Submitted:
30 October 2026
Posted:
03 November 2026
You are already at the latest version
Abstract
Gates move in finite steps and ignore changes below a deadband, so a gate opening from closed passes at least one quantum per step. For max–min delivery at a canal node through sealing gates that start the day closed, with exact levels and executed commands, it is proved that direct execution excludes users with plans below 1 − 1/(2k) of a quantum, k the deadband in resolution steps. Minimum deliveries cost the max–min level at most the summed quanta over total demand, and whole steps the summed step volumes over the demand of outlets still above quanta. A θ pulse rule serves every positive plan below the daily pulse capacity within −θ to +1 pulse, and carrying the debt forward bounds the cumulative error by one pulse. For ten recorded seasons at the Dustlik node, Kegeyli canal, Uzbekistan, the gates lowered the max–min level of a static constant-level allocation by under 0.001. In closed-loop Saint–Venant simulation with plan-derived demands, direct execution excluded the smallest regulator on exactly the 77 predicted early-April days of assumed demand, pulse rules served it, and carry-over cut its unweighted mean absolute dekadal error from 6.5% (pulse rule) to 1.0% of demand, shifting deliveries between days.
Keywords:
max–min fairness
; equitable water distribution
; irrigation canal automation
; gate resolution
; actuator deadband
; quantisation
; rounding
; sigma–delta modulation
; Saint–Venant equations
; Amu Darya
1. Introduction
Where canal water is short, the way a shortage is shared among the users of a canal decides who can irrigate. In the lower Amu Darya basin, at the tail of one of the most depleted river systems [1], canal operators distribute limited and variable supplies among the many off-takes of main canals, a recognised operational problem [2,3,4]. Equity of delivery is a standard performance measure of irrigation systems [5], and equitable distribution under constrained supply is a design goal of canal automation [6]. A max–min (worst-user) plan gives every user the same, largest possible share of its demand; lexicographic refinements of this criterion are well developed for resource allocation [7,8] and water allocation [9,10].
Such plans are computed with continuous variables, but they are executed by gates. Canal automation has a mature theory of the control of levels and discharges [11,12,13], tested on standard test cases [14] and implemented on large networks [15,16,17]. In practice, a gate is positioned with a finite resolution, and a change of position is executed only if it exceeds a deadband or a minimal movement, which protects the drive from wear and the control loop from hunting. Field systems report gate positions resolved to about 1 mm and moved in whole pulse counts [18], a minimal gate movement of 1 cm on a 3.3 m travel [19], and gate deadbands of 1.5 to 6 cm [20,21,22]; the test cases of canal control restrict the minimum gate movement to 0.5% of the gate height [14]. These features have been studied as causes of water-level oscillation, steady-state errors and a trade-off with the number of gate actions [20,22,23,24,25]; in anticipatory open-loop control of the test cases, check-gate changes limited to the regulation interval and the minimum gate movement, with the volume left undelivered carried to the next interval, raised the largest level deviations but kept the integrated level errors and the delivery errors of the offtakes, modelled as orifices, at about 1% or less with tuned hydraulic parameters [26]. In the literature searched (Section S7), they have not been studied as a cause of the exclusion of individual users from a fair plan. Small openings are known to be the least accurate settings of turnout gates [27], and the operating precision of structures has been related to equity only through continuous tolerances of levels and settings [28].
A closed gate that opens at least by its deadband cannot deliver less than the volume of that opening in one control step, a quantum of water. A daily plan below about one quantum is then either not delivered at all or delivered with a surplus, and the daily max–min level, the quantity the plan maximises, cannot describe the service of such a user. Discrete deliveries are familiar in irrigation scheduling, where outlets run at fixed discharges and schedules are found by 0-1 or mixed-integer programming [29,30,31,32], where the inequity of cumulative depths among channels closed or run at [33] or near [34] capacity is minimised, and where demands are rounded to units of the supply with the residual assigned to one channel [35]. None of these studies derives when the indivisible volume of a gate excludes a user from a fair plan, how much of the max–min level it can cost, or how much an execution rule that avoids the exclusion deviates from the plan.
The mathematics needed for these questions is classical in other fields. Rounding entitlements to whole units is the subject of apportionment theory, whose rounding rules and their deviations from the exact quota are well understood [36,37]; carrying a rounding error to the next period is the principle of sigma–delta modulation, whose accumulated error stays bounded [38,39]; and the loss of welfare caused by fairness or by indivisible goods is measured by prices of fairness and integrality gaps [40,41,42]. Quantised control studies the stabilisation of systems with quantised measurements or inputs [43,44], not the fair delivery of volumes. In the literature searched, these tools have not been connected to the execution of fair delivery plans by quantised gates.
This study connects them. A gate with a resolution and a deadband is modelled by its step volumes: one resolution step, the quantum of the smallest executable opening, and the pulse one step above it. On this model, the paper proves four results (Section 2.5): (1) direct execution of a daily plan, the usual execution of a continuous schedule, excludes a user whose plan is below 1 − 1/(2k) of a quantum, where k is the number of resolution steps in the deadband, whereas an equal split over open steps separated by closed ones keeps the daily error of a plan of at least one quantum that fits into the day within half a resolution step; (2) the price of indivisibility, the loss of the max–min level caused by the minimum deliveries of the gates, is at most the sum of the quanta over the sum of the demands and, on a day of deficit with at least the sum of the quanta available, vanishes if and only if every user’s max–min share is at least one quantum, and the steps above the quanta cost at most the sum of the step volumes over the demand of the outlets served above their quanta at the lowered level, which separates, in a static model, unavoidable losses from losses of the execution rule; (3) a pulse rule with a threshold θ, started from the closed position, never excludes a user whose plan is below the daily pulse capacity and bounds its daily shortfall by θ times a pulse and its over-delivery by one pulse; and (4) carrying the daily debt over to the next day keeps the cumulative error within one pulse, so that the relative error over an accounting period of T days decays as 1/T for a mean daily demand bounded away from zero. Results (3) and (4) are specialisations of stationary rounding and first-order sigma–delta modulation, stated with the constants of the gate.
The results are then tested in closed-loop simulations of the Dustlik node of the Kegeyli canal, Uzbekistan, with a Saint–Venant model of the reach, the recorded supply of ten growing seasons and plan-derived demands, with the quantised actuator alone and with a full device chain, and with other deadbands, gate coefficients, leaking gates and outlet ratings.
2. Materials and Methods
2.1. Study Site and Data
The study node is the Dustlik hydraulic node (PK 114+40) of the Kegeyli canal in the lower Amu Darya basin, Karakalpakstan, Uzbekistan. The canal receives water from the Dustlik main canal through the Kegeyli head regulator (160 m3 s−1); its first reach, 11.44 km long, ends at the node, where a barrier with five 8.0 × 2.5 m gates passes water to the lower Kegeyli canal and five regulators supply off-take canals (Table 1). The six outlets are the users j = 1,…,6 of the allocation. The five regulators (j = 1,…,5) are the outlets whose execution is studied; the barrier (j = 6) holds the node level, passes the rest of the inflow and is not operated by the execution rules. The smallest regulator, R-1 (j = 2), supplies an on-farm canal that irrigates 120 ha. A single controlled pool with an off-take node is the building block of the test cases for canal control [14].
The supply S(t) is the daily discharge recorded at the head regulator in the growing seasons of 2010–2019 (1 April–30 September, 10 × 183 days). Its 87 blank entries (4.8% of the days), in ten runs of 1–15 days, 54 of the days at the beginning or the end of a season, are treated as days without delivery. The records do not distinguish such a day from a missing record, but on 39 of these days the records of the Dustlik head and of the Kuanyshjarma and Kokozek canals leave at most 2 m3 s−1 for the Kegeyli canal, which indicates a closed canal (Table S1c); Section 3.6 gives the outcome with the blank days excluded from the evaluation. With two recorded zeros, the 89 days without supply are the same for every rule. On the 114 steady days of the 2020 dispatcher sheets, the ratio of the discharge upstream of the node to the head discharge has a median of 0.81, the delivery factor η, which combines the unrecorded withdrawals of 20 small off-takes along the reach, seepage and gauge bias. No measured demand exists for individual outlets, so the demand at the node is derived from the system plan:
where is the mean discharge of a dekad (a ten-day period) in the 2021 growing-season plan of the Kegeyli system, σj,mon the share of outlet j in the month of day s (the observed 2020 share of Abad-Yarmish, the rest in proportion to irrigated area) and Δday = 86,400 s. The same profile is applied in every year, so it is a planning reference, not a reconstruction of each year’s demand. In 1–10 April the plan contains only its non-irrigation component, which Equation (1) distributes among the outlets; the resulting demand of R-1, 21.7 m3 per day, is a reference value that the records do not confirm. The daily volume available at the node is W(s) = η S(s) Δday.
2.2. Quantised Gates
All gates are vertical sluice gates represented by the orifice relation
where Q is the discharge, b the gate width, a the opening, Cd = 0.62 the discharge coefficient (assumed), g the gravitational acceleration, h the level upstream of the node and hd the tail-water level of the outlet (assumed), both measured from the bed of the reach. Relation (2) is the submerged form, applied to the small openings studied here; in the plant, is smoothed for heads below 1 cm and the opening is limited by the upstream depth (Section S2).
The actuator positions a gate on a grid a = nρ, n ∈ {0,1,…,nmax}, with the resolution ρ = 0.1% of the travel. It rounds a command acmd to the nearest grid point, ncmd = nint(acmd/ρ), and executes it only when the change is at least the deadband δ = 0.5% of the travel, except a full closure, which is always executed:
with k = ⌈δ/ρ⌉.
A gate that is closed therefore opens at least k = 5 resolution steps, 7.5 mm at a small regulator, whose travel is 1.5 m. The resolution and the deadband are assumed, because no actuator has been selected for the node. The deadband equals the minimum gate movement of the test cases of canal control [14] and is of the order of those reported from the field (Section 1); deadbands of 0.25% (k = 3) and 1% (k = 10) are robustness cases.
Because discharge (2) with a fixed tail water is proportional to the opening, one control step of length Δt = 900 s at level h passes n v(h) through an opening of n resolution steps, with
The quantum q(h) is the smallest volume that a closed gate can deliver in one step; the pulse p(h) is the volume of the opening one resolution step above the deadband, which rounding cannot move back into it. During a day the level stays within [hmin,hmax], so the step volumes lie between vmin and vmax, qmin and qmax, pmin and pmax. The tail water of the barrier is the normal depth of the lower Kegeyli canal at the barrier discharge, so its discharge is not proportional to the opening: over the operating range, its quantum is 1810–2122 m3, and raising its opening by one resolution step adds at most 375–437 m3 in a control step, at small openings.
