size will impact on these numbers to a certain extent.

3.2. External Design Considerations

Seven groups of external design considerations were identified across the cases. Table 4 summarises the principal design requirement arising from each and the site selection criteria it generates; the criteria are numbered as in Table 6.

3.2.1. Safety Exclusion Zones

The size of the exclusion zones depend on vehicle size, propellant type, trajectory and the dispersion of debris in off-nominal events [30] (pp. 20–23). In Australia, exclusion zones for orbital facilities must be calculated specifically to the vehicle on a launch by launch basis and are subject to regulatory approval for airspace and maritime safety [25] (p. 15). EEZ extents can be estimated with established explosion-danger tools [28]. Because regulators' tolerance of third-party risk is very low, the EEZ and FPZ must be tightly controlled throughout the countdown and launch. In the PRZ, which the operator does not control, the decisive factor is the density of population and infrastructure: the higher the density, the greater the risk if a failed vehicle falls outside the FPZ. Emergency services must also be able to reach the site and the surrounding area: the launch facility emergency management plan should be prepared with local Police, Fire Service and Ambulance input [23] (p. 55).

3.2.2. External Access

Launch vehicles, payloads and critical components are routinely shipped internationally, so the ability to deliver them to the site efficiently and safely was a critical design factor in every case. The design team must establish whether existing road, rail, sea and air networks can carry oversized or fragile components, whether ports, airports and intermodal hubs can handle high-value or hazardous materials, and whether any upgrades are affordable [32,33]. Where major new roads, rail or port infrastructure are required, their cost can make a site unviable, so this consideration carries a high risk of halting a project. Launch sites generate little traffic, even at peak, but wide and heavy loads may require intersection upgrades and can affect public traffic. Early traffic modelling and clear communication with the local community protect the provider's social licence.

3.2.3. Vehicle, Payload and Component Delivery

Delivery planning must address the combination of air, sea, road and rail transport to be used; whether surrounding terrain, such as steep or winding roads with tight turns, can accommodate vehicles carrying launch stages; whether network quality is sufficient to prevent transit damage; and security risks along the route, such as theft from rail corridors. Island sites require transfer by ship or helicopter, adding cost, schedule and risk, so mainland sites are recommended. Where reliable, secure and damage-free delivery cannot be achieved with existing networks, the provider must build its own logistics systems, which may be cost-prohibitive.

3.2.4. Flight Path and Trajectory Access

The site must support unrestricted access to the required trajectories [1,6,11,33]. Equatorial launch sites should lie within about 10° of the equator. Latitude is not as critical for polar and sun-synchronous sites provided the site has the required corridor, but ideally at mid to high latitudes of about 35–60°, although weather risk increases with latitude. Orbital sites need at least 300 km, and ideally 500 km or more, of uninhabited ocean downrange to accommodate staging and drop zones, minimise risk to people and infrastructure, and avoid overflying other nations, which can raise regulatory and diplomatic issues. The facility should therefore have direct sea frontage to maximise the available launch azimuths. Suborbital launches can be conducted over water, but overland ranges are preferred because recovery is safer for staff, cheaper and more certain. In both cases, aircraft and vessels must be excluded from the flight path during launch, so areas with less air and shipping traffic are favoured. The Guiana Space Centre (5.2° N) illustrates a high-quality equatorial site in this respect, combining proximity to the equator, easterly oceanic trajectories and a stable jurisdiction with minimal overflight risk.

3.2.5. Weather and Natural Hazards

High winds and lightning add significant operational risk. Regions prone to cyclones, tsunamis, earthquakes or severe snowstorms present risks to vehicles, payloads and operations that may be unacceptably high and cannot be mitigated by design. At both South Australian cases the principal natural hazard was bushfire, which is assessed here under natural disaster risk: the suborbital facility required asset protection zones, a dedicated fire-water reserve and launch rules tied to the fire danger rating [26] (p. 28), and the orbital facility fire clearances [23] (p. 295).

3.2.6. Environment and Community

Public consultation for the Whalers Way Orbital Launch Complex [25] (pp. 39–41) grouped stakeholder concerns into bushfire risk; noise and vibration impacts on terrestrial, avian and marine species; debris striking marine species; atmospheric pollution from exhaust; light spill from night operations; groundwater contamination; and ocean pollution from spent stages. The environmental assessment took more than three years and drew on specialist studies by more than a dozen consultancies [24] (pp. 19–20), and the State Planning Commission concluded that environmental offsets and improved management of the site would help counteract its impacts and could lead to better environmental outcomes [25] (pp. 164–165), supporting the view that a well-managed small-lift facility can have a net positive environmental effect. Four factors underlie this. Exclusion zones prevent residential and industrial development and can function as wildlife refuges. Small-lift vehicles generate about 140–160 dB at launch compared with up to about 200 dB for heavy-lift vehicles [16] (p. 1), a difference of four to six orders of magnitude in acoustic energy, which can be further mitigated, for example by water injection [16,17,18]. Exhaust mass is far lower: Rocket Lab's Electron weighs about 13,000 kg at lift-off, compared with about 3,000,000 kg for the Space Shuttle. Finally, modern small-lift vehicles increasingly avoid toxic propellants such as hydrazine and nitrogen tetroxide. Environmental and acoustic impacts nevertheless remain decisive for social licence, so the flora and fauna around the pad and the distance to the nearest noise receptors must be assessed when selecting a site. Community support is therefore a site selection criterion in its own right. The Whalers Way proposal attracted 268 submissions (261 from the public), and the concerns they raised led to changes in the design [24] (p. 5).

3.2.7. Political, Regulatory and Social Setting

The facility must be located in a politically and socially stable jurisdiction to ensure the safety and security of staff, clients, vehicles and payloads. The regulator authorises the maximum number of launches per year, taking into account the number requested, environmental constraints, economic modelling and stakeholder impacts. A local workforce, or a population able to support one, is also required, together with a nearby service centre: the Whalers Way EIS sought a town within about an hour's travel offering accommodation, banking, trades, health and education, so that staff could live locally rather than fly in and fly out [23] (pp. 142, 144). A local aerospace education and industry base can supply skilled staff, suppliers and research partners [6] (p. 50), although in the cases studied it featured only as a potential economic benefit of the facility [23] (p. 50). Cumulative impacts at high cadence can erode social licence to the point of threatening the provider's approvals.

3.3. Internal Design Considerations

Internal requirements fell into thirteen systems (Table 5). Most civil, building and utility requirements are those of any remote industrial site; the launch-specific requirements are concentrated in acoustic suppression, the pad and flame trench, the launch support structure, lightning protection, propellant systems and the separation of control functions from the EEZ. The full design checklists are given in Appendix A.