2.3. Max–Min Plan and the Minimum-Delivery Level
On a day with available volume W and demands Dj > 0 (an outlet without demand receives nothing and is left out), the continuous max–min level of satisfaction is
attained by the plan xj = λ*Dj when the outlet capacities do not bind. Under the assumptions (H1) and (H3) of Section 2.5, a gate delivers in a day either nothing or at least qmin (Lemma A2 in Appendix A); for a gate that starts the day open, this lower bound need not hold. For given quanta qj ≥ 0, the minimum-delivery level is
and with no execution that delivers at most W reaches a level above it. The difference
is called here the price of indivisibility, by analogy with the price of fairness [40]; it is the additive integrality gap of the on/off formulation qjyj ≤ Vj ≤ Mjyj, yj ∈ {0,1}, with Mj ≥ max{W, qj}, whose relaxation is then the continuous problem. The same name denotes a ratio of welfare levels in cake cutting [45]; max–min allocation of indivisible items is studied with gaps of ratio type [41,42]. Model (6) keeps the smallest positive delivery but not the steps above it. The whole-step level λv is (6) with {0} ∪ [qj,∞) replaced by the set Sj of the daily volumes that outlet j can deliver; at a constant level, the daily volumes of a gate whose discharge is proportional to the opening and that starts the day closed lie on the grid {0} ∪ {qj + m vj: m = 0,1,…}, which they cover over the range of Appendix A. λq is computed exactly by a breakpoint search of the piecewise-linear function (Lemma A3), and λv on such grids by bisection of the corresponding nondecreasing step function; both are checked in the tests of the code against a mixed-integer program and an enumeration.
Πind = λ* − λq
2.4. Execution Rules
The execution layer turns the daily plan x of an outlet into commands at the N = 96 steps i = 0,…,N − 1 of a day. Let V(i) be the volume delivered before step i, Ri = x − V(i) the part of the plan still owed, , and V = V(N) the daily delivery.
Direct execution. At every step the execution layer requests at most the volume still owed, , and commands the opening acmd = ρ ui/vi; the actuator (3) rounds it and applies the deadband. The direct-execution runs use the lexicographic controller LXB (Section 2.6), whose execution program schedules continuous discharges, does not represent the deadband and keeps the request within the remainder only by a penalty (Section S3.3); the cap was therefore checked at every step of the runs (Section 3.2).
Pulse rule with thresholdθ, 0 ≤ θ ≤ 1. Whenever the requested discharge of a regulator is positive but below that of the pulse opening, it is replaced by one pulse or by a closure:
With θ = 0 the rule rounds up; with θ = 1/2 it is the deadband-aware rule of the simulation core. An outlet is in the pulse regime on a day on which rule (8) decides every one of its steps.
Equal split with pulse fallback. A plan of at least one quantum is delivered in m open steps i1<⋯<im separated by closed steps, il+1 − il ≥ 2; at the open step il the request is the remaining part of the cumulative target,
and all other steps are closed. Smaller plans, and plans too large for this schedule, are executed as under the pulse rule with θ = 1/2 (Section S3.4).
Carry-over. The pulse rule (8) is applied to the plan plus the debt of the previous day,
and the outlet is closed for the day when ; under the other rules, . Figure 1 shows the actuator and the rules on an abstract day.
2.5. Theoretical Results
The results hold under four assumptions: (H1) a closed gate passes no water; (H2) the controller knows the level hi at every step and the volume delivered so far, and the level is constant within a step; (H3) the gate is closed at the start of the day; (H4) every command reaches the actuator. C denotes the smallest volume that the fully open gate, or the outlet at its capacity if that is less, passes in one step of the day. Theorems 1, 3 and 4 concern one outlet, whose index is dropped; Theorem 2 concerns all outlets of the node. Table S3 lists where the closed loop meets and violates the assumptions, and Appendix A gives the proofs.
Theorem 1
(Exclusion and half-step delivery). (a) Under direct execution and (H1)–(H3), if
the outlet receives no water that day: V = 0. (b) Under (H1)–(H4), if C ≥ 2qmax + 3vmax and qmax ≤ x ≤ ⌈N/2⌉(C − vmax), all commands of the equal split with m = ⌈x/(C − vmax)⌉ open steps il = 2(l − 1) are executed, and
Part (a) makes explicit, for gates whose smallest executable opening is k resolution steps, the dead-zone effect known from actuators [46] and from pulse-width modulation with a minimum pulse width, where shorter pulses are dropped [47]. In the terms of apportionment, direct execution rounds to the nearest step with a positive first threshold, under which small entitlements receive nothing [36,37]. Condition (11) is sufficient; above it, whether the gate opens depends on how the request is spread over the day. Part (b) is the half-step error of rounding to the nearest step; its content is that this rounding can be executed by open steps separated by closed ones, each of which clears the deadband. Remark A1 extends (12) to other numbers and positions of the open steps, among them those of the simulation.
Theorem 2
(Price of indivisibility). Let Dj > 0 for every outlet. (a) . If
and λ* < 1,
and Πind = 0 if and only if λ*Dj ≥ qj for every outlet. (b) If λ* = 1, Πind = 0 if and only if . (c) Let every outlet be able to deliver 0 and, for every qj ≤ y ≤ max{Dj,qj}, a volume in [y, y + vj]. Then λv ≥ τ for every 0 < τ ≤ λq with , where Dq(τ) is the demand of the outlets with qj ≤ τDj; if all outlets have qj ≤ τDj at , then
. If, moreover, no outlet can deliver a positive volume below qj, then λv ≤ λq. (d) Under (H1) and (H3), if the outlets together receive at most W and , at least one outlet receives no water that day under any rule.
The bound is attained in the limit of an outlet with a positive quantum and a vanishing demand on a deficit day, and the bound of part (c) in the example of Remark A2. Appendix A shows that every gate whose discharge increases with the opening meets the condition of part (c) at a constant level, with its quantum and the largest volume of one resolution step, if Cj ≥ 2qj and max{Dj,qj} ≤ (N − 3) Cj, and that a gate whose discharge is proportional to the opening meets it with and also for a level that varies within the day, under the conditions of Theorem 1(b) for the plan . Since neither λq nor the bound τ of part (c) increases as the quanta and step volumes grow, τ computed with the largest values of the day bounds the whole-step level from below at every constant level of the day, whereas (6) with bounds from above the level of every execution that delivers at most W. In this static model, the theorem therefore separates two causes of a lost max–min level: a positive Πind with is a property of the day that no execution rule can recover, whereas a loss larger than the gap that (13) and part (c) allow is caused by the execution rule.
Theorem 3
(Pulse rule). Under (H1), (H2) and (H4), let an outlet with x > 0 that starts the day closed (H3) or at the pulse opening be in the pulse regime with threshold 0 ≤ θ ≤ 1, and let x < N pmin, the daily pulse capacity, and pmax ≤ C. Then it receives at least one pulse, and
x − θ min{pmax, x} ≤ V < x + pmax.
Corollary 1.
(a) If x = λ*D, the daily satisfaction r = min{1,V/D} of the outlet satisfies r ≥ λ* − θ min{pmax,x}/D; with θ = 0, V ≥ x and r ≥ λ*. (b) If the outlets outside a set F are operated in this way, , and the outlets of F receive the rest of the day’s water,
, where ΔS is the change of storage of the pool, then
the over-delivery of the outlets in the pulse regime, less than one pulse each, is taken from the outlets of F.
For x ≥ pmax and a constant level, the pulse rule is stationary rounding of the plan in units of a pulse with the split parameter θ [37,48] (θ = 1/2 is the rounding of Webster), and the upper bound improves to V ≤ x + (1 − θ) pmax (Remark A3). The threshold min{pi,x} makes the first rounding threshold zero for plans below one pulse, as in Adams’ method of apportionment [49], which is why no positive plan is excluded.
Theorem 4
(Accounting period). Let the conditions of Theorem 3 hold on every day s = 1,…,T with , with
in place of x and pmax taken over the period, and let the outlet be operated by the carry-over (10). Then on every day
the period delivery is
, and for plans x(s) = λ*(s) D(s) the satisfaction over the period satisfies
where
is the demand-weighted mean of λ* over the period andthe mean daily demand.
−pmax < e(s) ≤ θ pmax
Corollary 2.
(a) Under (H1) and (H3), an outlet whose demand is below one quantum, D < qmin, has a daily satisfaction of either 0 or 1, whatever the rule, so the daily max–min level cannot rate its service. (b) Under the carry-over, the shortfall of the period satisfaction below
is at most
, and below a tolerance ζ once
. (c) The over-delivery over the period is less than one pulse.
The carry-over is first-order sigma–delta modulation, or error feedback [38,39], with the pulse rule as its quantiser: the bounded state (15) and the telescoping sum give a relative error that decays as 1/T for a mean daily demand bounded away from zero, as for first-order sigma–delta modulators [50]. In canal control, the volume that the minimum gate movement left undelivered has been carried to the next regulation interval in approximate schedules of check gates, without a bound on the carried volume [26]. The bounds concern the volumes that the controller computes; a bias of the gate relation or of the level passes to the delivered volumes in full (Remark A4). When several small outlets share one pulse of equal volume per step, the coupled problem is the chairman assignment problem [51], whose cumulative deviation can always be kept within one pulse; it is not used here.
2.6. Closed-Loop Simulation
The closed loop tests the theorems in a hydraulic plant in which the level moves within and between steps and depends on every gate.
Plant. The reach is a one-dimensional nonlinear Saint–Venant model of a prismatic trapezoidal channel with a distributed loss (1 − η) of the head inflow, discretised by the implicit four-point Preissmann scheme [52] on a 200 m grid with a 15 min step (Section S2). At the node, the outflow of the reach equals the sum of the six outlet discharges (2) at the node level. The node level is held near the normal level of 3.00 m, between the minimum depth of the passport, 2.40 m, and the relief level of 3.43 m, below which the controller keeps a freeboard of 0.20 m; the upper operating level is thus 3.23 m.
Controller. At the start of each day, the planner LXB computes the daily volumes xj over a ten-day window by a lexicographic program adapted from [10] to one node, using the recorded supply of the day and a dekadal forecast for later days. With one supply constraint per day and no binding capacity, the plan is xj≈λ*Dj, with λ* from (5) and xj/Dj − λ* between −10−6 and 0.0015 (Section S3.1). At every step, a linear execution program over the rest of the day, with an integrator-delay model of the pool [12,53], turns the remaining plans into outlet discharges; only its first command is executed (Section S3). The execution rules of Section 2.4 act on these commands for the five regulators; the barrier command is never changed. All gates are positioned by the quantised actuator. The controller reconstructs the delivered volumes from the level, the gate positions and relation (2); all reported deliveries Vj are the volumes of the plant.