3.3.1. Acoustic Suppression and Water Deluge

Heavy-lift vehicles generate acoustic levels approaching 200 dB, whereas small-lift vehicles generate about 140–160 dB [16] (p. 1), [18] (p. 1). Water injection converts acoustic energy to heat as droplets evaporate and is the most effective pad-level mitigation [16] (pp. 8–9), [17] (p. 2); the literature relates deluge flow to the exhaust mass flow rate (MFR): the Space Shuttle used water-to-exhaust ratios of about 1:1 to 2:1, giving reductions of up to 8–12 dB [17] (p. 2), and a ratio of 5:1 has been reported as optimal [16] (p. 9). At Whalers Way (C1) the deluge was instead sized to a budget-constrained maximum flow – 1,000 L/s at 20 m head from a 150,000 L elevated tank, gravity-fed – because a full MFR-based design was unaffordable and noise was the principal social-licence risk [23] (p. 196). Droplet size also affects performance: atomising the water into fine droplets before it enters the exhaust gives greater noise reduction than injecting solid water jets, which generate low-frequency impact noise of their own [34] (p. 3), and suppression improves as droplet diameter falls because of faster mixing, reduced drag and a larger surface for heat transfer [35] (p. 602). Simple pressure-fed (hydraulic) injectors of the kind used in pad deluge systems produce relatively coarse droplets of about 500 µm–2 mm, depending on injector size and water velocity [35] (pp. 603, 605). The C1 design targeted droplets of about 400–800 µm, at the finer end of this range. At RangeOz (C5) no deluge was provided: the design states that none is needed for suborbital launches as the nearest acoustic receptor (neighbour) is approximately 6.5 km from the launch site. As a result, water is used only for about 34 kL of pre-launch ground wetting to reduce fire risk [26] (p. 37). The case evidence therefore supports deluge for small orbital vehicles, but not for suborbital vehicles of up to about 3,500 kg, where separation distance and fire-prevention wetting were sufficient.

3.3.2. Pad, Flame Trench and Launch Support Structure

Combustion temperatures of 2,500–3,600 K [19] (p. 47) and thrust of tens to hundreds of kilonewtons expose the pad to explosive spalling, where moisture trapped in concrete pores vaporises, expands and fractures the surface [36] (p. 1487), and to uplift through existing cracks [20]. Mitigations are high-strength concrete mixes, polypropylene fibres that melt to relieve pore pressure, and regular inspection [21] (pp. 14–15), [36] (p. 1487). The orbital pad at C1 is about 1.0 m thick and may be piled to resist the bending moment of erecting the vehicle, and its 5 m × 35 m flame trench both directs exhaust and collects deluge water for testing [23] (p. 199). The suborbital pad at C5 is a simple slab supporting a 17 m T-slot launch rail [26] (p. 12). Liquid orbital vehicles generally need a tower or strongback for umbilicals and stabilisation, whereas unguided suborbital vehicles need a rail that is rigid enough for high launch accelerations and machined to tight tolerances.
Figure 3. HyImpulse SR75 at launch on the Mid-Range Launcher, Koonibba Test Range. Photograph courtesy of HyImpulse Technologies GmbH.
Figure 3. HyImpulse SR75 at launch on the Mid-Range Launcher, Koonibba Test Range. Photograph courtesy of HyImpulse Technologies GmbH.
Preprints 245783 g003

3.3.3. Propellant Systems

Propellant infrastructure depends on motor type: solid motors need none but require explosive-ordnance construction of associated infrastructure and a licensed magazine; liquid vehicles need separate fuel and oxidiser systems, often cryogenic; hybrids need oxidiser systems only [19]. Both cases excluded hydrazine-family propellants and other toxic or high risk fuels. Loading and de-fuelling must be remote, because no person may be in the EEZ while the vehicle is fuelled, and a scrubbed launch requires either recapture or disposal by flare stack and cold box, as provided at C1 [23] (p. 200). C5 limits storage to campaign quantities of 5,000 L each of fuel and oxidiser in bunds exceeding 160% of tank volume, above the 133% guideline for flammable liquids [26] (p. 41), [37]. Candidate propellants and their handling classes are listed in Table A1.

3.3.4. Control, Utilities and Fire Protection

Mission control can be anywhere with suitable communications, but on-site control reduces staffing because some roles span assembly and control. At both cases it lies outside the EEZ: near the entrance at C1, outside the launch safety buffer of the largest vehicle [24] (p. 23), and 3.2 km from the pad at C5, with a protected firing bunker for a small firing crew [26] (pp. 6–7). That separation forces each node to be self-sufficient in utilities. The suborbital site, inland and remote, has no mains water, grid power, fixed line or mobile coverage, so water is carted and harvested, power is stand-alone at about 145 kW connected load, and communications use satellite links with two independent backups [26] (pp. 36, 38, 42, 44). Fire protection is likewise driven by remoteness, climate and vegetation: the C5 facility is designed to be self-sufficient in water, fire trucks, pumps and other firefighting equipment [26] (p. 39), [38].

3.4. Site Selection Criteria

Translating the operational determinants and external considerations into site attributes yielded 23 site selection criteria; seven internal requirements that can be met only by attributes of the land or its locality added a further seven, giving 30 (Table 6). Criteria 7 and 22 apply chiefly to orbital facilities, and criterion 10 takes a different form for each mission type (coastal for orbital, an overland range for suborbital); the remainder apply to both mission types, although usually with greater force for orbital facilities. Table 7 sets out the internal drivers of the seven internal criteria (3, 19, 23–26 and 30).
Some internal requirements affect siting only through cost. Steep or wooded terrain raises earthworks and clearing costs but may make the EEZ easier to control; motor test stands inside the launch complex force the EEZ to be enforced during tests and so compete with launch scheduling, which favours a separate test site.

3.5. Orbital and Suborbital Facilities Compared

Orbital and suborbital facilities differ chiefly because orbital missions must reach about 7.8 km/s for LEO, which requires larger vehicles, more propellant and more powerful propulsion. Table 8 sets out the resulting external and internal differences between the two detailed cases.
Internally, the orbital facility is larger and heavier in almost every system, chiefly because of vehicle mass and the need for deluge, a flame trench and fixed propellant infrastructure. Two findings run against expectation. The EEZ allowance at the suborbital site is comparable to the orbital one, because it was sized conservatively for the largest vehicle under IATG 01.80 [39]; and the suborbital site's utility burden is greater, because of its increased launch cadence ability rather than its mission type.

3.6. Integrated Framework

Figure 4 integrates these results into a framework linking design to site selection. The provider first fixes the operational determinants and the design vehicle. These define the demands that external considerations and internal design systems place on the facility and its land, which are expressed as design implications and then as site selection criteria. Because external conditions cannot be changed by the launch team, criteria such as latitude, downrange corridor, nations along the trajectory and natural hazard exposure act as screens that a candidate site must pass. The characteristics of each candidate site then feed back into the design, and the process is repeated until a site satisfies all screening criteria.

4. Discussion

4.1. Comparison with Existing Site Selection Criteria

Table 9 compares the external criteria with the 19 criteria consolidated by AlKhaleefah [6] (pp. 48–49). Fourteen of the 23 external criteria have a counterpart in that review. The other nine are not reported there; most of them – vehicle type, nations along the trajectory, coastal or overland range access, shipping corridors, port and airport capacity and a mainland location – arise directly from the facility's design requirements, consistent with the absence of a design perspective in earlier studies. Five of AlKhaleefah's criteria have no external counterpart, and all five are explained by internal criteria: secure area (19), land availability (23), terrain assessment (24), utility access (26) and amenities access (30). The 30 criteria therefore account for all 19 of AlKhaleefah's criteria, and trace each to a design origin.
The wide variation in the number of criteria reported in earlier studies (Table 1) reflects their differing perspectives rather than disagreement about the factors themselves. Deriving criteria from design requirements offers a way to explain why each criterion matters and how strongly it constrains a given facility, rather than only listing it. The relative importance of the criteria was not assessed in this study.