Execution chains. Three chains are compared: ideal execution (phys), in which commands are executed exactly; the quantised actuator alone (Q), with exact levels and no communication or energy constraint, which isolates the resolution and the deadband (Table S3); and the full device chain (IoT), which adds a level sensor with an error of ±0.025 m, a LoRaWAN link with a packet budget and packet losses, and the energy balance of a solar-powered node (Section S4).
Cases. Ten cases were run for the ten seasons (Table 2): 200 seasonal runs, each with one fixed random seed.
Checks. Each theorem is compared with the plant. Theorem 1(a): the regulator-days with , with at the lowest level of the day, against the days on which the gate never opened, and the requests at every step, in re-runs of the seven direct-execution cases with quantised gates that reproduce the stored volumes. Theorem 1(b): the error of the equal split against . Theorem 2, from the recorded supply at constant levels of the operating range in steps of 1 cm: λ*, λq and Πind of the node with the quanta of the upper operating level, the bound of part (c) for the six outlets, and , λv with the barrier modelled by the grid of its quantum and the largest volume of one resolution step. Theorem 3: water on every regulator-day with , and the bounds (14) on the regulator-days operated by pulses only, an empirical sample defined by , at least one pulse, no equal-split step and as many open steps as pulses, including days on which the execution program, not rule (8), closed the gate at some steps. Theorem 4: the debt (15) reconstructed from the plans and the estimated deliveries, and the period error over the calendar dekads (days 1–10, 11–20 and 21 to the end of a month) and over blocks of T consecutive days from 1 April.
Outcome. The outcome of each rule is described by the daily worst-user satisfaction λ(s) = minjrj(s) over the six outlets, the days with λ(s) = 0, the shortfall and over-delivery of the regulators, their seasonal delivery ratio , the balance of the barrier, and the number of gate movements, counted in a deterministic re-run of the quantised-actuator case that reproduces the stored volumes; it is also given with the blank days of the record, and the day after each run of them, excluded from the evaluation.
Reproducibility. The simulation core (version 1.4.0) is used unchanged; the execution rules are added to it as controllers. Every result is stored with the checksums of the code, the configuration and the input files and with the software environment (Python 3.13, NumPy 2.3, SciPy 1.17, HiGHS 1.8), and the theory is checked independently of the simulation by randomised tests of Theorems 1–4 on the abstract actuator (about 29,000 instances). The expected outcomes of the execution rules, of the device chain and of the robustness cases other than the rating errors were recorded before these results were examined (Section S5). A generative AI tool (Acknowledgments) assisted in writing the code and running the simulations to the authors’ specification of the models, rules and analyses; the code was checked by the tests above, and the results against the theorems.
3. Results
3.1. Step Volumes and the Loss of the Plan
Across the operating range of 2.40–3.23 m, the quantum of R-1 lies between 37.3 and 45.1 m3. The smallest daily demand of R-1, 21.7 m3 in 1–10 April, is 0.58 of its quantum at the lowest operating level; the smallest daily demands of the other regulators are 3.1 (Khalkabad-2) to 16.0 (Kanly-Yab) quanta. The full-capacity conditions of Theorem 1(b) hold for all five regulators.
With the quanta of the upper operating level, that of the barrier included, the price of indivisibility of the node was zero on all 1830 days of the ten seasons, and therefore at every level of the range. On the 560 deficit days with supply, the max–min share λ*Dj of every outlet was at least its quantum, the zero-price condition of Theorem 2(a), although λ* fell to 0.018. The demand of R-1 was below its quantum on 100 days, all in early April: on 77 of them the node had no deficit and enough water to give every outlet max{Dj,qj}, the condition of Theorem 2(b), and the other 23 are blank in the record.
All six outlets meet the condition of Theorem 2(c) at every constant level of the range, and the regulators also for a level that varies within the day, which is not shown for the barrier (Table S3). On every day without deficit, the supply exceeded the demands, raised to the quanta, by more than one step of every gate, so that every outlet could receive its demand and λv = 1. On the deficit days, part (c) limits the loss of the whole steps, λ* − λv, to at most 9.6 × 10−4 (Table 3); in the grid model of the barrier (Section 2.6), was at most 9.2 × 10−4, and 2.4 × 10−4 for a barrier that could pass any volume. In this static allocation at constant levels, the quanta and the steps of the gates thus lowered the max–min level by less than 0.001 in absolute terms on any day, and by at most 7.9 × 10−5 on average over the 1830 days, by part (c). In the closed loop, the rules lowered the mean daily worst-user satisfaction below that of ideal execution by 0.0006 to 0.044 (Table 4), and the pulse rule with θ = 0 removed 98.6% of this loss of direct execution on the same plant, gates and plan.
3.2. Exclusion Under Direct Execution
Under direct execution with the quantised actuator, Theorem 1(a) predicted 77 regulator-days of exclusion, and on exactly these 77 days the gate never opened and the regulator received no water (Table 3, Figure 2a). All of them are days of R-1 in 1–10 April with a positive plan, 0.50–0.51 of the quantum at the lowest level of the day, in nine of the ten seasons. R-1 would also be excluded on the 23 blank days of this dekad, all of 2019 among them, if they were days with supply, since its demand is 0.58 of the quantum even at the lowest level. On every other regulator-day with a positive plan, the gate opened; the smallest of these plans was 1.24 quanta, so no plan of the baseline lies near the threshold 1 − 1/(2k) = 0.9.
In the re-runs of the seven direct-execution cases, 31 of 5,841,079 positive requests exceeded the remainder, by at most 72 m3, on 18 regulator-days with a zero plan and, with the deadband of 1%, on 8 with a plan above the threshold, whereas on the predicted days every request stayed within the remainder and below the k − 1/2 resolution steps that open the gate (Table 3). The exclusions raised the days with a worst-user satisfaction of zero from the 89 days without supply, under ideal execution, to 166, and lowered the mean daily worst-user satisfaction from 0.812 to 0.768 (Table 4), whereas the seasonal delivery ratio of R-1 hardly changed (0.847 against 0.845), because the excluded volume is small and the deadband makes the gate deliver slightly more than planned on other days.
3.3. Pulse Rule
With the pulse rule, every positive plan was served (Table 3): for all four thresholds, the days with λ = 0 fell back to the 89 days without supply (Table 4). Regulators were operated by pulses only on 2784 regulator-days (2786 with θ = 0.75), 1741 of them at R-1, and on every one of them both bounds (14) of Theorem 3 held, for the volumes of the plant and for those estimated by the controller (Table 3). The threshold traded shortfall for over-delivery monotonically (Figure 3, Table 3). In the daily worst-user satisfaction, the rounding up of θ = 0 came closest to ideal execution (0.811 against 0.812), and larger thresholds lowered it to 0.797 at θ = 0.75; in volume, the shortfall and the over-delivery of the regulators were each below 0.04% of the planned volume under every rule. The sharper bound of Remark A3 held on all but at most two of these days per threshold; on each of these days the gate entered the day open, after a day on which it had been open throughout (assumption (H3)).
With θ = 0, the five regulators together received at most 996 m3 a day more than their plans (14 September 2016, when Abad-Yarmish was executed directly at most of its 93 open steps); on the deficit days this surplus was at most 0.17% of the demand of the barrier. Corollary 1(b) bounds only the surplus of the regulators in the pulse regime, by one pulse each. On these days the satisfaction of the barrier differed from its plan by −0.014 to +0.050 under every rule and by −0.013 to +0.052 under ideal execution: its daily balance was set by the storage of the pool, not by the rules (Table S6f).
3.4. Equal Split with Pulse Fallback
The rule served 2719 regulator-days by the equal split, 1664 of them at R-1, and the 77 early-April days of R-1, whose plans are below one quantum, by its fallback, the pulse rule with θ = 0.5; the 77 exclusions were therefore removed by the fallback, not by the equal split (Table 4). On 2717 of the equal-split regulator-days, , as Theorem 1(b) states; on the other two, both at R-1, the error exceeded the bound by 0.3% and 0.5%, an excess of the order of the change of the level within one step, which the theorem neglects (H2). On the same regulator-days, the pulse rule with θ = 0.5 deviated from the plan by 30.3 m3 on average and the equal split by 4.2 m3 (Figure 4). In the simulated schedule (Section S3.4), the equal split opens and closes the gate at each of its open steps and so moved the gate 62 times a day at R-1 on average, against 2.0 under the pulse rule with θ = 0.5 and 1.9 under direct execution (Table 4).
3.5. Carry-Over and Accounting Periods
On the 2764 regulator-days that the carry-over operated by pulses only, the debt stayed within (−pmax, 0.5 pmax] on 2763, between −0.90 and +0.49 pulses at R-1 (Table 3). On the remaining day (Abad-Yarmish, 25 April 2014), the gate entered the day open at ten resolution steps, a change of four steps from the pulse opening and so within the deadband: the pulse commands were not executed, the gate stayed at the larger opening, and the debt reached −1.02 pulses. The day violates assumption (H3).
Over the 180 calendar dekads of the ten seasons, the error of R-1 was 0.010 on average under the carry-over (median 0.0007, largest 0.20) and 0.065 under the pulse rule with θ = 0.5 (median 0.0035, largest 1.40), mostly from 1–10 April (0.0013 and 0.0057 without them); weighted by demand, 0.0008 and 0.0043 (Section S6); for blocks of thirty days (Figure 5b), 0.00036 and 0.0043 on average; over the season, 0.00004 and 0.0013. Every block of R-1 under the carry-over stayed within , the bound that follows from (15) for a block that does not start with the season, which is 0.36–0.37 for the dekad of 1–10 April. The price is paid in the daily indicator: because the early-April demand of R-1 is below one quantum, the carry-over delivers a pulse about every second day (Figure 5a), the days with λ = 0 rose to 126, and the mean daily worst-user satisfaction fell to 0.784 (Table 4), although the volume delivered to R-1 over the season matched its plan within 1.1 × 10−4 of its demand.
3.6. Device Chain and Robustness
Device chain. In the simulated realisations of the device chain, the outcome of the rules hardly changed (Table S6a–S6c). Direct execution excluded R-1 on the same 77 predicted days and on no others; the pulse rules and the equal split brought the days with λ = 0 back to 89, and the carry-over to 127; and over calendar dekads the carry-over again had the smallest error of R-1, 0.010 of its demand against 0.066 under the pulse rule with θ = 0.5.