4.2. Launch Cadence

The cadence estimates in Section 3.1.1 can be compared with the cadences approved for, and achieved by, other facilities (Table 10). Long-established sites have sustained modest rates: Andøya has averaged about 20 suborbital launches per year since 1962, and the Guiana Space Centre about six orbital launches per year since 1968. Rocket Lab's Launch Complex 1 is authorised for up to one launch every 72 hours (about 120 per year) but has achieved far fewer. Against an orbital estimate of about 20 launches per pad per year, approvals of 120 per year, or the 90 per year sought for the Bowen Orbital Spaceport (BOS), would require five to six fully equipped pads and appear unachievable in practice.
These findings are consistent with the literature. Early work defined spaceport capacity in terms of launch opportunities [40] (p. 1); more recent studies show that multi-user facilities increase throughput only when scheduling, processing and range operations are synchronised [41,42], and empirical data show that actual launch rates remain well below theoretical limits [40] (p. 1), [41] (pp. 1–2). Capacity is therefore constrained by operations rather than by physical infrastructure alone. Optimistic cadence forecasts, often made to demonstrate revenue to investors and accepted in good faith by regulators, carry through to pad numbers, environmental approvals and business cases. Realistic per-pad cadence should therefore be established before design and site selection begin.

4.3. Where the Cases Differ From Common Practice

Three design assumptions common in practice are qualified by the evidence. Water deluge was assumed to be desirable for all small-lift launches, but the suborbital case was designed without it; for suborbital vehicles separation distance and fire-prevention wetting proved adequate. Asphalt was preferred over gravel to limit dust near vehicles and electronics, but the remote suborbital case used engineered gravel for cost, accepting dust control by irrigation and planting. Utilities were expected to be light, but at a remote inland site the absence of every service made utilities one of the largest design systems. In each case the difference is explained by vehicle size or remoteness rather than by a change in principle.

4.4. Risk Beyond the Exclusion Zones – Assessing the PRZ

No regulatory instrument or assessment methodology currently defines the extent of the PRZ or provides a means of calculating the risk within it at the site selection stage. In Australia, the Flight Safety Code limits third-party collective risk to 1 × 10⁻⁴ and individual risk to 1 × 10⁻⁶ per launch [30] (p. 10). These limits apply to members of the public wherever they are, but they are demonstrated launch by launch at the permit stage, after the site has been chosen, and they measure casualties only. Infrastructure is protected only where it is an asset with catastrophic potential, whose impact by debris could trigger a chain of events leading to casualties [30] (pp. 6, 10). Damage to, and loss of use of, ordinary infrastructure such as dwellings, roads, power lines, wind turbines and farm assets is addressed only financially, through the maximum probable loss calculation that sets the required insurance [43]. The United States regime is similar: its infrastructure criterion applies only to designated critical assets [44,45]. A definite risk to people and infrastructure therefore exists in the PRZ, but there is no agreed method to determine how large the PRZ is for a given vehicle and site, or to quantify the risk to the infrastructure within it.
The exclusion zones control risk where the operator can control access: the EEZ is evacuated and the FPZ and drop zones are cleared of people, aircraft and vessels [30] (p. 11). The Peripheral Risk Zone is different. It lies outside the operator's control, the public has unrestricted access to it, and yet it is where a vehicle that fails early in flight, before the flight termination system acts or because it fails to act, is most likely to deposit debris, burning propellant or an intact stage. Criterion 4 (surrounding population and infrastructure) and criterion 11 (noise and nearest receptors) acknowledge this risk, but in both cases, it was assessed qualitatively, by separation distance.
The case evidence shows why this is insufficient for siting decisions. At Whalers Way the nearest residences are about 3.5 km from the launch pads [25] (p. 166), a wind farm lies within the broader locality, and public roads, a beach and a tourist zone determined where the pads could go [23] (p. 123). At RangeOz the nearest dwelling is 6.6 km away, but 1.4 km of a public road lies inside the EEZ, and a failure could ignite fire in mallee country adjoining conservation parks with a history of very large fires [26] (pp. 6–7, 28). In each case the relevant question – the probability that people or specific infrastructure outside the exclusion zones are harmed by an off-nominal flight – was not quantified, and it could not be compared between candidate sites. This matters most for new small-lift vehicles, whose early flights fail at high rates [46] (pp. 244–245); the first launch attempt at Whalers Way ended in a fire on the pad.
A site-comparison method should therefore estimate, for each candidate site and design vehicle, the likelihood that infrastructure in the PRZ is damaged or destroyed. It need not reproduce the detail of a full debris-dispersion analysis; a relatively simple screening tool would suffice. Such a tool would identify the infrastructure assets within a defined zone around the pad and weight the risk to each by its value, its direction from the pad relative to the flight path, and its distance. Applied to each candidate site, the results would allow sites to be compared and ranked on residual third-party risk rather than on separation distance alone.

4.5. Implications for Practice

For launch providers, the a detailed site selection framework provides a sequence for early site screening: fix the operational determinants and design vehicle, apply the external criteria that cannot be mitigated and the internal criteria of land size, land cost and availability, terrain and utility access, and only then commit to detailed design. For regulators and planning authorities, the criteria offer a checklist against which applications can be assessed consistently, and the cadence estimates offer a benchmark for evaluating requested launch numbers.

4.6. Limitations

The study has several limitations. The evidence comes from five facilities in one Australian state, designed under one regulatory regime, and jurisdictions with different risk tolerances or geography may produce different criteria. The analysis relies on the experience of a single practitioner, which brings depth of access but also a risk of bias; this was mitigated by systematic document review and by cross-checking against published studies but not eliminated. Some project documents are commercially confidential and cannot be published in full. Documentary evidence was available for two of the five cases (C1 and C5). The development applications for C2–C4 are not public, so evidence for those cases rests on the first author's experience and cannot be independently coded or verified by others. Several design values rest on professional experience rather than published data, including axle loads and launch-rail fabrication, and are identified as such. Evidence for some criteria is limited in the cases studied, notably aerospace education and industry, which is included because prior studies identify it [6]. Finally, the criteria have not been weighted or tested on an independent set of candidate sites.

5. Conclusions

This study used five South Australian case studies to examine how conditions outside the boundary of a small-lift launch facility, and the infrastructure built within it, shape its design and the selection of its site.
Objective 1. External design considerations for small-lift launch facilities fall into seven groups. Their effect on a particular facility is set by five operational determinants, of which the design vehicle and launch cadence are the most influential. The external design considerations identified are:
  • Safety exclusion zones (EEZ, FPZ and PRZ)
  • External access – road, rail, port and airport networks
  • Launch vehicle, payload and component delivery
  • Flight path and trajectory access
  • Weather and natural hazards
  • Environment and community
  • Political, regulatory and social setting
The PRZ is the principal unresolved external consideration: the risk it carries to people and infrastructure is real, but it is neither bounded nor calculated when sites are selected.
The internal design of a small-lift launch facility comprises thirteen systems. Most are conventional industrial infrastructure; the launch-specific systems are acoustic suppression, the pad and flame trench, the launch tower or rail, lightning protection, propellant systems and the separation of control functions from the EEZ. The internal design considerations identified are:
  • Earthworks and civil works
  • Runway and internal roads
  • Water deluge and acoustic suppression
  • Launch pad and flame trench
  • Launch tower or launch rail
  • Lightning protection
  • Assembly and payload preparation buildings
  • Mission and range control
  • Propellant (fuel and oxidiser) systems
  • Utilities – water, power, wastewater and communications
  • Fire protection and emergency management
  • Security
  • Landscaping and dust control
Objective 2. Orbital facilities require coastal sites with at least 300 km, and preferably 500 km or more, of uninhabited ocean downrange, suitable latitude and no foreign territory along the trajectory; internally they need water deluge, a flame trench, heavier pads, towers and fixed propellant infrastructure. Suborbital facilities are better served by overland ranges that simplify recovery, can use a launch rail, a simple slab and campaign-only propellant storage, may need no deluge, and can sustain about twice the cadence per pad (about 42 compared with 20 launches per year). Pad EEZ allowances can be similar for both, and utility demands depend more on remoteness than on mission type.
Objective 3. External considerations generate 23 site selection criteria and internal design a further seven. The 30 criteria account for all 19 in the most comprehensive prior review. External criteria act as screens a site must satisfy without modification; internal criteria determine whether the required infrastructure can be built on it at acceptable cost. The site selection criteria identified are listed in Table 6.
Further research is recommended in four areas:
  • Defining and quantifying the Peripheral Risk Zone. Research is needed to define the extent of the PRZ as a function of vehicle class, propellant mass, flight safety system performance, flight phase and local winds, and to develop a siting-stage method for calculating the risk to people and to infrastructure within it – including ordinary assets such as dwellings, roads, power lines and wind turbines, and secondary hazards such as bushfire ignition. Such a method could build on the casualty-risk methodology of the Flight Safety Code [30] and on the property-damage and loss-of-use categories of the Maximum Probable Loss Methodology [43], and would allow candidate sites to be compared on residual third-party risk rather than on separation distance alone (Section 4.4).
  • Independent replication. Applying the method to other launch facilities whose approval documents are public, in Australia and overseas, to test the criteria beyond the first author's projects.
  • Criteria weighting. Weighting and prioritising the 30 criteria, for example by multi-criteria decision analysis, and testing them on independent candidate sites.
  • Acoustics. Measuring acoustic levels at small-lift pads with and without water deluge to establish when suppression is required.

Author Contributions

The first Author, Curran was responsible for conceptualization, methodology, investigation, validation, formal analysis and conclusions. Thorpe, D. was the principal supervisor and reviewed the research during its development. Murray, P. and Banerjee, S. were associate supervisors and reviewed the manuscript before finalization. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Institutional Review Board Statement

Not applicable.

Data Availability Statement

The approval documents for the Whalers Way Orbital Launch Complex (C1) are public record and available at https://plan.sa.gov.au/development_applications/state_development/impact-assessed-development/majors/major_projects/majors/sleaford_southern_launch. The RangeOz development application (C5) is not publicly available because it is commercially confidential; it was used with the permission of RangeOz Pty Ltd can be supplied to the Review Office on request. The approval documents for C2–C4 are not publicly available. The coding workbook is available on request.]

Acknowledgments

Figure 1 is the first author's own work – using Google Earth. Figure 2 is courtesy of Ian Spencer and Figure 3 is courtesy of HyImpulse Technologies GmbH. The authors have reviewed and edited the output and take full responsibility for the content of this publication. During the preparation of this work the first author used Claude (Anthropic) to improve the clarity and wording of selected sections, to review the manuscript for internal consistency, to check citations against their sources and propose corrections, which the first author reviewed. The AI tool was also used to generate Figure 4 by replicating excel tables prepared by the first author. After using this tool, the first author reviewed and edited the content as needed to ensure the integrity of the content and takes full responsibility for the published article. The other authors did not utilise AI in any manner on this research and paper.

Conflicts of Interest

The First Author, Curran, was formerly employed by Southern Launch, the developer of the Whalers Way Orbital Launch Complex and the Koonibba Test Range (cases C1–C4) and led the design and regulatory approvals of those facilities (2020–2023). He is currently the Chief Executive Officer of RangeOz Pty Ltd, the developer of the RangeOz Launch Facility (case C5). These relationships did not influence the research. The other authors declare no conflicts of interest.

Abbreviations

The following abbreviations are used in this manuscript:
AWTS Aerated wastewater treatment system
BAL Bushfire attack level
CFS Country Fire Service
DCCEEW Department of Climate Change, Energy, the Environment and Water
EEZ Explosive Exclusion Zone
FPZ Flight Path Zone
LEO Low Earth Orbit
LOX Liquid oxygen
MFR Mass flow rate
MVP Minimum Viable Product
NCC National Construction Code
PRZ Peripheral Risk Zone
SCEC Security Construction and Equipment Committee

Appendix A. Design Checklists

The checklists below condense the design considerations from the case projects for practitioners. They are not exhaustive and should be read with the relevant standards.
Table A1. Candidate propellants and handling class.
Table A1. Candidate propellants and handling class.
Fuel Handling Oxidiser Handling
Liquid hydrogen (LH2) Cryogenic Liquid oxygen (LOX) Cryogenic
Liquid methane (CH4) Cryogenic Hydrogen peroxide (high-test) Storable; decomposition hazard
Refined kerosene (RP-1) Storable Nitrous oxide (N2O) Self-pressurising; often chilled
Ethanol Storable Nitrogen tetroxide (N2O4) Storable; highly toxic (excluded)
Hybrid solid fuels: HTPB, paraffin wax, polyethylene Solid (no fuel system) Nitric acid (RFNA/IRFNA) Storable; highly toxic (excluded)
Hydrazine, MMH, UDMH Storable; highly toxic (excluded)
Table A2. Design checklist by system.
Table A2. Design checklist by system.
System Considerations
Earthworks and civil Geotechnical investigation; cut/fill balance and source of engineered fill; site falls to a lined basin; laydown areas; turning templates for launch-vehicle delivery; two site access points for emergency egress.
Runway and roads Transfer method (horizontal trailer or erector); length 100–300 m for small facilities; design load and axle load; pavement type (asphalt preferred near vehicles, gravel where cost requires); cross-runway conduits for future services; lighting; drainage.
Water deluge and wetting Need (orbital vs suborbital); energy source (gravity, pumped, hybrid); delivery type (rainbirds, annulus, waterfall, water bags); flow rate within budget; droplet size; pre-launch storage; post-launch capture, testing and disposal; edge protection.
Pad and flame trench Concrete mix and fibre reinforcement against spalling; sacrificial layer; above-, below-grade or hybrid trench; deluge interface; sump and pumps; confined-space access; interfaces with rail or tower, fuel, oxidiser, power, data and e-stops.
Launch tower or rail Vehicle type, height and mass; horizontal or vertical transfer; services on the tower; staff access and working at height; earthing and lightning; multi-vehicle adaptability; for rails: rigidity, machining tolerance, actuation (electric preferred), explosive-ordnance rating.
Lightning protection Height above the vehicle on the pad; tower positions relative to bunds; footing design; earthing; specialist design to AS/NZS 1768 [47].
Assembly building Horizontal or vertical assembly; ceiling height and clear floor area; explosive-ordnance construction and earthing for solid motors; clean room and positive pressure; temperature control; crane; heavy-vehicle access; emergency eye-wash and showers; security systems; visitor viewing.
Mission control On or off site; outside the EEZ; workstation numbers; UPS; secure server room; security zone required by clients under the PSPF and SCEC requirements [48]; controlled public viewing gallery.
Propellant systems Fuel and oxidiser types; multi-propellant capability; cryogenic insulation; remote, automated loading and de-fuelling; bunding and blast protection; flow, lift and interface pressure; recapture or flare stack/cold box; spill response; fire detection and suppression; separation per AS 1940 [49].
Utilities Water sources and storage for deluge, fire and potable use; wastewater sized to launch peaks; stand-alone or grid power with backup; redundant communications for range safety; waste management.
Fire and emergency Hydrants and fire water to NCC [38]; asset protection zones; on-site fire units; emergency lighting and PA; e-stops for deluge and propellant systems; external emergency services access.
Security Perimeter fence, gates and clear zones; CCTV; access control; SCEC-endorsed pits and pipes; cyber security of control and telemetry; export-control compliance.
Landscaping and dust Low-dust surfaces near vehicles; irrigated grass buffer around the pad; windbreaks and soil binders; native planting; fire-fuel management.