The device chain affected the theorems in two ways. First, the controller knows the delivered volumes only through the estimated level: on the regulator-days operated by pulses only, its estimate differed from the plant by 1.4% of a pulse on average and by at most 10.3%. The bounds (14) held for the estimated volumes on all these days except one under θ = 0 and one under the carry-over, on which the gate entered the day at an opening within the deadband of the pulse opening (as in Section 3.5), whereas for the plant volumes they failed on 35 of 2666 regulator-days with θ = 0, on 12 of 2663 with θ = 0.5 and on 8 of 2655 under the carry-over, by at most 4.8% of a pulse except on the carry-over day that began within the deadband (0.42 of a pulse). Second, command packets were lost, which violates (H4): on 117–125 regulator-days under each of the pulse rules and the carry-over, about 4% of the regulator-days with pulses, the open steps differed from the pulses by one or two (on 5–8 regulator-days without packet losses), a difference that indicates, but does not identify, lost pulses and closures, with daily errors from −0.47 to +1.97 pulses.
The equal split, whose bound is the tightest, was the rule most affected: on 170 of its 2725 regulator-days the error of the estimated volume exceeded half a resolution step, with a median error of 0.95 of the volume of one open step, because later open steps can make up a lost command only within the rest of the plan (Remark A4); its mean error, 9.4 m3, nevertheless remained well below that of the pulse rule with θ = 0.5 on the same days, 32.0 m3.
Robustness. In every robustness case, the gate stayed closed on every day that Theorem 1(a) predicted (Table 3 and S6d). With a gate coefficient 20% lower or higher, the quanta change in proportion, the early-April plan of R-1 lies at 0.62–0.64 or 0.41–0.43 of its quantum, and the 77 predicted days were again the only exclusions. With a deadband of 0.25% (k = 3), the early-April plan of R-1 lies at 0.83–0.85 of its quantum, on both sides of the threshold 1 − 1/(2k) = 0.833 (Figure 2b): the gate never opened on the 24 days below the threshold, and also on 42 of the 53 days above it, with x/qmin up to 0.852, on which the theorem makes no prediction (Section 2.5). With a deadband of 1% (k = 10), the quantum doubles and the threshold rises to 0.95: R-1 was excluded on 83 days, all predicted, six of them deficit days of June 2014 on which its plan of 54 m3 was 0.62–0.63 of the larger quantum (Figure 2c).
With leaking regulators, which violate (H1), the gate of R-1 again never opened on the 77 predicted days, but R-1 received 27.5–28.1 m3 through the closed gate on each of them, more than its plan (Remark A4). With rating errors of the regulators that the controller does not know (they pass 0.90–1.10 of the discharge of relation (2), R-1 0.90), the estimated volumes behaved as in the baseline: under the carry-over, the bounds (14) and the debt (15) held for them on all 2765 regulator-days operated by pulses only, and the estimated dekad error of R-1 was 0.010. The plant, however, delivered to R-1 0.900 of its plan over the seasons: its seasonal delivery ratio was 0.761 against an estimated 0.845, and its dekad error 0.081 (Table S6e). The carry-over corrects only what the controller measures (Remark A4).
Records. With the 87 blank days, simulated as days without supply, and the day after each run of them excluded from the evaluation, the mean daily worst-user satisfaction of every rule rose by 0.040–0.042, the differences between the rules changed by at most 0.0014, the days with λ = 0 fell to the two recorded zeros under ideal execution, the pulse rules and the equal split, to 77 under direct execution (the two zeros and 75 exclusions) and to 40 under the carry-over, and the dekad errors of R-1 changed by at most 0.0007 (Table S6g). Other fillings of the blank days, which would change the pool storage and the carried debt, were not simulated.
4. Discussion
4.1. Planning Losses and Execution Losses
At the Dustlik node, the loss of the max–min level that the gates impose on the static allocation at constant levels was negligible: the price of indivisibility was zero, and the whole steps lowered the level by less than 0.001, because the outlets served above their quanta, above all the barrier, have demands that are large against the summed step volumes. This bound does not cover the closed loop, where the comparison on the same plant and plan shows that another rule recovers most of the loss of direct execution (Section 3.1). At a node whose outlets are all small, the bound of Theorem 2(c) can be large, and λv, computed on the grids of the gates, shows how much of the max–min level the steps cost.
4.2. Specifying Gates for Small Users
Theorem 1(a) turns the exclusion of a small user into a specification. Direct execution serves an outlet only if its smallest positive daily plan is at least (1 − 1/(2k)) qmin, and the quantum q = k v grows with the deadband (through k), the control step Δt, the gate width and the head on the gate (Equation (4)). For R-1, the early-April plan is half its quantum at the normal level; halving the control step would halve the quantum, and a deadband of 0.25% (k = 3) would reduce it to 0.6 of its baseline value, which puts the plan almost exactly on the threshold (Section 3.6). What the gate adds to the classical rounding devices of Section 2.5 is this dead zone, which makes the smallest executable amount larger than the step of the grid (q = k v), and the coupling of all outlets through the node level, which makes every step volume a function of the state of the canal; the theorems handle the first exactly and the second through bounds over the day.
4.3. Choosing an Execution Rule
Under the assumptions of the theorems, direct execution is the only rule that can exclude a user without later compensation. In the pulse regime, the pulse rule with θ = 0 never delivers less than the plan to a regulator (Corollary 1(a)); its surplus, less than one pulse per regulator, is taken from the other outlets, here mainly the barrier, or from the storage of the pool (Corollary 1(b)). The equal split is the most accurate rule for plans of at least one quantum, with an error of half a resolution step instead of up to one pulse, but it cannot serve smaller plans, which its fallback serves by pulses, and it needs a closed step between open steps, which limits it to plans of at most ⌈N/2⌉ full-capacity steps. It also opens and closes the gate at every open step (Section 3.4), and so works against the purpose of the deadband, which is to limit the movements of the drive; the smallest admissible number of open steps (Remark A1) keeps the bound with fewer movements, untested in the closed loop. A lost command can cost it the volume of one open step (Section 3.6).
4.4. Accounting Periods
If water rights are accounted daily, a user whose demand is below one quantum is either fully served or not served on a day (Corollary 2(a)), and the daily max–min level of such a user measures the rule rather than the service. The plan of the Kegeyli system is set per dekad (Section 2.1); over calendar dekads, the carry-over kept the unweighted mean error of R-1 at about 1% of its demand, against 6.5% for the pulse rule (Section 3.5). The carry-over equalises volumes, not timing: in all runs, a day without water for a positive plan under the carry-over was one whose share had been delivered in advance (), not an exclusion, and whether such shifts in timing are acceptable depends on the crop, the soil and the use of the water, which the volume accounting does not represent. For small users the choice between the daily max–min level and an accounting period is therefore a choice between a daily share that the gate cannot deliver and a dekadal volume that it can, which rotational delivery provides informally when farmers with short turns pass them to neighbours and are compensated later [54].
4.5. Limitations
The study concerns one node of one canal, with demands derived from a plan rather than measured; the early-April demand of R-1, on which all baseline exclusions occurred, is a reference value that the records do not confirm (Section 2.1), so the case study tests the theorems under this demand rather than documenting exclusions that occurred, and their number depends on reading the blank records of early April as days without supply (Section 3.2). The gate relation is applied down to openings of millimetres, where it is least reliable [27], with assumed gate coefficients and tail-water levels, and the actuator parameters are assumed (Section 2.2); the robustness cases change the coefficients by ±20% and the deadband by a factor of two either way. The theorems treat one outlet at a time (Theorems 1, 3 and 4) or the node through the step volumes of its gates (Theorem 2, for the barrier only at a constant level), under assumptions that the closed loop does not always meet (Table S3): the level varies within a step (H2), the rules do not ensure that a gate starts the day closed (H3), the device chain loses commands (H4), and direct execution keeps its requests within the plan only by a penalty, which it exceeded on a few days outside the scope of Theorem 1(a). The wear of the drives is represented only by the number of gate movements.
5. Conclusions
For max–min delivery at a canal node, it was proved, for gates that seal and start the day closed, with exact levels and executed commands, that direct execution excludes a user whose plan is below 1 − 1/(2k) of a quantum, that the quanta and the steps above them cost the max–min level at most the summed quanta and, conditionally, the summed step volumes over the demands concerned, that a pulse rule serves every positive plan below the daily pulse capacity within −θ to +1 pulse, and that carrying the daily debt forward bounds the cumulative error by one pulse, shifting deliveries between days.
For the recorded supply of ten growing seasons at the Dustlik node of the Kegeyli canal, the quanta and steps of all six outlets lowered the max–min level of a static allocation at constant levels by less than 0.001. In closed-loop Saint–Venant simulation with plan-derived demands, direct execution excluded the smallest regulator on exactly the 77 days that the condition predicted; the pulse rules and the equal split with pulse fallback served every positive plan, within the bounds of Theorems 3 and 1(b) on all but two of the regulator-days checked; and the carry-over reduced the unweighted mean absolute error of that regulator over calendar dekads from 6.5% under the pulse rule to 1.0% of its demand, at the cost of serving it about every second day in early April. The equal split was the most accurate rule for daily plans of at least one quantum but, as implemented, moved the gates far more often than the others. The ranking of the rules was the same in simulated realisations of field devices, although lost commands and the estimated level occasionally pushed daily deliveries outside the bounds, and with the blank days excluded from the evaluation; in the robustness cases, the gate never opened on a predicted day, although leaking gates still passed water, and the condition missed only plans within 2.2% above its threshold; and a bias of the gate relation unknown to the controller passed to the delivered volumes in full.
Five recommendations follow for canal automation. The smallest planned delivery of every gate should be checked against (1 − 1/(2k)) of its quantum when actuators, deadbands and control steps are specified; fair plans should not be executed directly at outlets whose plans can fall below one quantum; a pulse rule should start every day from the closed position or the pulse opening, which closing the gate before midnight, not simulated here, would ensure; for users whose demand is below one quantum, fairness should be accounted over a period such as a dekad, with the daily debt carried forward and the admissible shift in timing agreed with the users; and where command packets can be lost, the last commands of a day should be confirmed by the reported gate positions, because an error made there cannot be made up within the day. Extensions to outlets that share one pulse per step, to networks of nodes and to field data on small gate openings and small demands are left to future work.
Supplementary Materials
The following supporting information can be downloaded at the website of this paper posted on Preprints.org., Section S1 and Table S1a–S1c: Data, derived inputs and parameters; Section S2 and Table S2a–S2c: Hydraulic plant and its verification; Section S3 and Table S3: Daily plan, execution program and assumptions of the theorems; Section S4 and Table S4: Device chain; Section S5 and Table S5: Expected outcomes recorded before the analysis; Section S6 and Table S6a–S6g: Results by rule, case and season; Section S7 and Table S7: Literature search. References [55,56] are cited in the Supplementary Materials.