References

  1. Roberts, T.G. Spaceports of the World; Center for Strategic and International Studies: Washington, DC, USA, 2019. Available online: https://www.csis.org/analysis/spaceports-world (accessed on 14 March 2021).
  2. Taraila, W.M.; Asundi, S. Model-based systems engineering for a small-lift launch facility. Syst. Eng. 2022, 25, 537–550. [CrossRef]
  3. Finger, G.W.; Moore, S.W.; Gulliver, B.S. Implementing operationally responsive launch sites. In Proceedings of the SpaceOps 2010 Conference, Huntsville, AL, USA, 25–30 April 2010; AIAA 2010-2236. [CrossRef]
  4. Selvidge, P. From Airport to Spaceport: Designing for an Aerospace Revolution. Master’s Thesis, University of South Florida, Tampa, FL, USA, 2010. Available online: https://digitalcommons.usf.edu/etd/1764. (Accessed 11 October 2024).
  5. Finger, G.W.; Keller, D.L.; Gulliver, B.S. Public-private spaceport development. In Proceedings of the SpaceOps 2008 Conference, Heidelberg, Germany, 12–16 May 2008; AIAA 2008-3584. [CrossRef]
  6. AlKhaleefah, A.M. A Proposed Method for the Site Selection of Spaceports. Ph.D. Thesis, Purdue University, West Lafayette, IN, USA, 2025.
  7. Wild, G.; Baxter, G.; Ogawa, H.; Jonquille, R. Optimising the potential location of Spaceport Australia based on current suborbital space tourism requirements. In Proceedings of the 30th International Symposium on Space Technology and Science (ISTS), Kobe, Japan, 4–10 July 2015. Available online: https://www.researchgate.net/publication/292985003. (Accessed 14 October 2024).
  8. Waite, A.C.; DeLuna, A.T. Kodiak Launch Complex (KLC) -aka- Alaska Orbital Launch Complex (AOLC) history and lessons. In Proceedings of the SpaceOps 2012 Conference, Stockholm, Sweden, 11–15 June 2012. [CrossRef]
  9. Sterns, P.M.; Tennen, L.I. Commercial spaceports: Preliminary site selection criteria and regulatory considerations. J. Space Law 1996, 24, 29–35.
  10. Webber, D. Designing the orbital space tourism experience. AIP Conf. Proc. 2006, 813, 1041–1048.
  11. Finger, G.W.; Kercsmar, J.C.; Gulliver, B. Evolution of the commercial aerospaceport. In Proceedings of the SpaceOps 2010 Conference, Huntsville, AL, USA, 25–30 April 2010; AIAA 2010-2149. [CrossRef]
  12. Sgobba, T.; Allahdadi, F.A.; Rongier, I.; Wilde, P.D., Eds. Safety Design for Space Operations; Butterworth-Heinemann (Elsevier): Oxford, UK, 2013.
  13. Gerhard, M.; Reutzel, I. Law related to space transportation and spaceports. In Routledge Handbook of Space Law; Jakhu, R.S., Dempsey, P.S., Eds.; Routledge: London, UK, 2016. [CrossRef]
  14. Dachyar, M.; Purnomo, H. Spaceport site selection with analytical hierarchy process decision making. Indian J. Sci. Technol. 2018, 11, 1–8. [CrossRef]
  15. Chang, Y.-W.; Chern, J.-S. A preliminary study on the potential spaceports for suborbital space tourism and intercontinental point-to-point transportation in Taiwan. Acta Astronaut. 2021, 181, 492–502. [CrossRef]
  16. Lubert, C.P. Sixty years of launch vehicle acoustics. Proc. Meet. Acoust. 2017, 31, 040004. [CrossRef]
  17. Kandula, M. Broadband shock noise reduction in turbulent jets by water injection. Appl. Acoust. 2009, 70, 1009–1014.
  18. Souto, C.D.A.; Pirk, R. Acoustic loads on a sounding rocket lift-off. In Proceedings of the 19th International Congress of Mechanical Engineering (COBEM 2007), Brasília, Brazil, 5–9 November 2007; ABCM: São José dos Campos, Brazil, 2007.
  19. Sutton, G.P.; Biblarz, O. Rocket Propulsion Elements, 9th ed.; John Wiley & Sons: Hoboken, NJ, USA, 2017.
  20. Calle, L.M.; Hintze, P.E.; Parlier, C.R.; Sampson, J.W.; Bucherl, C.N.; Curran, J.P.; Kolody, M.R.; Perusich, S.A.; Whitten, M.C. Launch pad flame trench refractory materials. In Proceedings of the SpaceOps 2010 Conference, Huntsville, AL, USA, 25–30 April 2010; AIAA 2010-2016. [CrossRef]
  21. Calle, L.M.; Hintze, P.E.; Parlier, C.R.; Curran, J.P.; Kolody, M.R.; Sampson, J.W.; Montgomery, E.M. Testing Requirements for Refractory Materials; NASA/TM-2010-216293; NASA Kennedy Space Center: Kennedy Space Center, FL, USA, 2010. Available online: https://ntrs.nasa.gov/citations/20110005479 (accessed on 4 November 2026).
  22. Medelius, P.J.; Roeder, W.P.; Willingham, J. Lightning protection at the Kennedy Space Center and Cape Canaveral Air Force Station. In Proceedings of the 10th Conference on Aviation, Range, and Aerospace Meteorology, Portland, OR, USA, 13–16 May 2002; American Meteorological Society: Boston, MA, USA, 2002.
  23. Southern Launch. Whalers Way Orbital Launch Complex—Environmental Impact Statement; Southern Launch Space Pty Ltd: Adelaide, Australia, 2021.
  24. Southern Launch. Whalers Way Orbital Launch Complex—Response Document; Southern Launch Space Pty Ltd: Adelaide, Australia, 2022.
  25. State Planning Commission. Whalers Way Orbital Launch Complex—Sleaford, Eyre Peninsula: Assessment Report; Government of South Australia: Adelaide, Australia, 2024.
  26. RangeOz Pty Ltd. RangeOz Sub-Orbital Rocket Launch Facility—Development Application; ROz-ADM-26-0010 Rev E, including Appendices A–L; RangeOz Pty Ltd: Australia, 19 October 2026.
  27. Braun, V.; Clarke, V. Using thematic analysis in psychology. Qual. Res. Psychol. 2006, 3, 77–101. [CrossRef]
  28. United Nations SaferGuard. Explosion Danger Area Calculator. International Ammunition Technical Guidelines. Available online: https://unsaferguard.org/un-saferguard/explosion-danger-area (accessed on 19 April 2024).
  29. Space (Launches and Returns) Act 2018 (Cth), s. 8; Federal Register of Legislation: Canberra, Australia. Available online: https://www.legislation.gov.au/C2004A00391 (accessed on 4 November 2026).
  30. Australian Space Agency. Flight Safety Code; Australian Government: Canberra, Australia, 2019. Available online: https://www.space.gov.au/about-agency/publications/flight-safety-code (accessed on 8 November 2024).
  31. Wertz, J.R.; Everett, D.F.; Puschell, J.J., Eds. Space Mission Engineering: The New SMAD; Space Technology Library Volume 28; Microcosm Press: Hawthorne, CA, USA, 2011.
  32. Gebrehiwot, L.; Abeselom, E.; Girma, B.; Nigussie, B.; Zegeye, A.; Abraham, Y.; Alemayehu, Y.; Solomon, G. Rocket launching site selection in Ethiopia using weight decision matrix analysis. Geografia 2023, 19, 1–19. [CrossRef]
  33. Melo, H.V.F.; da Silva, E.J.; Amaral, F.C.F.; Bahdur, A.D. Sustainable site planning for new launch facilities at spaceports. Acta Astronaut. 2025, 228, 176–190. [CrossRef]
  34. Zoppellari, E.; Juvé, D. Reduction of jet noise by water injection. In Proceedings of the 3rd AIAA/CEAS Aeroacoustics Conference, Atlanta, GA, USA, 12–14 May 1997; AIAA-97-1622. [CrossRef]
  35. Zolla, P.M.; Fiore, M.; Lapenna, P.E.; Bianchi, D.; Nasuti, F. A design strategy for water-based noise suppression systems in liquid rocket engines firing tests. CEAS Space J. 2023, 15, 597–611. [CrossRef]