Author Contributions
Conceptualization, A.K. (Adilbay Kudaybergenov) and A.K. (Anvar Kabulov); methodology, A.K. (Adilbay Kudaybergenov) and A.K. (Anvar Kabulov); software, A.K. (Adilbay Kudaybergenov); validation, M.K., E.U., J.I., and D.B.; formal analysis, A.K. (Adilbay Kudaybergenov) and A.K. (Anvar Kabulov); investigation, M.K., G.A., E.U., J.I., and D.B.; resources, G.A., J.I., and R.S.; data curation, A.K. (Adilbay Kudaybergenov), M.K., and J.I.; writing—original draft preparation, A.K. (Adilbay Kudaybergenov); writing—review and editing, all authors; visualization, A.K. (Adilbay Kudaybergenov); supervision, A.K. (Anvar Kabulov); project administration, A.K. (Adilbay Kudaybergenov). All authors have read and agreed to the published version of the manuscript.
Funding
This research received no external funding. The APC was funded by the authors.
Institutional Review Board Statement
Not applicable.
Informed Consent Statement
Not applicable.
Data Availability Statement
The code, including the scripts that produce every table and figure (MIT License), and the configuration with the status and source of every parameter, the processed operating records of the Kegeyli irrigation system and the daily results of all runs with their provenance files (CC BY 4.0) are openly available in Zenodo at https://doi.org/10.5281/zenodo.23728409 (version 2.3.0, which this article uses) and at https://github.com/Adilbaygh/water01-maxmin-quantised-gates, tagged version v2.3.0 (commit 8ce2690); the repository describes how to rebuild the tables and figures from the stored results and how to repeat the simulations. The hourly irradiance data are openly available from NASA POWER (https://power.larc.nasa.gov) and are included in the repository.
Acknowledgments
Some of the devices considered in this study were procured under applied research project AL-9424104879 of the Agency for Innovative Development under the Ministry of Higher Education, Science and Innovation of the Republic of Uzbekistan; the project did not fund the research reported here. The research idea, the canal and operating data, and the modelling and analysis decisions are the authors’. During the preparation of this study, the authors used Claude (Anthropic; Claude Opus models, 2026) to implement the simulation and analysis code, to run the reported simulations in a cloud computing environment, to search the literature and check the bibliographic records of the cited works, and to assist in drafting and language editing. The authors examined the code and the outputs, reviewed and edited the text, and take full responsibility for the content of this publication. All figures were plotted by code from the simulation outputs; no image-generation tool was used.
Conflicts of Interest
The authors declare no conflicts of interest.
Abbreviations
The following abbreviations are used in this manuscript:
| CO | Carry-over (execution rule) |
| ES | Equal split with pulse fallback (execution rule) |
| HiGHS | High-performance linear optimisation solver |
| IoT | Internet of Things |
| LoRaWAN | Long Range Wide Area Network |
| LXB | Lexicographic receding-horizon controller with direct execution |
| LXB-Tθ | LXB with the pulse rule of threshold θ |
| PK | Picket, a 100 m chainage mark |
Appendix A
This appendix proves the results of Section 2.5; the notation is that of Section 2. At step i the level is hi, and vi = v(hi), qi = q(hi) = k vi, pi = p(hi) = (k + 1) vi. C ≤ nmaxvi for every step i of the day. A request of volume u at step i is the command ncmd = nint(u/vi); by (H2), an executed opening of n steps delivers n vi.
Lemma A1
(One step). Let the gate be closed before step i, and let the controller request u ≥ 0. (a) If u < (k − 1/2)vi, the gate stays closed and the step delivers no water. (b) If qi ≤ u ≤ C and the command reaches the actuator, it is executed, k ≤ ncmd ≤ nmax, and the delivered volume u' satisfies |u' − u| ≤ vi/2.
Proof.
(a) u/vi < k − 1/2 gives ncmd ≤ k − 1. If ncmd = 0, the gate is closed; if 1 ≤ ncmd ≤ k − 1, the change from the closed position is smaller than k steps and is not executed (3). In both cases no water passes, by (H1). (b) u ≥ qi = k vi gives ncmd ≥ k, and u ≤ C ≤ nmaxvi gives ncmd ≤ nmax. The change from the closed position is at least k steps, so the command is executed, and |u' − u| = vi|nint(u/vi) − u/vi| ≤ vi/2. □
Lemma A2
(Daily volume). Under (H1) and (H3), every rule gives V ∈ {0} ∪ [qmin,∞).
Proof.
Let V > 0. An open gate passes a positive volume at every step and a closed gate passes none, so the first step that delivers water is the first step at which the gate is open, and the gate was closed before it, by (H3). From the closed position a command is executed only if n ≥ k, so that step delivers at least k vmin = qmin, because the level stays at or above hmin. Volumes are nonnegative, hence V ≥ qmin. □
Proof of Theorem 1.
(a) By induction, the gate is closed and V(i) = 0 before every step i. This holds for i = 0 by (H3). If it holds before step i, then and
so by Lemma A1(a) the gate stays closed and V(i + 1) = 0. Hence V = V(N) = 0.
(b) The schedule fits into the day: x ≤ ⌈N/2⌉(C − vmax) gives m ≤ ⌈N/2⌉, so the last open step im = 2(m − 1) ≤ N − 1. The gate is closed at the start of the day (H3) and between open steps (a closure is always executed), so it is closed before every open step. By induction over l = 1,…,m: the command of the l-th open step is executed and |V(il + 1) − l x/m| ≤ vmax/2. With V(i0 + 1):=0 the statement holds for l = 0. Let it hold for l − 1. No water passes between open steps, so V(il) = V(il−1 + 1), and
It suffices to show and apply Lemma A1(b), whose command reaches the actuator by (H4). If m = 1, then d1 = x, , and x ≤ C − vmax < C. If m ≥ 2, then x > C − vmax, and m < x/(C − vmax) + 1 gives
because y ↦ y/(y + A) increases for y > 0 and equals 1/2 at y = A. With C ≥ 2qmax + 3vmax,
On the other hand m ≥ x/(C − vmax), so x/m ≤ C − vmax and dl ≤ C − vmax/2 < C. In both cases Lemma A1(b) applies: the command is executed and the delivered volume dl' satisfies |dl' − dl| ≤ vmax/2, so V(il + 1) − l x/m = dl' − dl ∈ [−vmax/2, vmax/2]. For l = m, since no water passes after the last open step, |V − x| ≤ vmax/2. □
Remark A1
(Choice of m). The proof uses only [x/m − vmax/2, x/m + vmax/2] ⊂ [qmax, C] (for m = 1, qmax ≤ x ≤ C suffices, because d1 = x exactly) and a closed step between open steps. The bound (12) therefore holds for every m with x/(C − vmax/2) ≤ m ≤ x/(qmax + vmax/2) and 1 ≤ m ≤ ⌈N/2⌉, and for any open steps separated by closed ones. The simulation uses m = min{⌈N/2⌉, max{1, ⌊x/(qhi + vhi)⌋}}, with the step volumes qhi ≥ qmax and vhi ≥ vmax of the upper operating level, and the open steps il = ⌊(l − 1)N/m⌋, which belong to this family when x/m + vmax/2 ≤ C.
Lemma A3
Let Dj > 0 for every outlet and . (a) A level t > 0 is feasible in (6) if and only if G(t) ≤ W. (b) G is continuous, nondecreasing and piecewise linear, with breakpoints qj/Dj, , and G(t') − G(t) ≥ (t' − t)Dq(t) for t' ≥ t ≥ 0, where Dq(t) is the demand of the outlets with qj ≤ tDj. (c) If , then λq = max{t ∈ [0,1]: G(t) ≤ W}.
Proof.
(a) For t > 0, Vj ≥ tDj > 0, so Vj ≠ 0 and Vj ≥ qj, i.e., Vj ≥ max{tDj,qj}; a feasible solution therefore implies . Conversely, if G(t) ≤ W, then Vj = max{tDj,qj} is feasible. (b) Every term has the first properties; a term with qj ≤ tDj equals sDj for every s ≥ t, and the others do not decrease. (c) t = 0 is always feasible (Vj = 0). By (b), {t ∈ (0,1]: G(t) ≤ W} is an interval or empty, and G(0) ≤ W adds t = 0 to the same condition. □
Proof of Theorem 2.
(a) On a deficit day . For t > λ*, , so λq ≤ λ*. For t = λ* − ε, 0 ≤ ε ≤ λ*, the identity max{tDj,qj} = tDj + max{0,qj − tDj} gives
By Lemma A3(b), Φ is nonincreasing, so {ε ∈ [0,λ*]: Φ(ε) ≤ 0} = [ε*,λ*], and by Lemma A3(c) λq = λ* − ε*. For ε > λ* every term qj − (λ* − ε)Dj is positive and the condition reduces to , which holds by assumption; the minimum over ε ≥ 0 is therefore also ε*, and Πind = ε*.
Upper bound. Let . If , then ; this covers every day with , because then or . On a day without deficit with , gives , so λq ≥ t and . On a deficit day with , and
so and .
Zero price. Πind = 0 is equivalent to Φ(0) ≤ 0, i.e., . A sum of nonnegative terms is not positive only if every term is zero, i.e., λ*Dj ≥ qj for every j.
(b) For λ* = 1, Πind = 0 is equivalent to λq = 1 and, by Lemma A3(a), to .
(c) Let 0 < τ ≤ λq with ; then G(λq) ≤ W by Lemma A3(a) and G(τ) ≤ G(λq) − (λq − τ)Dq(τ) by Lemma A3(b). Since qj ≤ yj = max{τDj,qj} ≤ max{Dj,qj}, every outlet can deliver a volume Vj ∈ [yj, yj + vj]. Then
and every outlet receives at least τDj, so λv ≥ τ. If qj ≤ τDj for every outlet at , then and the condition holds with equality; if this τ is not positive, holds trivially. If no outlet can deliver a positive volume below qj, every delivery admitted in λv is feasible in (6), so λv ≤ λq.
Gates that meet the condition of (c). Let the level be constant, and let one step at the openings from k resolution steps up to the largest admissible opening pass volumes that increase from q to C ≥ 2q in increments of at most v. A day that opens the gate fully for m consecutive steps, closes it, and opens it from the closed position at one step, or at two steps separated by a closed one, executes all its commands, by (3), and delivers mC plus the volumes of these one or two steps. The volumes of one or two such steps meet every interval [y, y + v] with q ≤ y ≤ 2C, because 2q ≤ C + v, and their shifts by C overlap, because q ≤ C; with m ≤ N − 5, which leaves the first step for closing a gate that starts the day open, the gate therefore delivers a volume in [y, y + v] for every q ≤ y ≤ (N − 3) C. For a gate whose discharge is proportional to the opening and that starts the day closed, the daily volumes lie on the grid {0} ∪ {q + m v} (Lemma A2), and the construction reaches every point of it up to (N − 3) C, since one or two steps pass every multiple of v from q to 2C.