  36. Kalifa, P.; Chéné, G.; Gallé, C. High-temperature behaviour of HPC with polypropylene fibres: From spalling to microstructure. Cem. Concr. Res. 2001, 31, 1487–1499. [CrossRef]
  37. Environment Protection Authority South Australia. Bunding and Spill Management; EPA 080/12; EPA: Adelaide, Australia, 2012.
  38. Australian Building Codes Board. National Construction Code 2022, Volume One; ABCB: Canberra, Australia, 2022.
  39. United Nations Office for Disarmament Affairs. International Ammunition Technical Guideline IATG 01.80: Formulae for Ammunition Management, 3rd ed.; UN SaferGuard: New York, NY, USA, 2021. Available online: https://unsaferguard.org.
  40. Finger, G.W.; McCleskey, C.M. Spaceport performance measures. In Proceedings of the SpaceOps 2010 Conference, Huntsville, AL, USA, 25–30 April 2010. Available online: https://ntrs.nasa.gov/citations/20100039456. (Accessed 12 September 2024).
  41. Levinson, R.; Brink, J.; Frank, J. Analyzing Launch Operations Using the Spaceport Throughput Analysis Resource (STAR); NASA Technical Report; NASA: Washington, DC, USA, 2024. Available online: https://ntrs.nasa.gov/citations/20240003154 (accessed on 14 June 2025).
  42. Babb, R. Building a 21st Century Multi-User Commercial Spaceport: Development and Application of the Spaceport Readiness Level Scale. Master’s Thesis, Embry-Riddle Aeronautical University, Daytona Beach, FL, USA, 2019. Available online: https://commons.erau.edu/edt/478. (Accessed 26 April 2025).
  43. Australian Space Agency. Maximum Probable Loss Methodology; Australian Government: Canberra, Australia, 2019. Available online: https://www.space.gov.au/about-agency/publications/maximum-probable-loss-methodology (accessed on 4 November 2026).
  44. Federal Aviation Administration. Safety criteria. In Launch and Reentry License Requirements; 14 CFR § 450.101; U.S. Government Publishing Office: Washington, DC, USA, 2020. Available online: https://www.ecfr.gov/current/title-14/chapter-III/subchapter-C/part-450/subpart-C (accessed on 4 November 2026).
  45. Range Commanders Council. Common Risk Criteria Standards for National Test Ranges; RCC 321-20; Range Commanders Council Secretariat: White Sands Missile Range, NM, USA, 2020. Available online: https://apps.dtic.mil/sti/pdfs/AD1099040.pdf (accessed on 4 November 2026).
  46. Ayala Fernández, L.; Wiedemann, C.; Braun, V. Analysis of space launch vehicle failures and post-mission disposal statistics. Aerotecnica Missili Spazio 2022, 101, 243–256. [CrossRef]
  47. Standards Australia. AS/NZS 1768:2021 Lightning Protection; Standards Australia: Sydney, Australia, 2021.
  48. Department of Home Affairs. Protective Security Policy Framework, Release 2026; Australian Government: Canberra, Australia, 2026. Available online: https://www.protectivesecurity.gov.au (accessed on 4 November 2026).
  49. Standards Australia. AS 1940:2017 The Storage and Handling of Flammable and Combustible Liquids; Standards Australia: Sydney, Australia, 2017.
Figure 1. Safety zones around a launch facility: Explosive Exclusion Zone (EEZ), Flight Path Zone (FPZ) and Peripheral Risk Zone (PRZ). (Based from Google Earth).
Figure 1. Safety zones around a launch facility: Explosive Exclusion Zone (EEZ), Flight Path Zone (FPZ) and Peripheral Risk Zone (PRZ). (Based from Google Earth).
Preprints 245783 g001
Figure 2. TED suborbital rocket, with its helical launch rail in the background.
Figure 2. TED suborbital rocket, with its helical launch rail in the background.
Preprints 245783 g002
Figure 4. Framework linking operational determinants, external considerations and internal design systems to site selection for small-lift launch facilities.
Figure 4. Framework linking operational determinants, external considerations and internal design systems to site selection for small-lift launch facilities.
Preprints 245783 g004
Table 1. Representative studies proposing site selection criteria for launch facilities.
Table 1. Representative studies proposing site selection criteria for launch facilities.
Study Year No. of criteria Perspective
Sterns & Tennen [9] 1996 8 Commercial spaceport siting and regulation
Webber [10] 2006 7 Orbital space tourism
Finger et al. [11] 2010 8 Evolution of commercial aerospaceports
Sgobba et al. [12] 2013 7 Safety design for space operations
Wild et al. [7] 2015 5 Suborbital space tourism (Australia)
Gerhard & Reutzel [13] 2016 5 Space transportation and spaceport law
Dachyar & Purnomo [14] 2018 12 AHP-based national spaceport site selection (Indonesia)
Roberts [1] 2019 7 Global survey of spaceports
Chang & Chern [15] 2021 5 Conversion of airports to suborbital spaceports
AlKhaleefah [6] 2025 19 (12 factors, 7 constraints) Consolidated review and site selection method
Table 2. Case-study launch facilities and evidence base.
Table 2. Case-study launch facilities and evidence base.
Case Facility Mission type Design scope Design period Evidence base
C1 Whalers Way Orbital Launch Complex, Eyre Peninsula Orbital Full, permanent facility 2020-2024 Approval documents (public record) and practitioner experience
C2 Whalers Way - MVP facility Orbital MVP, temporary 2021-2022 Practitioner experience only (documents not public)
C3 Koonibba Test Range – MVP Facility Suborbital MVP, temporary 2020–2021 Practitioner experience only (documents not public)
C4 Koonibba Test Range Suborbital Full, permanent facility 2020–2021 Practitioner experience only (documents not public)
C5 RangeOz Launch Facility Suborbital Full, permanent; vehicles to ~3,500 kg wet mass 2025–2026 Development application (used with permission) and practitioner experience
Table 3. Operational determinants and their effect on design and site selection.
Table 3. Operational determinants and their effect on design and site selection.
Determinant Effect on design Effect on site selection
Mission type Orbital vehicles are larger (from about 10,000 kg wet mass for small-lift to over 3,000,000 kg for super heavy-lift) and need permanent assembly, propellant and deluge systems; suborbital facilities can use mobile launchers (MVP). Orbital: coastal site with an open-water downrange corridor. Suborbital: inland site with an overland recovery zone preferred.
Trajectory / target orbit Defines launch azimuths and the range-safety corridor for the intended vehicle flight paths [31] (p. 222). Latitude and an unobstructed downrange corridor in the required azimuths.
Single or multi-user A multi-user facility must accommodate users not yet identified, adding versatility at significant cost. Transport networks, EEZ and acoustic footprint must suit the largest prospective vehicle; varying impacts increase stakeholder risk.
Single or multi-vehicle A design vehicle specification is needed: height, diameter, wet and dry mass, stages, propellant and oxidiser types and masses, other fluids, payload capacity and thrust. For unknown vehicles, the largest vehicle envisaged or authorised governs. EEZ extent, acoustic impact and environmental footprint are sized to the design vehicle.
Launch cadence Determines the number of pads, processing and maintenance capacity, and the scale of environmental and stakeholder management. Higher cadence increases cumulative impacts in the PRZ, favouring remote sites.
Table 4. External design considerations, their design requirements and the site selection criteria they generate.
Table 4. External design considerations, their design requirements and the site selection criteria they generate.
External consideration Principal design requirement Criteria (Table 6)
Safety exclusion zones EEZ sized for the design vehicle; FPZ and drop zones cleared of people, aircraft and vessels during launch; PRZ risk to people and infrastructure minimised. Emergency services able to respond to incidents at the site and in the PRZ. 2, 4, 27
External access Road, rail, port and airport networks able to carry oversized, fragile, high-value or hazardous cargo; intersection and access-road upgrades costed; traffic impacts managed. 14, 15, 16
Vehicle, payload and component delivery Suitable combination of transport modes; terrain and road geometry suited to large loads; network quality that avoids transit damage; transport security. 16, 18
Flight path and trajectory access Latitude suited to target orbits; unobstructed downrange corridor; coastal frontage (orbital) or overland range (suborbital); air and sea traffic cleared; no overflight of foreign territory. 5, 7, 8, 10, 21, 22
Weather and natural hazards Operations and infrastructure resilient to wind, lightning, cyclone, tsunami, earthquake and snow, some of which cannot be mitigated. 12, 13
Environment and community Acoustic, emissions, fire, light-spill and contamination impacts mitigated; social licence maintained with nearest receptors; community support won and kept. 9, 11, 17
Political, regulatory and social setting Stable jurisdiction; regulatory approval of launch numbers and risk; available workforce; a service centre within reach; local aerospace education and industry. 6, 20, 28, 29
Table 5. Internal design systems, principal requirements and case evidence.
Table 5. Internal design systems, principal requirements and case evidence.
System Principal launch-specific requirement Case evidence
Earthworks and civil Level, graded pads draining to a lined basin; footprint sized to the design vehicle and its EEZ. C1: 2% falls; 350 × 120 m site per pad. C5: flat 1–2% site; 1.4 ha compound.
Runway and internal roads Transfer roadway between assembly building and pad; roads for a 19 m semi-trailer; dust control. C1: 200 × 5 m concrete/asphalt runway. C5: 71.5 × 10 m concrete runway; PM20 gravel roads.
Water deluge and acoustic suppression Deluge to reduce acoustic energy and protect concrete; or, for small vehicles, pre-launch ground wetting. C1: 1,000 L/s, 150 kL elevated tank, gravity-fed. C5: no deluge; ~34 kL wetting per launch.
Launch pad and flame trench Pad able to resist heat, thrust and lifting loads; trench to direct exhaust and capture deluge water. C1: ~1.0 m reinforced pad, possibly piled; 5 × 35 m trench with sump. C5: 55 × 15 m pad, no trench.
Launch tower or rail Tower and umbilicals for liquid orbital vehicles; rigid, precisely machined rail for unguided suborbital vehicles. C5: 17 m T-slot launch rail.
Lightning protection Rods or towers taller than the vehicle on the pad. C1: up to four ~35 m rods. C5: three 22 m towers.
Assembly and payload buildings Horizontal assembly; explosive-ordnance-rated construction where solid motors are handled; clean payload space. C5: 30 × 22 m portal frame; separate payload preparation building.
Mission and range control Located outside the EEZ; maybe off site; firing staff protected. C1: range control outside the safety buffer. C5: mission control 3.2 km away; 600 mm-covered firing bunker.
Propellant systems Remote loading and de-fuelling; bunded storage; scrub disposal; exclusion of highly toxic propellants. C1: storage 20 m from pad, blast walls, flare stack and cold box. C5: 5 kL fuel and oxidiser, >160% bunds, no hydrazine.
Utilities Self-sufficient water, power, wastewater and redundant communications at remote sites. C1: 30 ML dam; generators. C5: carted water; ~145 kW stand-alone power; Starlink plus two backups.
Fire protection and emergency Hydrant water to NCC, asset protection zones, on-site fire units. C1: NCC clearances, tanks then dam. C5: 250 kL fire tank; APZs; fire-rating launch rules. Local volunteer fire brigades.
Security Perimeter fencing, CCTV, access control; classified zones where clients require. C1: peninsula site needing a single landward boundary fence; 2.4 m fence, CCTV, alarmed buildings.
Landscaping and dust Low-dust surfaces near vehicles and electronics; irrigated buffer around the pad. C5: 5,160 m² native grass; dust-prone sandy soils.
Table 6. Site selection criteria derived from external and internal design considerations.
Table 6. Site selection criteria derived from external and internal design considerations.
No. Criterion Group Applies to
1 Type of vehicle to be launched Mission and vehicle Both
2 Safety exclusion zones Safety and population Both
3 Land size Internal design Both
4 Surrounding population and infrastructure Safety and population Both
5 Launch trajectories Geography and trajectory Both (critical for orbital)
6 Political, legislative and social environment Socio-political Both
7 Nations within 500 km along trajectory Geography and trajectory Orbital
8 Latitude Geography and trajectory Both (critical for orbital)
9 Environmental impact Natural environment Both
10 Coastal access (orbital) or appropriate overland range (suborbital) Geography and trajectory Both (coastal for orbital, overland for suborbital)
11 Noise and nearest receptors Safety and population Both
12 Natural disaster risk Natural environment Both
13 Weather Natural environment Both
14 Large harbour Logistics and access Both
15 Large airport Logistics and access Both
16 Existing roads and rail Logistics and access Both
17 Community support Socio-political Both
18 Mainland site Logistics and access Both
19 Location security Internal design Both
20 Workforce and population Socio-political Both
21 Air traffic corridors Airspace and maritime Both
22 Shipping corridors Airspace and maritime Orbital (and over-water suborbital)
23 Land cost and availability Internal design Both
24 Terrain type (topography and slope) Internal design Both
25 Availability of construction resources Internal design Both
26 Utility access Internal design Both
27 Emergency services Local services Both
28 Support services Local services Both
29 Aerospace education and industry Socio-political Both
30 Amenities access Internal design Both
Table 7. Internal design drivers and case evidence for the internal criteria.