If the level varies within the day, a gate whose discharge is proportional to the opening and that starts the day closed delivers a volume in [y, y + vmax] for every y ≥ qmax: by the request y + vmax/2 at one open step if y + vmax/2 ≤ C, by Lemma A1(b), and otherwise by the equal split of Theorem 1(b) with the plan y + vmax/2, which needs C ≥ 2qmax + 3vmax and y + vmax/2 ≤ ⌈N/2⌉(C − vmax). If every outlet meets these conditions for , the condition of (c), and so its lower bound, holds with and also for a varying level.
(d) If every outlet received water, Lemma A2 would give and , contrary to the daily balance. □
Remark A2
(The bounds are tight). Let one outlet have a quantum q1 > 0 and a vanishing demand D1 → 0, the others qj = 0, and let . Then ; for D = (10−6, 100), q = (10, 0) and W = 50, both equal 0.1 to within 10−8. The steps above the quantum cannot be neglected: let D = (6,6), W = 11, the first outlet deliver {0,5,6,…} (q1 = 5, v1 = 1) and the second any volume (q2 = v2 = 0). Then λq = 11/12, whereas the best whole-step deliveries, (5,6) or (6,5), give λv = 5/6, which equals the bound of part (c), τ = 11/12 − 1/12, since both outlets have qj ≤ τDj.
Proof of Theorem 3.
Let the gate start the day closed (H3); a pulse command ncmd = k + 1 ≤ nmax, since pi ≤ C ≤ nmaxvi, reaches the actuator (H4), is executed from the closed position, |k + 1 − 0| ≥ k, and leaves the pulse position unchanged. A pulse step therefore delivers pi, and a closed step delivers nothing (H1). The debt never increases. A gate that starts the day at the pulse opening behaves in the same way.
At least one pulse. At i = 0, R0 = x > 0 and θ min{p0,x} ≤ x = R0, so a pulse is given.
Upper bound. Let i* be the last pulse step. By (8) , so .
Lower bound. RN = x − V is the debt at the end of the day. If the day has no closure decision, every step is a pulse and , i.e., RN < 0. Otherwise let i' be the last closure decision. At that step Ri' ≤ 0 or Ri' < θ min{pi',x} ≤ θ min{pmax,x}. Every later step is a pulse and the debt only decreases, so RN ≤ Ri' ≤ θ min{pmax,x}. In both cases V = x − RN ≥ x − θ min{pmax,x}. □
Proof of Corollary 1.
(a) With x = λ*D, (14) gives V/D ≥ λ* − θ min{pmax,x}/D. This bound is at most λ* ≤ 1, so r = min{1,V/D} is not below it. For θ = 0, (14) gives V ≥ x. (b) By (14), for j ∉ F, so
and . □
Remark A3
(Plans of at least one pulse). If x ≥ pmax, the pulse condition at the last pulse step i* gives , so
If the level falls after a closure decision, the threshold θ min{pi,x} decreases and the rule may give a further pulse; this only reduces the debt and does not affect the lower bound.
Proof of Theorem 4.
The bounds (15) are proved by induction over s; e(0) = 0 satisfies them. Let −pmax < e(s − 1) ≤ θ pmax. If , Theorem 3 gives
hence
If , then V(s) = 0 and , while x(s) ≥ 0 and the induction hypothesis give e(s) = x(s) + e(s − 1) > −pmax.
Period delivery. Summing over s = 1,…,T gives the telescoping sum
By (15),
With x(s) = λ*(s) D(s), , so ; since , the bound also holds for rT. □
Proof of Corollary 2.
(a) By Lemma A2, V ∈ {0} ∪ [qmin,∞), so V/D ∈ {0} ∪ (1,∞) when D < qmin, and r = min{1,V/D} ∈ {0,1}. (b) follows from (16). (c) follows from (A7) and e(T) > −pmax. □
Remark A4
(When the assumptions fail). If a closed gate leaks a volume 𝓁 ≥ 0 per day, (H1) fails, Lemma A2 becomes V ≥ 𝓁, and an excluded outlet still receives 𝓁, at least its plan when 𝓁 ≥ x (Section 3.6). If the controller computes a volume that differs from the delivered V, because the gate relation is biased or the level is measured with an error, Theorems 1, 3 and 4 hold for with the step volumes known to the controller, and the carry-over keeps the estimated debt within (15). With , (A7) becomes
so the estimation errors accumulate; for a proportional bias,, the error is, which grows with the period and is not seen by the carry-over. If a command is lost and the gate keeps its position (H4), a pulse that was not executed is commanded again at the next step, so the lower bound of (14) holds as long as the remaining steps suffice, whereas a lost closure keeps the gate open for one more step and adds the volume of one more open step to the delivery; under the equal split, the later open steps make up such an error only as far as the rest of the plan and their capacity allow.
References
- Micklin, P. The Aral Sea Disaster. Annu. Rev. Earth Planet. Sci. 2007, 35, 47–72. [Google Scholar] [CrossRef]
- Wegerich, K. Organizational Problems of Water Distribution in Khorezm, Uzbekistan. Water Int. 2004, 29, 130–137. [Google Scholar] [CrossRef]
- Abdullaev, I.; Kazbekov, J.; Manthritilake, H.; Jumaboev, K. Participatory water management at the main canal: A case from South Ferghana canal in Uzbekistan. Agric. Water Manag. 2009, 96, 317–329. [Google Scholar] [CrossRef]
- Awan, U.K.; Ibrakhimov, M.; Tischbein, B.; Kamalov, P.; Martius, C.; Lamers, J.P.A. Improving irrigation water operation in the lower reaches of the Amu Darya River – current status and suggestions. Irrig. Drain. 2011, 60, 600–612. [Google Scholar] [CrossRef]
- Molden, D.J.; Gates, T.K. Performance Measures for Evaluation of Irrigation-Water-Delivery Systems. J. Irrig. Drain. Eng. 1990, 116, 804–823. [Google Scholar] [CrossRef]
- Hashemy Shahdany, S.M.; Maestre, J.M.; van Overloop, P.J. Equitable Water Distribution in Main Irrigation Canals with Constrained Water Supply. Water Resour. Manag. 2015, 29, 3315–3328. [Google Scholar] [CrossRef]
- Luss, H. On Equitable Resource Allocation Problems: A Lexicographic Minimax Approach. Oper. Res. 1999, 47, 361–378. [Google Scholar] [CrossRef]
- Ogryczak, W.; Luss, H.; Pióro, M.; Nace, D.; Tomaszewski, A. Fair Optimization and Networks: A Survey. J. Appl. Math. 2014, 2014, 612018. [Google Scholar] [CrossRef]
- Wang, L.; Fang, L.; Hipel, K.W. Basin-wide cooperative water resources allocation. Eur. J. Oper. Res. 2008, 190, 798–817. [Google Scholar] [CrossRef]
- Kudaybergenov, A.; Kabulov, A.; Kazimbetova, M.; Ametova, G.; Ispanova, J. Three-Stage Lexicographic Allocation on Directed Irrigation Trees with Conveyance Losses and Capacity Constraints: A Closed-Form Stage-1 Fairness Guarantee and Operator–Balance Equivalence. AppliedMath 2026, 6, 178. [Google Scholar] [CrossRef]
- Malaterre, P.-O.; Rogers, D.C.; Schuurmans, J. Classification of canal control algorithms. J. Irrig. Drain. Eng. 1998, 124, 3–10. [Google Scholar] [CrossRef]
- Litrico, X.; Fromion, V. Modeling and Control of Hydrosystems; Springer: London, UK, 2009. [Google Scholar]
- Conde, G.; Quijano, N.; Ocampo-Martinez, C. Modeling and control in open-channel irrigation systems: A review. Annu. Rev. Control 2021, 51, 153–171. [Google Scholar] [CrossRef]
- Clemmens, A.J.; Kacerek, T.F.; Grawitz, B.; Schuurmans, W. Test cases for canal control algorithms. J. Irrig. Drain. Eng. 1998, 124, 23–30. [Google Scholar] [CrossRef]
- Cantoni, M.; Weyer, E.; Li, Y.; Ooi, S.K.; Mareels, I.; Ryan, M. Control of Large-Scale Irrigation Networks. Proc. IEEE 2007, 95, 75–91. [Google Scholar] [CrossRef]
- Mareels, I.; Weyer, E.; Ooi, S.K.; Cantoni, M.; Li, Y.; Nair, G. Systems engineering for irrigation systems: Successes and challenges. Annu. Rev. Control 2005, 29, 191–204. [Google Scholar] [CrossRef]
- Wahlin, B.T.; Zimbelman, D.D. (Eds.) Canal Automation for Irrigation Systems. ASCE Manuals and Reports on Engineering Practice No. 131; American Society of Civil Engineers: Reston, VA, USA, 2014. [Google Scholar] [CrossRef]
- Clemmens, A.J.; Strand, R.J.; Feuer, L.; Wahlin, B.T. Canal automation system demonstration at MSIDD. In Energy, Climate, Environment and Water—Issues and Opportunities for Irrigation and Drainage, Proceedings of the 2002 USCID/EWRI Conference, San Luis Obispo, CA, USA, 9–12 July 2002; U.S. Committee on Irrigation and Drainage: Denver, CO, USA, 2002; pp. 497–506. [Google Scholar]
- Aguilar, J.V.; Langarita, P.; Rodellar, J.; Linares, L.; Horváth, K. Predictive control of irrigation canals—Robust design and real-time implementation. Water Resour. Manag. 2016, 30, 3829–3843. [Google Scholar] [CrossRef]
- Weyer, E. Decentralised PI control of an open water channel. IFAC Proc. Vol. 2002(35), 95–100. [CrossRef]
- Rabbani, T.; Munier, S.; Dorchies, D.; Malaterre, P.-O.; Bayen, A.; Litrico, X. Flatness-based control of open-channel flow in an irrigation canal using SCADA. IEEE Control Syst. Mag. 2009, 29, 22–30. [Google Scholar] [CrossRef]
- Kong, L.; Yang, Q.; Chen, R.; Zhang, Z.; Li, Y.; Shi, Y. Improved proportional integral (PI) controller for water level control in open channel systems: A case study of the Middle Route Project for South-to-North Water Transfer. J. Hydrol. Reg. Stud. 2024, 51, 101646. [Google Scholar] [CrossRef]
- Wahlin, B.T. Performance of model predictive control on ASCE test canal 1. J. Irrig. Drain. Eng. 2004, 130, 227–238. [Google Scholar] [CrossRef]
- Clemmens, A.J.; Wahlin, B.T. Simple Optimal Downstream Feedback Canal Controllers: ASCE Test Case Results. J. Irrig. Drain. Eng. 2004, 130, 35–46. [Google Scholar] [CrossRef]
- Li, Y.; Zhang, Z.; Kong, L.; Yang, Q.; Xu, J.; Chen, Z. Multi-objective predictive control for cascade canal system considering constraints and objectives related to gate regulation. Control Eng. Pract. 2025, 156, 106202. [Google Scholar] [CrossRef]
- Bautista, E.; Clemmens, A.J. Response of ASCE Task Committee test cases to open-loop control measures. J. Irrig. Drain. Eng. 1999, 125, 179–188. [Google Scholar] [CrossRef]
- Howes, D.J.; Burt, C.M. Accuracy of round meter gates for on-farm deliveries. J. Irrig. Drain. Eng. 2016, 142, 04015032. [Google Scholar] [CrossRef]
- Renault, D. Offtake sensitivity, operation effectiveness, and performance of irrigation system. J. Irrig. Drain. Eng. 1999, 125, 137–147. [Google Scholar] [CrossRef]
- Suryavanshi, A.R.; Reddy, J.M. Optimal operation schedule of irrigation distribution systems. Agric. Water Manag. 1986, 11, 23–30. [Google Scholar] [CrossRef]
- Wang, Z.; Reddy, J.M.; Feyen, J. Improved 0-1 programming model for optimal flow scheduling in irrigation canals. Irrig. Drain. Syst. 1995, 9, 105–116. [Google Scholar] [CrossRef]
- Anwar, A.A.; Clarke, D. Irrigation scheduling using mixed-integer linear programming. J. Irrig. Drain. Eng. 2001, 127, 63–69. [Google Scholar] [CrossRef]
- de Vries, T.T.; Anwar, A.A. Irrigation scheduling. I: Integer programming approach. J. Irrig. Drain. Eng. 2004, 130, 9–16. [Google Scholar] [CrossRef]
- Anwar, A.A.; de Vries, T.T.; Bhatti, M.T. Canal operations planner. II: Minimizing inequity. J. Irrig. Drain. Eng. 2016, 142, 04016058. [Google Scholar] [CrossRef]
- de Vries, T.T.; Anwar, A.A.; Bhatti, M.T. Canal operations planner. III: Minimizing inequity with delivery performance ratio relaxation. J. Irrig. Drain. Eng. 2017, 143, 04017038. [Google Scholar] [CrossRef]
- Ramesh, B.; Venugopal, K.; Karunakaran, K. Zero-one programming model for daily operation scheduling of irrigation canal. J. Agric. Sci. 2009, 1, 13–20. [Google Scholar] [CrossRef]
- Balinski, M.L.; Young, H.P. Fair Representation: Meeting the Ideal of One Man, One Vote; Yale University Press: New Haven, CT, USA, 1982. [Google Scholar]
- Pukelsheim, F. Proportional Representation: Apportionment Methods and Their Applications, 2nd ed.; Springer: Cham, Switzerland, 2017. [Google Scholar] [CrossRef]
- Inose, H.; Yasuda, Y. A unity bit coding method by negative feedback. Proc. IEEE 1963, 51, 1524–1535. [Google Scholar] [CrossRef]
- Schreier, R.; Temes, G.C. Understanding Delta-Sigma Data Converters; Wiley-IEEE Press: Hoboken, NJ, USA, 2005. [Google Scholar]
- Bertsimas, D.; Farias, V.F.; Trichakis, N. The Price of Fairness. Oper. Res. 2011, 59, 17–31. [Google Scholar] [CrossRef]
- Bansal, N.; Sviridenko, M. The Santa Claus problem. In Proceedings of the 38th Annual ACM Symposium on Theory of Computing (STOC 2006), Seattle, WA, USA, 21–23 May 2006. [Google Scholar] [CrossRef]
- Kurokawa, D.; Procaccia, A.D.; Wang, J. Fair enough: Guaranteeing approximate maximin shares. J. ACM 2018, 65, 8. [Google Scholar] [CrossRef]
- Delchamps, D.F. Stabilizing a linear system with quantized state feedback. IEEE Trans. Autom. Control 1990, 35, 916–924. [Google Scholar] [CrossRef]
- Brockett, R.W.; Liberzon, D. Quantized feedback stabilization of linear systems. IEEE Trans. Autom. Control 2000, 45, 1279–1289. [Google Scholar] [CrossRef]
- Arunachaleswaran, E.R.; Gopalakrishnan, R. The price of indivisibility in cake cutting. arXiv 2018, arXiv:1801.08341. [Google Scholar]
- Tao, G.; Kokotović, P.V. Adaptive control of plants with unknown dead-zones. IEEE Trans. Autom. Control 1994, 39, 59–68. [Google Scholar] [CrossRef]
- Inaba, H.; Shima, S.; Ando, T.; Kurosawa, T.; Mitsui, N. PWM Control for Power Converter System Utilizing Pulse Dropping at Minimum Pulse Widths. U.S. Patent 4,833,586, 23 May 1989. [Google Scholar]
- Happacher, M.; Pukelsheim, F. Rounding probabilities: Unbiased multipliers. Stat. Decis. 1996, 14, 373–382. [Google Scholar] [CrossRef]
- Ernst, L.R. Apportionment methods for the House of Representatives and the court challenges. Manag. Sci. 1994, 40, 1207–1227. [Google Scholar] [CrossRef]
- Daubechies, I.; Saab, R. A deterministic analysis of decimation for sigma-delta quantization of bandlimited functions. IEEE Signal Process. Lett. 2015, 22, 2093–2096. [Google Scholar] [CrossRef]
- Tijdeman, R. The chairman assignment problem. Discret. Math. 1980, 32, 323–330. [Google Scholar] [CrossRef]
- Cunge, J.A.; Holly, F.M., Jr.; Verwey, A. Practical Aspects of Computational River Hydraulics; Pitman: London, UK, 1980. [Google Scholar]
- Schuurmans, J.; Hof, A.; Dijkstra, S.; Bosgra, O.H.; Brouwer, R. Simple water level controller for irrigation and drainage canals. J. Irrig. Drain. Eng. 1999, 125, 189–195. [Google Scholar] [CrossRef]
- Bandaragoda, D.J. Design and Practice of Water Allocation Rules: Lessons from Warabandi in Pakistan’s Punjab; Research Report 17; International Irrigation Management Institute: Colombo, Sri Lanka, 1998. [Google Scholar]
- Rossman, L.A. EPA/600/R-17/111; Storm Water Management Model Reference Manual Volume II—Hydraulics. U.S. Environmental Protection Agency, Office of Research and Development: Cincinnati, OH, USA, 2017.
- Shreedhar, M.; Varghese, G. Efficient fair queuing using deficit round-robin. IEEE/ACM Trans. Netw. 1996, 4, 375–385. [Google Scholar] [CrossRef]
Figure 1.
Quantised gate and execution rules (abstract actuator, constant level, k = 5). (a) Volume delivered in one step from a closed gate against the requested volume, in units of one resolution step v: a request below k − 1/2 steps is not executed, Equation (3). (b) Daily delivery against the daily plan, in units of the quantum q, for a day of N = 96 steps: direct execution with the whole remaining plan requested at every step, the pulse rule with θ = 0 and θ = 0.5, and the equal split.
Figure 1.
Quantised gate and execution rules (abstract actuator, constant level, k = 5). (a) Volume delivered in one step from a closed gate against the requested volume, in units of one resolution step v: a request below k − 1/2 steps is not executed, Equation (3). (b) Daily delivery against the daily plan, in units of the quantum q, for a day of N = 96 steps: direct execution with the whole remaining plan requested at every step, the pulse rule with θ = 0 and θ = 0.5, and the equal split.

Figure 2.
Daily plan of each regulator in units of its quantum at the lowest level of the day, x/qmin, under direct execution with the quantised actuator, 2010–2019: (a) deadband of 0.5% of the travel (k = 5), the baseline; (b) 0.25% (k = 3); (c) 1% (k = 10). Each point is one regulator-day with a positive plan (vertical jitter for legibility). Orange: days on which the gate never opened; blue: days on which it opened. The dashed lines are the exclusion thresholds 1 − 1/(2k) of Theorem 1(a).
Figure 2.
Daily plan of each regulator in units of its quantum at the lowest level of the day, x/qmin, under direct execution with the quantised actuator, 2010–2019: (a) deadband of 0.5% of the travel (k = 5), the baseline; (b) 0.25% (k = 3); (c) 1% (k = 10). Each point is one regulator-day with a positive plan (vertical jitter for legibility). Orange: days on which the gate never opened; blue: days on which it opened. The dashed lines are the exclusion thresholds 1 − 1/(2k) of Theorem 1(a).

Figure 3.
Error of the pulse rule on the regulator-days operated by pulses only, , for θ = 0, 0.25, 0.5 and 0.75 (quantised actuator, 2010–2019). The dashed lines mark the bounds of Theorem 3, −θ (for plans of at least one pulse) and 1.
Figure 3.
Error of the pulse rule on the regulator-days operated by pulses only, , for θ = 0, 0.25, 0.5 and 0.75 (quantised actuator, 2010–2019). The dashed lines mark the bounds of Theorem 3, −θ (for plans of at least one pulse) and 1.

Figure 4.
Daily error of the execution in units of half a resolution step, , on the 2719 regulator-days served by the equal split (blue) and on the same regulator-days under the pulse rule with θ = 0.5 (orange). The dashed line is the bound of Theorem 1(b).
Figure 4.
Daily error of the execution in units of half a resolution step, , on the 2719 regulator-days served by the equal split (blue) and on the same regulator-days under the pulse rule with θ = 0.5 (orange). The dashed line is the bound of Theorem 1(b).

Figure 5.
Carry-over and accounting periods at R-1, quantised actuator. (a) Daily satisfaction of R-1 in 1–12 April 2010 under ideal execution, direct execution, the pulse rule with θ = 0.5 and the carry-over; the demand of 1–10 April is below one quantum. (b) Error of the delivery over accounting periods of T days, , under the pulse rule with θ = 0.5 and under the carry-over (blocks of T consecutive days from 1 April of each of the ten seasons, the days after the last complete block not used; solid lines: largest, dotted lines: median), and the largest bound of the carry-over over the blocks of each length (dashed).
Figure 5.
Carry-over and accounting periods at R-1, quantised actuator. (a) Daily satisfaction of R-1 in 1–12 April 2010 under ideal execution, direct execution, the pulse rule with θ = 0.5 and the carry-over; the demand of 1–10 April is below one quantum. (b) Error of the delivery over accounting periods of T days, , under the pulse rule with θ = 0.5 and under the carry-over (blocks of T consecutive days from 1 April of each of the ten seasons, the days after the last complete block not used; solid lines: largest, dotted lines: median), and the largest bound of the carry-over over the blocks of each length (dashed).

Table 1.