Table 7. Internal design drivers and case evidence for the internal criteria.
No. Criterion Internal driver and case evidence
3 Land size Pads, control and test facilities must sit outside each other's EEZ; C1 two 4.2 ha pads plus buffers; C5 3,100 m EEZ within a 990 ha holding.
19 Location security Perimeter fencing, CCTV and access control; natural boundaries reduce the length of fence and the number of access points. C1, on a peninsula, needed a single landward boundary fence [23] (p. 203).
23 Land cost and availability A holding large enough for the facility and its EEZ must be secured at acceptable cost; land is cheaper and more readily available in remote areas than near towns, and C1 preferred freehold land to national parks [23] (p. 154).
24 Terrain type (topography and slope) Pads, runway and buildings need near-level ground; both cases on 1–2% slopes. Ground conditions also govern pad foundations (possibly piled at C1) and dust (sandy soils at C5).
25 Availability of construction resources Precast and concrete from the nearest town (C5); suitable local material for the roads, bases and sub-base courses (C1 & C5); contractors and materials.
26 Utility access Water for deluge, firefighting and potable use, and power and communications for pumps, control systems and range safety links; C1 30 ML dam; C5 carted and harvested water; both stand-alone power and communications.
30 Amenities access Staff accommodation, catering and welfare must be built on or near the site where no town is within reach; C1 sought a service centre within about an hour's travel [23] (p. 142).
Table 8. External and internal differences between the orbital (C1) and suborbital (C5) cases.
Table 8. External and internal differences between the orbital (C1) and suborbital (C5) cases.
Aspect Orbital Suborbital
Preferred location Coastal, with direct sea frontage Inland, with an overland range
Downrange corridor At least 300 km, ideally 500 km or more, of uninhabited ocean Overland range of up to several hundred kilometres preferred for recovery
Spent stages and payload Stages fall into ocean drop zones Payload and stages recovered over land – safer/cheaper/easier than from water.
Exclusion zones Larger EEZ and longer FPZ owing to higher energy and wider debris dispersion Smaller hazard footprint and shorter flights
Airspace and maritime Extensive closures along a long FPZ Localised airspace closures
Neighbouring nations Overflight within 300–500 km raises diplomatic issues Rarely relevant
Latitude Determines achievable orbits Minor influence
Environmental and PRZ impacts Higher, owing to larger vehicles Lower acoustic generation and exhaust
Community support 268 submissions (261 public); concerns led to design changes DA process currently underway.
Emergency services Plan prepared with SA Police, CFS and SA Ambulance Plan prepared with SA Police, CFS and SA Ambulance
Support services and amenities Service town within about 30 minutes sought, to avoid fly-in fly-out staffing Site within 40 minutes of local town. Still require FIFO
Aerospace education and industry Potential economic benefit only - Access to Adelaide educational facilities Potential economic benefit only – Access to Adelaide educational facilities
Infrastructure Permanent assembly, propellant and deluge systems MVP mobile launchers feasible
Achievable cadence About 20 launches per pad per year (42 authorised for 2 pads) About 42 launches per pad per year
Design vehicle Up to ~100 t (Site A), ~60 t (Site B) Up to ~3,500 kg
Launch compound 350 × 120 m per pad 215 × 65 m
Acoustic suppression Water deluge 1,000 L/s; flame trench None; ~34 kL pre-launch wetting
Launch support Pedestal and tower/umbilicals 17 m T-slot launch rail
Pad ~1.0 m reinforced, possibly piled 55 × 15 m slab
Lightning protection Up to four ~35 m rods Three 22 m towers
Runway ~200 m ~72 m
Propellants Fixed storage 20 m from pad; flare stack, cold box Campaign-only 5 kL each; >160% bunds
Control Range control outside safety buffer Mission control 3.2 km away; firing bunker
Location security Peninsula; single landward boundary fence Remote and cannot be seen from public areas – fences/lighting/cameras
Pad EEZ allowance Nominal 3,120 m (Site A), 2,100 m (Site B) Space for 3,100 m
Utilities 30 ML dam; generators No services; carted water; stand-alone power; satellite communications
Table 9. Criteria from this study compared with those consolidated by AlKhaleefah [6].
Table 9. Criteria from this study compared with those consolidated by AlKhaleefah [6].
No. This study (external criteria) Corresponding AlKhaleefah criterion AlKhaleefah criteria not matched externally (→ internal criterion)
1 Type of vehicle to be launched – Secure area (→ 19)
2 Safety exclusion zones Protected lands Land availability (→ 23)
4 Surrounding population and infrastructure Low population density Terrain assessment (slope) (→ 24)
5 Launch trajectories Launch azimuth; Flight path Utility access (→ 26)
6 Political, legislative and social environment – Amenities access (→ 30)
7 Nations within 500 km along trajectory –
8 Latitude Equatorial distance
9 Environmental impact –
10 Coastal access (orbital) or appropriate overland range (suborbital) –
11 Noise and nearest receptors Noise impact
12 Natural disaster risk High-risk area
13 Weather High-risk area
14 Large harbour –
15 Large airport –
16 Existing roads and rail Transport access
17 Community support Community support
18 Mainland site –
20 Workforce and population Workforce access
21 Air traffic corridors Air traffic interference
22 Shipping corridors –
27 Emergency services Emergency services
28 Support services Support services
29 Aerospace education and industry Aerospace education/industry
Table 10. Approved and achieved launch cadence at selected launch sites.
Table 10. Approved and achieved launch cadence at selected launch sites.
Site Location Operational since Launch type Pads Approved cadence Achieved / status
Rocket Lab LC-1 Māhia Peninsula, New Zealand 2017 Orbital 2 1 launch per 72 h (about 120/year) 64 orbital launches to 2025
Andøya Space Centre Andøya, Norway 1962 Suborbital Multiple – About 1,200 launches 1962–2022 (about 20/year)
Guiana Space Centre Kourou, French Guiana 1968 Orbital 6 – Over 320 launches (about 6/year)
Whalers Way Orbital Launch Complex South Australia Not yet operational Orbital and suborbital 2 36/year (maximum 6 suborbital) 3 unsuccessful suborbital attempts
Koonibba Test Range South Australia 2021 Suborbital 1 26/year 6 launches since 2022
RangeOz Launch Facility South Australia Scheduled late 2027 Suborbital 1 26/year (planned) Under development
Bowen Orbital Spaceport Queensland, Australia 2025 Orbital 1 90/year sought unknown if this is approved 1 launch to date
SaxaVord Spaceport Unst, Shetland, UK 2024 Orbital 3 (planned) 30/year (licensed) 1st launch scheduled for 2027
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.