Outlets of the Dustlik node (PK 114+40). Capacity, gates and irrigated area from the structure passport; seasonal demand from Equation (1). Step volumes of the regulators at the normal level of 3.00 m (Equation (4); k = 5): one resolution step v, the quantum q and the pulse p.
Table 1.
Outlets of the Dustlik node (PK 114+40). Capacity, gates and irrigated area from the structure passport; seasonal demand from Equation (1). Step volumes of the regulators at the normal level of 3.00 m (Equation (4); k = 5): one resolution step v, the quantum q and the pulse p.
| j | Outlet | Capacity, m3 s−1 | Gates | Irrigated area, ha | Seasonal demand, 106 m3 | v, m3 | q, m3 | p, m3 |
| 1 | Abad-Yarmish regulator | 48 | 2 × 8.0 × 2.5 m | 37,161 | 69.7 | 121.1 | 605.4 | 726.5 |
| 2 | R-1 regulator | 0.5 | 1 × 1.5 × 1.5 m | 120 | 0.408 | 8.6 | 43.1 | 51.7 |
| 3 | Khalkabad-2 regulator | 1.0 | 1 × 1.5 × 1.5 m | 637 | 2.16 | 8.6 | 43.1 | 51.7 |
| 4 | Kanly-Yab regulator | 4.0 | 1 × 1.5 × 1.5 m | 3110 | 10.6 | 8.2 | 41.2 | 49.5 |
| 5 | K-2 regulator | 2.0 | 1 × 1.5 × 1.5 m | 1027 | 3.49 | 8.6 | 43.1 | 51.7 |
| 6 | Barrier to lower Kegeyli | 120 | 5 × 8.0 × 2.5 m | 140,545a | 477 | — | — | — |
a Irrigated area of the whole Kegeyli system (182,600 ha) minus the areas of outlets 1–5. The barrier holds the node level, passes the rest of the inflow and usually starts the day open; its discharge is not proportional to the opening, and over the operating range its quantum is 1810–2122 m3 and one resolution step adds at most 375–437 m3 in a control step (Section 2.2).
Table 2.
Simulation cases. Every case was run for the ten seasons 2010–2019 (1 April–30 September). LXB: direct execution; LXB-Tθ: pulse rule (8) with threshold θ; LXB-ES: equal split with pulse fallback; LXB-CO: carry-over with θ = 0.5.
Table 2.
Simulation cases. Every case was run for the ten seasons 2010–2019 (1 April–30 September). LXB: direct execution; LXB-Tθ: pulse rule (8) with threshold θ; LXB-ES: equal split with pulse fallback; LXB-CO: carry-over with θ = 0.5.
| Case | Scenario of the plant | Execution chain | Rules | Purpose |
| phys | baseline | ideal | LXB | reference without quantisation |
| q-main | baseline | quantised actuator | LXB, LXB-T0, LXB-T0.5, LXB-ES, LXB-CO | Theorems 1–4 |
| q-theta | baseline | quantised actuator | LXB-T0.25, LXB-T0.75 | Theorem 3, other θ |
| iot-main | baseline | full device chain | LXB, LXB-T0, LXB-T0.5, LXB-ES, LXB-CO | rules under field devices |
| q-deadband-low | deadband 0.25% (k = 3) | quantised actuator | LXB | Theorem 1(a), k = 3 |
| q-deadband-high | deadband 1% (k = 10) | quantised actuator | LXB | Theorem 1(a), k = 10 |
| q-cd-low | gate coefficient −20% | quantised actuator | LXB | Theorem 1(a), smaller quanta |
| q-cd-high | gate coefficient +20% | quantised actuator | LXB | Theorem 1(a), larger quanta |
| q-leak-005mm | closed regulators leak (0.05 mm) | quantised actuator | LXB | assumption (H1) violated |
| q-rating | outlet rating errors ±10% | quantised actuator | LXB-T0.5, LXB-CO | assumption (H2) violated |
Table 3.
Checks of Theorems 1–4 in the closed loop with the quantised actuator (2010–2019), unless stated. Volumes of the plant, except the debt of Theorem 4, which the rule computes from the estimated volumes; the estimated volumes give the same counts. The regulator-days operated by pulses only, an empirical sample (Section 2.6), include days on which a zero request of the execution program, not rule (8), closed the gate at some steps; means are taken over all regulator-days checked.
Table 3.
Checks of Theorems 1–4 in the closed loop with the quantised actuator (2010–2019), unless stated. Volumes of the plant, except the debt of Theorem 4, which the rule computes from the estimated volumes; the estimated volumes give the same counts. The regulator-days operated by pulses only, an empirical sample (Section 2.6), include days on which a zero request of the execution program, not rule (8), closed the gate at some steps; means are taken over all regulator-days checked.
| Theorem | Setting | Checked | Meeting the stated bound or condition | Note |
| 1(a) | Direct execution, baseline | 77 predicted exclusions | 77 with the gate never open | all at R-1, 1–10 April |
| 1(a) | Direct execution, deadband 0.25% (k = 3) | 24 predicted exclusions | 24 with the gate never open | 66 days without an opening, 66 without water |
| 1(a) | Direct execution, deadband 1% (k = 10) | 83 predicted exclusions | 83 with the gate never open | 83 days without an opening, 83 without water |
| 1(a) | Direct execution, gate coefficient −20% | 77 predicted exclusions | 77 with the gate never open | 77 days without an opening, 77 without water |
| 1(a) | Direct execution, gate coefficient +20% | 77 predicted exclusions | 77 with the gate never open | 77 days without an opening, 77 without water |
| 1(a) | Direct execution, leaking regulators | 77 predicted exclusions | 77 with the gate never open | 77 days without an opening, 0 without water |
| 1(a) | Direct execution, device chain | 77 predicted exclusions | 77 with the gate never open | 77 days without an opening, 77 without water |
| 1(a) | Direct execution, all 7 cases, requests at every step | 5,841,079 positive requests | 5,841,048 within up to | on the predicted days all within and below k − 1/2 steps |
| 1(b) | Equal split, baseline | 2719 regulator-days | 2717 with | largest error 1.005 vmax/2 |
| 2(a), (b) | Recorded supply, quanta at 3.23 m | 1830 days, 649 with λ* < 1 | 1830 with Πind = 0 | — |
| 2(c) | Recorded supply, whole steps of the six outlets at 2.40–3.23 m in steps of 1 cm | 1741 days with supply | 1741 with within the bounds of part (c) | λ* − λv at most 9.6 × 10−4 by part (c), at most 9.2 × 10−4 |
| 3 | Pulse rules, θ = 0–0.75, and equal split | 8705 regulator-days with a positive plan | 8705 with water | the other 445 regulator-days are those of the 89 days without supply |
| 3 | Pulse rule, θ = 0 | 2784 regulator-days operated by pulses only | 2784 with both bounds (14) | mean shortfall 0.0 m3, over-delivery 48.4 m3 |
| 3 | Pulse rule, θ = 0.25 | 2784 regulator-days operated by pulses only | 2784 with both bounds (14) | mean shortfall 1.8 m3, over-delivery 36.4 m3 |
| 3 | Pulse rule, θ = 0.5 | 2784 regulator-days operated by pulses only | 2784 with both bounds (14) | mean shortfall 15.8 m3, over-delivery 14.6 m3 |
| 3 | Pulse rule, θ = 0.75 | 2786 regulator-days operated by pulses only | 2786 with both bounds (14) | mean shortfall 34.9 m3, over-delivery 3.0 m3 |
| 4 | Carry-over, debt (15) | 2764 regulator-days operated by pulses only | 2763 | debt from −1.02 to 0.49 pmax |
| 4 | Carry-over, blocks of T = 1, 10, 30 and 183 days, R-1 | 2080 blocks | 2080 within | largest error 0.84 of the bound |
Table 4.
Outcome of the execution rules, 2010–2019 (1830 days). Mean daily worst-user satisfaction λ of the six outlets; days with λ = 0; shortfall and over-delivery of the five regulators, and over all their days, in % of ; seasonal delivery ratio of R-1, mean over the seasons; unweighted mean error of R-1 over the calendar dekads, ; and the mean number of movements of the gate of R-1 on the days with a positive plan (quantised actuator).
Table 4.
Outcome of the execution rules, 2010–2019 (1830 days). Mean daily worst-user satisfaction λ of the six outlets; days with λ = 0; shortfall and over-delivery of the five regulators, and over all their days, in % of ; seasonal delivery ratio of R-1, mean over the seasons; unweighted mean error of R-1 over the calendar dekads, ; and the mean number of movements of the gate of R-1 on the days with a positive plan (quantised actuator).
| Execution | Rule | Mean daily λ | Days with λ = 0 | Shortfall, % | Over-delivery, % | Seasonal delivery ratio of R-1 | Dekad error of R-1, fraction of demand | Gate movements of R-1 per day |
| Ideal | Commands executed exactly | 0.8117 | 89 | 0.005 | 0.000 | 0.845 | 0.000 | — |
| Quantised actuator | Direct execution | 0.7677 | 166 | 0.025 | 0.024 | 0.847 | 0.048 | 1.9 |
| Quantised actuator | Pulse rule, θ = 0 | 0.8111 | 89 | 0.022 | 0.038 | 0.855 | 0.073 | 2.0 |
| Quantised actuator | Pulse rule, θ = 0.25 | 0.8067 | 89 | 0.024 | 0.033 | 0.851 | 0.069 | — |
| Quantised actuator | Pulse rule, θ = 0.5 | 0.8039 | 89 | 0.029 | 0.024 | 0.847 | 0.065 | 2.0 |
| Quantised actuator | Pulse rule, θ = 0.75 | 0.7968 | 89 | 0.036 | 0.020 | 0.841 | 0.068 | — |
| Quantised actuator | Equal split with pulse fallback | 0.8100 | 89 | 0.023 | 0.022 | 0.846 | 0.061 | 62.3 |
| Quantised actuator | Carry-over | 0.7836 | 126 | 0.034 | 0.035 | 0.845 | 0.010 | 2.0 |
| Device chain | Direct execution | 0.7677 | 166 | 0.035 | 0.034 | 0.847 | 0.048 | — |
| Device chain | Pulse rule, θ = 0 | 0.8111 | 89 | 0.032 | 0.051 | 0.855 | 0.073 | — |
| Device chain | Pulse rule, θ = 0.5 | 0.8041 | 89 | 0.038 | 0.036 | 0.847 | 0.066 | — |
| Device chain | Equal split with pulse fallback | 0.8085 | 89 | 0.035 | 0.030 | 0.846 | 0.061 | — |
| Device chain | Carry-over | 0.7831 | 127 | 0.046 | 0.045 | 0.845 | 0.010 | — |
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2026 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).
Copyright: This open access article is published under a Creative Commons CC BY 4.0 license, which permit the free download, distribution, and reuse, provided that the author and preprint are cited in any reuse.